CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 1 of 7
ATTACHMENT 1
U.S. Department of Transportation Volpe National Transportation Systems Center
Preparation Work for WindTracer LiDAR Installation Combined Synopsis/Solicitation #6913G622Q300003
Statement of Work
Introduction/Background
The John A. Volpe National Transportation System Center (Volpe), in support of FAA and its NextGen project, operates four units of the Lockheed Martin WindTracer Light Detection And Ranging (LiDAR). As part of the ongoing Research and Development for FAA's NextGen project, one of these LiDARs will need to be deployed in Burlingame, CA to capture wake vortices from aircraft landing on Runway 28s at San Francisco International Airport (SFO). In preparation for this, power will need to be provided to the test site. See SFO Power Figures v1 for maps and images of the site.
Scope of Work
The LiDAR will require 220V and 100A of service for operation. The closest access point to the electrical gird is through Pacific Gas & Electric (PG&E), the local utility provider. There is a transformer 310 feet from the new breaker installation point. The contractor shall obtain all the necessary permits and provide all labor and material for this work, including any subcontractors they might need for this project
Work Requirement
CLIN 00100: WindTracer Power Run
A. Site Preparation / Permitting
The contractor shall obtain all the required permits for working on the property and connecting to PG&E power grid. The contractor is responsible for contacting Dig Safe prior to work.
B. Trenching / Conduit
A trench for cable conduit will be needed, 24-inch inches deep, between the transformer and the required location. The approximately 310 foot trench must be dug by hand due to existing infrastructure in the ground. This will require heavy machinery to break through the concrete.
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 2 of 7
C. Electrical Infrastructure Installation
Install one new 100 amp, 120/240 volt single phase pedestal style meter main near existing PG&E underground splice box. Install approximately 300 feet of metal conduit and wire and terminate in one 50 amp outdoor receptacle with a disconnect switch to the identified location. A 30 Amp and 20 Amp breaker should be installed in the outdoor receptacle. Due to the length of the power run, step-up and step-down transformers are required. The component specifications of the requirements are at the discretion of the contractor and shall be compliant with local electrical codes.
D. Site Restoration / Final Inspection
The trench needs to be back filled with native soil and base rock and new asphalt installed.
The contractor should conduct final walk through with inspectors to close out permits.
All bids should include electrical license number.
Period of Performance
The period of performance shall be date of award through November 30, 2021.
Place of Performance
The location (more explicitly shown in the attached drawings/photographs) will be an empty parking lot across from:
411 Airport Blvd
Burlingame, CA 94010
Inspection and Acceptance
The contractor shall schedule a final walk‐through inspection of the site with the Volpe TPOC upon completion of the site at the installation site. The contractor shall certify in writing via an email to the Volpe TPOC that the site is complete, meets all contract requirements, and is safe for use and attach any permitting documentation no more than 1 business days after the final inspection.
Volpe TPOC
Amir Tabrizi Amir.Tabrizi@dot.gov 617-494-2711
Other Requirements
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 3 of 7
Security and Access to the Site:
Access to the site shall be coordinated with Volpe TPOC prior to visit.
COVID-19
The field team will continue to comply with CDC guidelines and California Mandatory Safety Standards for Workplaces and update practices as needed. All local rules and regulations regarding COVID-19 and vaccination will be adhered to.
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 4 of 7
USDOT The Volpe Center
Combined Synopsis/Solicitation #6913G622Q300003
Figures for SFO Power Installation
Figure 1. Site Location for the Power Installation (37.591874, -122.338591)
Power Installation Location
(37.591874, -122.338591)
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 5 of 7
Figure 2. Breaker and PG&E Power Location
Proposed Breaker Location 37.591874, -122.338591
300 Feet
PG&E Power Location
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 6 of 7
Figure 3. Picture of Site
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation P. 7 of 7
Figure 4. PG&E Transformer
File details come from the government source that posted it. Updated .