CSD26001-WH_BPA_ad1.pdf

PDF 1 MB Posted

Attached to
CSD William Henry School Bid Pac A Demolition
Solicitation number
CSD26001-WH_BPA
Issued by
Kent County, Delaware

About this file

This is an Addendum No. 1 issued by Richard Y. Johnson & Son, Inc. (Construction Manager) on behalf of the Capital School District for the demolition of William Henry School located at 65 Carver Road, Dover, Delaware. The project, designated as Bid Pac A Contract A-1, involves the complete demolition of the existing William Henry School building and selective demolition of an attached structure, with associated erosion and sediment controls. The scope of work requires contractors to remove all refrigerants from HVAC units, drinking fountains, PTAC units, and wall units; disconnect electrical systems; remove all sidewalks and paving within the lines of demarcation; separate the building at the connection point to the Kent County Community Center while maintaining a waterproof and accessible enclosure; and comply with all asbestos abatement contractor responsibilities as outlined in the provided asbestos report. The pre-bid meeting was held on August 5, 2026, at 10:00 a.m. at William Henry School, and sealed bids are due by 12:00 p.m. on August 20, 2026, at the Capital School District Office located at 198 Commerce Way, Dover, Delaware, with public bid opening at 2:00 p.m. at William Henry School's auditorium. The demolition is scheduled to start in late September with an expected four-month completion duration. Written requests for information (RFIs) must be submitted by 12:00 noon on Friday, August 14, 2026, to Construction Manager Jesse Dixon at jdixon@ryjson.com.

A 10 percent bid bond is required with each submission, and performance and payment bonds equal to 100 percent of the contract price are required upon contract execution. This is a state wage-rated project subject to Delaware prevailing wage requirements under Delaware Code Title 29, Section 6960. All prime contractors must submit signed affidavits certifying compliance with employee drug testing regulations and craft training requirements. Contractors are responsible for obtaining all permits, licenses, and inspection fees except the demolition permit, which the owner provides. The contractor bears the cost of repairing any utility damage resulting from failure to properly locate underground utilities, while the owner bears impact and user fees. Bids remain binding for thirty days following opening, and award will be made to the lowest responsive and responsible bidder within thirty days of bid opening. Construction documents are available through www.ryjson.com or may be purchased from RCI Printing & Graphics in New Castle, Delaware, and bidders must use the full set of bidding documents from the RYJ website rather than documents available on the MyMarketplace State of Delaware website.

View the file

Other files

File Type Posted
CSD26001-WH_BPA_specs.pdf PDF
CSD26001-WH_BPA_epp.pdf PDF
CSD26001-WH_BPA_pw.pdf PDF
CSD26001-WH_BPA_itb.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Richard Y. Johnson & Son, Inc. 18404 Johnson Rd PO Box 105

General Contractors & Construction Managers Lincoln, DE 19960

Serving Delaware Since 1946 Phone 302-422-3732 www.ryjson.com Fax 302-422-4696

CSD William Henry Building Demolition Bid Pac A Contract 1

August 7, 2026

Addendum No. 1

Attention all Prospective Bidders:

The following clarifications, changes and /or additions shall by this reference be incorporated into the contract documents as though dully set forth therein.

Addendum No. 1 consists of:

RYJ Written directive (3 pages) Pre-Bid Meeting Agenda (2 pages) Pre-Bid Meeting Sign in Sheet (1 page)

Non – Technical Specifications

NOTE: All Prime Contractors are responsible for bidding from a full set of bidding documents.

This project is a State wage rated project.

No administrative items shall be delivered to the job site.

All correspondence with Architect, Engineer, Owner, Etc. must go through this office.

Application for Payment

All bills are due the 25th of the month. Bills must be on for AIA G702/CMa. Billing will not be processed early, late bills will be rejected.

A total of five copies of each bill and corresponding waiver (one notarized original and 4 copies) are required.

Faxed copies will not be accepted.

General Conditions

Please refer to Section 9.3.2; any stored material (including on-site storage) being billed during a pay period must be insured and a certificate of stored material be included with your application for payment. Your payment will not be processed and your bill will be rejected for that period.

Stored materials must stay in the stored materials column, and must be insured, until the material has been incorporated into the building.

CSD William Henry Building Demolition Bid Pac A Addendum No. 1 www.ryjson.com

Shop Drawings, Product Data and Samples

Submittals are to be submitted via email for review and approval, if certain items are deemed not emailable then ten (10) copies of all submittals are required. Inadequate amounts will be rejected.

Section 004126 – Bid Form

NO CHANGE; Bid Date is August 20th, 2026 at 2:00pm. William Henry School is located at 65 Carver Road Dover Delaware 19904 bids will be read aloud in the auditorium. All mailed bids must be received by 12:00pm the day of the bid opening, August 20, 2026 at the Capital School District Office located at 198 Commerce Way, Dover Delaware 19904.

Bidders Questions + Clarification

RFI No. Description

RFI 1

Question 1:

Are as built drawings available?

Answer:

No, As-built drawings are available, review bid documents.

Question 2:

Can you issue the asbestos report? The link in the spec doesn't work.

Answer:

See Below Link, Link is also available on the website of www.ryjson.com under plan room.

https://www.dropbox.com/scl/fo/df16ti5kweu5rf4pdlb6r/AMpQgsV_uAPnPjryQbZXiFQ?rlkey=c1

4q8h6e2r1d7a246gozaen3s&st=v0lrupc0&dl=0 Question 3:

Can the schedule shown in the spec be updated?

Answer:

Demolition to Start late September, Completion expected to be a 4 month duration.

Question 4:

Is the abatement contractor removing the Universal Wastes?

Answer:

Review asbestos report for asbestos contractors responsibility.

Question 5:

Who is removing the refrigerants? RTU, drinking fountains, PTAC, wall units, etc.

Answer:

Contract A-1 Demolition is responsible.

Question 6:

Are we to separate the building where it enters the Kent County Community Center? Who provides a weather tight enclosure?

Answer:

Correct, 2 double doors are at the connection point, contractor is to make it waterproof and accessible.

Question 7:

Are there fiber optic lines that must be disconnected?

Answer:

CSD William Henry Building Demolition Bid Pac A Addendum No. 1 http://www.ryjson.com/ https://www.dropbox.com/scl/fo/df16ti5kweu5rf4pdlb6r/AMpQgsV_uAPnPjryQbZXiFQ?rlkey=c14q8h6e2r1d7a246gozaen3s&st=v0lrupc0&dl=0 https://www.dropbox.com/scl/fo/df16ti5kweu5rf4pdlb6r/AMpQgsV_uAPnPjryQbZXiFQ?rlkey=c14q8h6e2r1d7a246gozaen3s&st=v0lrupc0&dl=0

To be answered in future addendum.

Question 8:

Who disconnects the electric? Is the power to the school furnished from District owned transformers?

Answer:

Contract A-1 Demolition is responsible for disconnection; transformer owned by City of Dover;

coordinate with the City of Dover.

Question 9:

Are we to remove all sidewalks and paving out to the LOD?

Answer:

Correct

End of Addendum No. 1

CSD William Henry Building Demolition Bid Pac A Addendum No. 1

All mailed bids must be received by 12:00pm the day of the bid opening, August 20, 2026 at the Capital

School District Office located at 198 Commerce Way, Dover Delaware 19904.

Bidder bears the risk of late delivery.

18404 Johnson RdRichard Y. Johnson & Son, Inc.

PO Box 105

General Contractors & Construction Managers Lincoln, DE 19960 Serving Delaware Since 1946 Phone 302-422-3732 www.ryjson.com Fax 302-422-4696

PRE-BID MEETING

August 5, 2026

10:00am

CSD William Henry School Building Demolition

Project No. 1630

Bid Pac A

Agenda

1. Attendees at Pre-Bid Meeting Owner-Capital School District – James Baustert

Construction Manager – Richard Y. Johnson & Son, Inc.

Architect – ABHA

2. Review projects' description and time frame

- You will be bidding Bid Pac A -

A-1 Building Demolition

- Project involves the complete demolition of the Existing William Henry School with associated erosion and sediment controls.

3. Review Bid date and location

- August 20, 2026 @ 2:00pm

- William Henry School is located at 65 Carver Road Dover Delaware 19904 bids will be read aloud in the auditorium.

4. Review the bidding procedures and bonding requirements

- You are bidding a full set of documents.

- You must use bid form provided in bid documents and/or as revised in Addendums

- Review scope of work, section 011100 Summary of Work

- No exclusions from your scope of work or bid will be rejected!!

- 10% Bid Bond is required.

- Public bid opening.

- This is a NON-MANDATORY pre-bid meeting.

5. Review the Project

- Owner to provide demolition permit; contractor provides all other permits, licenses and inspection fees

- Zero (0) Alternates

- Zero (0) Allowances

- Zero (0) Unit Prices

6. Receive Bidding questions – R. F. I. to be forwarded to Construction Manager. Email address is jdixon@ryjson.com.

- RFI's to be in written form only, with plan number or specification number noted with question.

- No RFI's shall be accepted after 12 noon on Friday, August 14, 2026.

CSD William Henry School Building Demolition Pre-Bid Meeting Agenda mailto:jdixon@ryjson.com www.ryjson.com jessedixon Highlight

- State prevailing wage rates apply. (Wage Rate Sheet is located in project specifications)

7. Bidding documents

- www.ryjson.com under plan room

- Additional contract Documents and partial sets can be purchased at

RCI Printing & Graphics, 298 Churchmans Road, New Castle Delaware, (302) 328-5019

-Documents Shown on My Market Place State of Delaware website are NOT for Bidding.

For Bidding, you must use the documents from the RYJ website.

8. Drug Testing/Craft Training Requirements

-All Prime Contractors are to include a signed affidavit that is included in the project documents.

9. Review Subcontractor List Requirements

10. Site Visit: View after Pre-Bid Meeting

11. Receive questions

12. Summation and Conclusion

CSD William Henry School Building Demolition Pre-Bid Meeting Agenda http://www.ryjson.com/

CSD William Henry School Buiding Demolition Addendum 1_RYJ.pdf
Pre-Bid Agenda CSD William Henry Demoliton Bid Pac A
Pre-Bid Sign in Sheet William Henry Bid Pac A

File details come from the government source that posted it. Updated .