This is an Addendum One to the Bid Manual for the 2021 Crushed Aggregate Materials Supply Contract issued by Kenosha County Department of Public Works & Development Services in Wisconsin. The contract requires contractors to furnish, deliver, and stockpile 3/4" crushed aggregate base material to the Kenosha County Wilmot Pit Facility located at 32303 116th Street, Wilmot, Wisconsin. The material must meet Section 305.2.2.1 of the General Specifications with specific gradation requirements across multiple sieve sizes. Sealed bids were due by 1:15 p.m. on February 25, 2021, at the Office of the Kenosha County Highway Commissioner, 19600 75th Street, Suite 122-1, Bristol, Wisconsin 53104. All bidders were required to file a Bidders Proof of Responsibility Form (Form PA-10) by 3:00 p.m. on February 19, 2021. Questions on contract documents were to be submitted by 3:00 p.m. on February 22, 2021, with answers provided by 3:00 p.m. on February 23, 2021. Bid results were to be emailed to all bidders by 12:00 p.m. on Friday, February 26, 2021.
Addendum One, dated February 22, 2021, revised the project specifications by removing stockpiling and grading requirements from Item No. 1, clarifying that the County would no longer require the contractor to stockpile delivered gravel using a loader. The contractor must perform gradation testing at minimum intervals of one test per 1,000 tons of material furnished, with costs borne by the contractor and results provided weekly to the County. Payment is based on quantities weighed by the contractor's scale after verification by the Project Engineer, at the contract unit price per ton of material furnished and delivered. Materials not conforming to the specified 3/4-inch gradation specifications will be paid at 50 percent of the unit bid price as a penalty. Kenosha County reserves the right to conduct random independent material testing for quality control at County expense. One final payment is anticipated upon completion of all contract work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clement Abongwa, Director
Division of Highways
19600 75th Street, Suite 122-1
Bristol, Wisconsin 53104
(262) 857-1870
Fax: (262) 857-1885
Raymond G. Arbet, Director
Department of Public Works & Development Services
CRUSHED AGGREGATE MATERIALS SUPPLY
ADDENDUM ONE DATED 2/22/21
Revisions and Clarifications:
• Revised Project Specifications Item No. 1: Part of stockpiling section no longer required and has been removed from the specification.
Questions and Answers:
Q. Does the County wish to have the awarded contractor provide a loader to stockpile the delivered gravel at the County locations?
A. The County will no longer require that the contractor stockpile the delivered gravel. As such, the information within the Item No. 1 specification relating to stockpiling/grading has been removed as part of this addendum.
Attachments:
• Revised Project Specification sheet
End Addendum 1
COUNTY OF KENOSHA
PROJECT SPECIFICATIONS
ITEM NO. 1 - FURNISH, DELIVER AND STOCKPILE 3/4" CRUSHED AGGREGATE BASE
MATERIAL TO KENOSHA COUNTY WILMOT PIT FACILITY
The unit bid and contract price for this item shall include the complete furnishing, delivery and stockpiling of crushed aggregate at the Wilmot Pit Facility at 32303 116th Street, Wilmot, WI (See Exhibit A and Exhibit B), and to the details shown on the Contract Drawings and in conformance with the General Specifications.
3/4" Crushed Aggregate Material shall meet the general requirements of Section 305.2.2.1 of the General Specifications with a modified 3/4" Gradation as follows:
SIEVE SIZE 3/4 INCH (19.0 mm) 3 inch (75 mm) ----
1 ½ inch (37.5 mm) ---- 1 ¼ inch (31.5 mm) ---- 1 inch (25.0 mm) 100 ¾ inch (19.0 mm) 95 - 100 3/8 inch (9.5 mm) 50 - 90 No. 4 (4.75 mm) 35 - 70
No. 10 (2.00 mm) 15 - 55 No. 40 (425 um) 10 - 35 No. 200 (75 um) 8.0 - 15.0 (modified)
Stockpiling
The final product storage area shall be as shown on the Contract Drawing (Exhibit B) or as marked in the field by the Owner. The top of the stockpile shall be sloped daily so as to allow effective runoff of water from rain. If a crawler dozer is used to grade the stockpile, all foreign material shall be removed from the tracks, rails, etc. prior to going onto the stockpile so as to prevent material contamination.
Material Testing
The Contractor shall perform gradation testing on the contract material at minimum intervals of one test for every 1,000 Ton of material furnished and delivered.
All gradation testing shall be conducted in accordance with Section 301 of the General Specifications and shall be furnished and paid for by the Contractor.
Any contract materials which have a final tested gradation that is not in conformance with the above specified ranges of Gradation will be paid for at 50% of the unit bid price as a penalty for substandard crushed gravel in this Contract.
Copies of gradation test results shall be furnished to the Owner on a weekly basis. The Owner reserves the right to reject materials or pay 50% of the unit bid price for any crushed aggregate material which is not in conformance with the required 3/4-Inch Gradation specification.
Kenosha County also anticipates conducting random independent material testing for quality control purposes. Kenosha County will assume the costs for the independent quality control material testing.
DCoeur Line
DCoeur Line
PROJECT SPECIFICATIONS
Contract Measurement
The Contractor shall utilize a permanent scale, portable scale, or other approved device for scaling the quantities of contract material.
Payment shall be based on quantities weighed by the Contractor's scale after verification by the Project Engineer. Weight tally receipts for crushed aggregate materials shall be given to the Owner at the end of each working day for review.
Payment will be made at the contract unit price per ton of crushed aggregate material furnished, delivered and stockpiled to the Kenosha County Wilmot Pit Facility complete. One final payment is anticipated to be made upon completion of all contract work.