ATTACHMENT #6
CSS#6913G622Q300003 Preparation Work for WindTracer LiDAR Installation 1
Questions Q.1.
A.1.
Q.2.
A.2.
Q.3 A.3.
Q.4.
A.4.
Q.5.
A.5.
Q.6.
A.6.
11/4/2021
Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has
Do we need to have a valid CA electrical license?
U.S. D.O.T. The Volpe Center CS/S Submission: Combined Synopsis/Solicitation (CS/S) #6913G622Q300003
*CS/S Number 6913G622Q300003 in the Subject Line of the email.
This is a new requirement per our scope of work. There might be existing infrastructure in place, but none done for this project nor by Volpe.
What is the cost proposal for this opportunity?
The contractor should coordinate with PG&E to set up a time to connect this power line to the PG&E power lines. PG&E provides electricity to that area, so we need to tap into their power.
Answers
If applicable, can you please send along the incumbent contract or task order number?
What is the tie in with PG&E what is there role in this opportunity?
*Quotes due by email to elizabeth.mcdannell@dot.gov by 4PM PST on Friday, November 05, 2021.
Not applicable.
As stated in Notice: This is a Total Small Business Set-Aside FAR 19.5, and conducted under FAR Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures.
As stated in Notice: Attachment 1: P. 2 of 7: Period of Performance The period of performance shall be date of award through November 30, 2021.
As stated in Notice: Attachment 1: P. 2 of 7: All bids should include electrical license number.
How long is the project expected to last?