A0001 Amendment.Update Part.NonManuf Rule.pdf
PDF 295 KB Posted
- Attached to
- Slide Fasteners
- Solicitation number
- CT2373-25
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for the Department of Justice, Federal Prison Industries. The amendment relates to Various Berry Amendment Slide Fasteners, specifically updating details for UNICOR Part Number ZIP0037, a zipper chain with the following specifications: continuous monofilament chain, Type I, Style 2, Size 9, 3/4" width, in Camo Green #483 color.
The amendment makes two key changes: 1) Adding detailed specifications for the zipper chain, including size, width, and color, with a requirement that a Certificate of Compliance and Test Reports must accompany each shipment, and 2) Modifying the Non-Manufacturer Rule on page 29 to replace HUBZone Small Business with Small Business. The modification stipulates that for contracts set aside for small businesses, non-manufacturers must provide products manufactured by another small business in the United States, which will be verified through the Place of Performance clause.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Business_Mgmt_Quest_.pdf | ||
| Credit Release Authorization.pdf | ||
| SF1449.pdf | ||
| UNICORACH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
A0001 08/13/2025
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
DOJ, FEDERAL PRISON INDUSTREIS
400 1ST ST, NW, 6TH FLOOR,CLOTHING AND TEXTILES
WASHINGTON, DC 20534
Harley Jacobson Harley.jacobson2@usdoj.gov
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x) 9A. AMENDMENT OF SOLICITATION NO.
Undetermined Source
CT2373-25 x
9B. DATED (SEE ITEM 11)
07/24/2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers __ is extended, __is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
D. OTHER (Specify type of modification and authority)
E. IMPORTANT : Contractor _x_ is, _ is not required to sign this document and return 1 copies to the issuing office for file.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
COMMODITY: Various Berry Amendment Slide Fasteners
The purpose of this amendment is to:
1. Update the description of ZIP0037.
2. Take out HUBZone Small Business under the NON-MANUFACTURER RULE on page 29 of 63, and replace it with Small Business.
3.
See Page 2 for information.
All other terms and conditions of the solicitation remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Harley Jacobson
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
_______________________________________ BY
Signature of the person/authorized to sign) (Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR(48 CFR) 53.243
A0001, Page 2
CT2373-25
08/13/2025
• Added the Size 9 and Width of ¾”. See below:
CHAIN, IAW,A-A-55634,TYPE-I,STYLE-2
UNICOR PART NUMBER: ZIP0037
DESCRIPTION: ZIPPER CHAIN
ADJECTIVE: CONTINOUS MONOFILAMENT CHAIN
TYPE: I
STYLE:2
SIZE:9
WIDTH:3/4"
COLOR: CAMO GREEN #483
U/M: YD
M/L: IAW A-A-55634
CONTINUOUS MONOFILAMENT CHAIN, TAPE 3/4" COLOR CAMO GREEN #483. ((THE
SPECIFICATION ON THE ZIPPER, V-F-106E, HAS BEEN SUPERSEDED BY COMMERCIAL
ITEM DESCRIPTION A-A-55634.) A CERTIFICATE OF COMPLIANCE AND TEST
REPORTS MUST ACCOMPANY EACH SHIPMENT.
• On page 29 of 63, Replace HUBZone Small Business with Small Business of the NON- MANUFACTURER RULE. The corrected language reads:
NON-MANUFACTURER RULE APPLIES: A recipient of a contract set aside for a Small business, other than the actual manufacturer or processor, must provide the products manufactured by another small business in the United States.
Note: If you are not the manufacturer, then you must supply items/products manufactured by a Small Business in the US. This will be verified by 52.215-6, Place of Performance, which is required to be completed under PART IV. A small company using a Large Business to supply them these items will not be considered for award.
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
| 2025-08-13T13:20:41-0500 | |
| HARLEY JACOBSON |
File details come from the government source that posted it. Updated .