This solicitation package includes plans and specifications for the Crescent City Harbor FY20 Maintenance Dredging Project. The work includes maintenance dredging of the Crescent City Marina Access Channel to -15 feet MLLW plus 1 foot of overdepth allowance, and transporting dredged material to the Whaler Island Nearshore Site disposal location. Additional services include disposal site preparation and dredged material management. The solicitation will be issued on or around June 12, 2020 as a total small business set-aside and conducted as an invitation for bids. The estimated cost range is between $1 million to $5 million. Bids are due on or around July 13, 2020 at 1:00 pm PDT. Interested parties must register in the System for Award Management to access solicitation documents on the Beta.SAM.gov website. The Department of the Army Corps of Engineers Engineering District San Francisco is the issuing agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Crescent City FY20 OF 1419.pdf | ||
| Crescent City FY20 OF 1419A.pdf | ||
| Crescent City FY20 OF 1419.pdf | ||
| Crescent City Solicitation Amendment 1.pdf | ||
| Crescent City FY20 Solicitation and Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M A
R K
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
O
F
E
N G
I N
E E
R S
S A
N
F
R A
N C
I S
C
D
I S
T R
I C
T
G
O L
D E
N
G
A T
E
A
V E
S A
N
F
R A
N C
I S
C O
C
A
D E
L
N
O R
T E
U
N T
Y
C
A L
I F
O R
N I A
C R
E S
C E
N
T
Y
H
A R
B O
R
F
Y
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
P
R O
J E
C T
C:\Users\L3ET9FS9\Desktop\E-Documents\O&M\Crescent City\FY20\Plans\CAD\ Crescent_City_O&M_2020 (G).dwg 02 Jun 2020 - 1:07pm
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F
S
U N
F
S
U N
B
W
A I R
S
H
A
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
J U
N
W
P
B
W
P
C
X
X
D E
S C
R I P
T I O
N D
A T
E
D R
A W
I N
G
N
O : C
C
SOLICITATION
US Army Corps of Engineers
San Francisco District
DEL NORTE COUNTY, CALIFORNIA
CRESCENT CITY HARBOR FY20
MAINTENANCE DREDGING PROJECT
SOLICITATION NO: W912P7-20-B-0011
CONTRACT NO: W912P7-20-C-00XX
ISSUE DATE: JUNE 2020
SUBMITTED BY:
SON T. HA, P.E., P.M.P. DATE
CHIEF, ENGINEERING BRANCH
APPROVED BY:
SUSAN KELLY, P.E., P.M.P. DATE
CHIEF, ENGINEERING AND TECHNICAL SERVICES DIVISION
PREPARED UNDER THE DIRECTION OF:
JOHN D. CUNNINGHAM, P.E., P.M.P.
LT. COLONEL, DISTRICT COMMANDER
THIS PROJECT WAS DESIGNED BY THE SAN FRANCISCO DISTRICT OF
THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES
AND REGISTRATION DESIGNATIONS OF INDIVIDUALS THAT APPEAR
ON THESE PROJECT DOCUMENTS ARE WITHIN THE SCOPE OF THEIR
EMPLOYMENT AS REQUIRED BY ER1110-1-8152.
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF DRAWINGS IN THIS SET.
G-01
C O
V E
R S
H E
E T
LOCATION MAP
NOT TO SCALE
PROJECT
AREA
WHALER ISLAND
NEARSHORE SITE
MARINA ACCESS
CHANNEL
INNER HARBOR
BASIN CHANNEL (NIC)
ENTRANCE
CHANNEL (NIC)
CITIZEN'S DOCK
G-02
M A
R K
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S A
N
F
R A
N C
I S
S
T R
I C
T
G
O L
D E
N
G
A T
E
A
V E
S A
N
F
R A
N C
I S
C O
C
A
D E
L
N
O R
U
N T
Y
C
A L
I F
O R
N I A
C R
E S
C E
T
Y
H
A R
B O
R
F
Y
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
P
R O
J E
C T
C:\Users\L3ET9FS9\Desktop\E-Documents\O&M\Crescent City\FY20\Plans\CAD\ Crescent_City_O&M_2020 (G).dwg 02 Jun 2020 - 9:33am
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F
S
U N
F
S
U N
B
W
A I R
S
H
A
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
J U
N
W
P
B
W
P
C
X
X
D E
S C
R I P
T I O
N D
A T
E
D R
A W
I N
G
N
O : C
C
SOLICITATION
S C
H E
D U
L
D
R A
W I N
G S
G
E N
E R
A
T
E S
A N
D
T
Y P
I C
R E
D G
I N
G
S
E C
T I O
N
VERTICAL CONTROL
VERTICAL CONTROL: "B.M. TIDAL 20" 1959 RESET 1960, USC&GS
DISK, 13.46' MLLW, LOCATED AT COORDINATES N2526793.45,
E5965753.79.
HORIZONTAL GPS CONTROL
COAST GUARD D-GPS
2' ALLOWABLE OVERDEPTH
(PAID AND NON-PAID)
EL. 0.00 FEET M.L.L.W.
1' ALLOWABLE (PAID) OVERDEPTH
PROJECT DEPTH
NOTE:
SEE SPECIFICATION SECTION 35 20 23 (DREDGING) FOR DETAILS
1' ALLOWABLE OVERDEPTH (NON-PAID)
GENERAL NOTES:
1. BATHYMETRIC SURVEYS PERFORMED BY THE U.S ARMY CORPS OF
ENGINEERS, SAN FRANCISCO DISTRICT ON 07 FEBRUARY 2020 FOR THE
CRESCENT CITY HARBOR.
2. BATHYMETRIC SURVEY SOUNDINGS ARE BASED ON THE DATUM OF MEAN
LOWER LOW WATER (MLLW) AT THE LOCALITY.
3. DRAWINGS ARE NOT TO BE USED AS NAVIGATION CHARTS.
4. INFORMATION SHOWN ON THE DRAWINGS IS BASED ON BATHYMETRIC
SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED
FOR THE GENERAL CONDITIONS EXISTING AT THAT TIME.
5. BATHYMETRIC SURVEY SOUNDINGS WERE TAKEN BY FATHOMETER
(MULTI-BEAM SURVEY EQUIPMENT) AND ARE SHOWN TO THE NEAREST TENTH
OF A FOOT.
6. COORDINATES ARE BASED ON THE CALIFORNIA STATE PLANE COORDINATE
SYSTEM OF 1983 (CCS83), LAMBERT CONFORMAL PROJECTION ZONE I, IN FOOT,
AS DESCRIBED IN SPECIAL PUBLICATION NO. 253, PUBLISHED BY NATIONAL
OCEAN SURVEY.
7. THE PROJECT DEPTH IS -15 FEET MLLW FOR THE MARINA ACCESS CHANNEL.
8. DISPOSAL SITE: WHALER ISLAND NEARSHORE SITE.
9. AERIAL IMAGE COURTESY OF ESRI, DIGITALGLOBE, GEOEYE, EARTHSTAR
GEOGRAPHICS, CNES/AIRBUS DS, USDA, USGS, AEX, GETMAPPING, AEROGRID,
IGN, IGP, SWISSTOPO, AND THE GIS USER COMMUNITY.
10. THE LOCATION OF ALL NAVIGATION AIDS ARE BASED ON INFORMATION
PROVIDED BY THE U.S. COAST GUARD. BUOY LOCATION REPRESENTS THE
POSITION OF THE SINKER ONLY.
11. SEDIMENT SAMPLING AND TESTING RESULTS AVAILABLE UPON REQUEST.
SHEET SHEET
NUMBER ID DESCRIPTION
01 G-01 COVERSHEET
02 G-02 SCHEDULE OF DRAWINGS, GENERAL NOTES AND
TYPICAL DREDGING SECTION
03 G-03 PROJECT REFERENCE SUMMARY
04 C-01 DREDGING PLAN
SCHEDULE OF DRAWINGS
TYPICAL DREDGING SECTION
NOT TO SCALE
MATERIAL TO BE DREDGED (PAID)
NO DREDGING ON SIDE SLOPES
(SEE NOTE BELOW)
EXISTING CHANNEL BOTTOM
SIDE-SLOPE PRISM
CHANNEL WIDTH VARIES
SEE PLAN
ABBREVIATIONS:
MLLW MEAN LOWER LOW WATER
NIC NOT IN CONTRACT
WA
WB
WC
WD
POINT NORTHING EASTING
WA 2,525,073.21 5,966,085.31
WB 2,524,896.90 5,965,838.54
WC 2,524,685.28 5,965,907.57
WD 2,524,831.33 5,966,273.90
WHALER ISLAND NEARSHORE SITE CONTROL POINTS
WHALER ISLAND NEARSHORE SITE
200'0' 100'
SCALE: 1" = 100'
300'
G-03
M A
R K
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S A
N
F
R A
N C
I S
S
T R
I C
T
G
O L D
G
T
E
A
V E
S A
N
F
R A
N C
I S
C O
C
A
D E
L
N
O R
U
N T
Y
C
A L I F
O R
N I A
C R
E S
C E
T
Y
H
A R
B O
R
F
Y
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
P
R O
J E
C T
C:\Users\L3ET9FS9\Desktop\E-Documents\O&M\Crescent City\FY20\Plans\CAD\ Crescent_City_O&M_2020 (G).dwg 02 Jun 2020 - 9:33am
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F
S
U N
F
S
U N
B
W
A I R
S
H
A
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
J U
N
W P
B
W P
C
X
X
D E
S C
R I P
T I O
N D
A T
E
D R
A W
I N
G
N
O
C C
SOLICITATION
P R
O J E
R
F
E R
E N
U M
M A
R Y
NOTE:
REFER TO LOCATION MAP ON SHEET G-01 FOR
PROJECT LOCATION.
DD CC
BBAA
H J
K
G
F
L M
E
N
P
Q
A
B
C
MJ
MH
MG
MF
ME
MC
MB
MA
WHALER ISLAND NEARSHORE SITE
ENTRANCE CHANNEL (NIC)
INNER HARBOR BASIN (NIC)
MARINA ACCESS CHANNEL
PROJECT SITE REFERENCE PLAN
D
MD
POINT NORTHING EASTING
WA 2,525,073.21 5,966,085.31
WB 2,524,896.90 5,965,838.54
WC 2,524,685.28 5,965,907.57
WD 2,524,831.33 5,966,273.90
WHALER ISLAND DISPOSAL SITE CONTROL POINTS
WA
WB
WC
WD
POINT NORTHING EASTING
A 2,525,702.48 5,965,454.87
B 2,526,287.40 5,965,075.79
C 2,526,428.90 5,964,896.75
D 2,526,387.82 5,964,640.82
E 2,526,417.87 5,964,510.66
F 2,526,320.06 5,964,291.44
G 2,526,002.91 5,964,100.94
H 2,525,555.38 5,964,112.28
J 2,525,550.74 5,964,312.18
K 2,525,949.44 5,964,302.32
L 2,526,163.01 5,964,430.39
M 2,526,207.95 5,964,530.87
N 2,526,142.53 5,964,811.88
P 2,525,845.23 5,965,004.97
Q 2,525,530.41 5,965,208.23
AA 2,524,016.94 5,964,016.64
BB 2,524,024.90 5,964,336.54
CC 2,523,325.11 5,964,353.96
DD 2,523,317.15 5,964,034.06
CHANNEL ALIGNMENT CONTROL POINTS
POINT NORTHING EASTING
MA 2,526,683.00 5,964,340.91
MB 2,526,813.90 5,965,466.85
MC 2,527,049.75 5,965,566.98
MD 2,527,090.90 5,965,533.54
ME 2,527,207.90 5,965,656.54
MF 2,527,102.90 5,965,741.54
MG 2,526,809.28 5,965,617.15
MH 2,526,720.90 5,965,658.54
MJ 2,526,594.90 5,965,569.54
MK 2,526,471.90 5,965,354.54
CHANNEL ALIGNMENT CONTROL POINTS
MK
400'0' 200'
SCALE: 1" = 200'
600'
LEGEND
-15.0
-16.0
0.0 TO -15.0
-15.0 TO -16.0
C-01
M A
R K
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S A
N
F
R A
N C
I S
S
T R
I C
T
G
O L
D E
N
G
A T
E
A
V E
S A
N
F
R A
N C
I S
C O
C
A
D E
L
N
O R
U
N T
Y
C
A L
I F
O R
N I A
C R
E S
C E
T
Y
H
A R
B O
R
F
Y
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
P
R O
J E
C T
C:\Users\L3ET9FS9\Desktop\E-Documents\O&M\Crescent City\FY20\Plans\CAD\ Crescent_City_O&M_2020 (C).dwg 02 Jun 2020 - 1:15pm
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F
S
U N
F
S
U N
B
W
A I R
S
H
A
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
J U
N
W
P
W
P
C
X
X
D E
S C
R I P
T I O
N D
A T
E
D R
A W
I N
G
N
O
C C
SOLICITATION
D R
E D
G I N
G
P
L A
N
200'0' 100'
SCALE: 1" = 100'
300'
PELICAN ROCK
DREDGING PLAN
MARINA ACCESS CHANNEL
TOE OF CHANNEL, TYP.
CITIZEN'S DOCK
| Crescent_City_O&M_2020 G-01 Coversheet |
| Crescent_City_O&M_2020 G-02 General |
| Crescent_City_O&M_2020 G-03 Sht-Index |
| Crescent_City_O&M_2020 C-01 |
File details come from the government source that posted it. Updated .