CSP52-26 - Front ends and Specs.pdf

PDF 19 MB Posted

Attached to
Esperanza Water Works Electrical Improvements Re-Bid
Solicitation number
CSP52-26
Issued by
El Paso County, Texas

About this file

This is a specifications and front-end documentation file for the Esperanza Water Works Electrical Improvements Re-Bid project in Fort Hancock, Texas, managed by the relevant local water authority. The project encompasses the installation of new electrical service infrastructure at two primary sites: the Reverse Osmosis (R.O.) facility and the Well Site, both located north of Interstate 10 on Wilkey Road. Work includes new El Paso Electric Service connections, electrical metering and disconnect equipment, transfer switches, generators, control panels, docking stations, and HVAC unit power infrastructure. Additionally, the project extends electrical service from the Well Site to a nearby above-ground storage tank to support lighting and instrumentation. The scope incorporates low-voltage wiring installation through duct bank systems with pullboxes, comprehensive cable testing, trenching, and backfill operations. Critical to project execution is the requirement that both existing sites remain fully operational throughout construction, necessitating continued use of existing temporary generators until new service infrastructure is installed, tested, commissioned, and transitioned to operational status. New equipment foundations, concrete slabs, and structural supports must be constructed according to project drawings and specifications.

The specifications document details the technical and construction requirements necessary for delivering a first-class operating facility upon project completion. The re-bid designation indicates this project was previously solicited and is being re-offered to the contractor market. Specific pricing terms, bidding deadlines, site visit requirements, pre-bid conference details, and award timelines are contained within the full project documentation. The project requires coordination with existing utility providers and strict adherence to operational continuity protocols to prevent service interruption during the transition to new electrical infrastructure.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .