This document includes a Statement of Work and Request for Information for a crushing and stockpiling project. The USDA Forest Service is seeking information from potential vendors for simultaneously crushing rock at multiple pit and quarry sites in northern central Arizona to produce aggregate for use on natural surface roads. Responses are requested to help determine acquisition approach and assess small business interest and availability to undertake several such projects concurrently. Vendors should submit capability statements by May 2nd addressing experience, size, previous similar work, and ability to perform multiple projects simultaneously in the specified area. No pricing should be included in the response.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
Project CONT 030700, ENG, Crazy Cow C & S Tusayan
General Information
1.0 Scope of Work
Crazy Cow Crush and Stockpile Project: This project will include mobilization, clearing and grubbing, drilling, blasting, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of an aggregate material in accordance with the plans and specifications.
Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
2.0 Background
Crazy Cow is a new pit located on the Tusayan Ranger District. This pit has some trees, but mostly grass as a fire removed most of the vegetation a while ago. The contractor will have to scrape off the overburden, create a staging area, and utilize existing materials for barriers for the safety of the operation.
Contractor Requirements
3.0 Technical Requirements / Tasks
o Contractor shall utilize existing material at pit to create aggregate that meets the required specification per the Supplemental Specifications.
o Contractor to provide test results per specification requirements in a timely manner for concurrence from a state licensed testing facility.
4.0 Government Furnished
N/A
5.0 Deliverables / Schedule
SUBMITTAL/NOTIFICATION TIMELINES
Required Submittal/Notification
Deadline for Receipt by the Government
Applicable Specification
Work Schedule At Pre-Work Meeting 151 - Mobilization
Hazardous Spill Plan Before beginning any work 107 – Legal Relations & Responsibility to the Public
Contractor Quality Control Plan
Before beginning any work 153.02 Contractor Quality Control Plan
Equipment Mobilization Notification
1 week prior to moving equipment onto National Forest adminstred land
151 - Mobilization
Aggregate Gradation*** During aggregate production FSSS 703 Pit Development Plan 14-days prior to prework conferenc.
651- Pit and Quarry Development
Plan of Operations 14-days prior to prework conference.
FSSS 314
Blasting Plan 14-days prior to drilling and blasting operations
205 – Rock Blasting; FSSS 205
*** Items to be tested:
1. Gradation (AASHTO T 11)
2. Gradation (AASHTO T 27)
3. Liquid Limit (AASHTO T 89)
4. Plastic Limit (AASHTO T 90)
5. LA Abrasion (AASHTO T 96)
6. Sodium Sulfate Soundness (AASHTO T 104)
7. Durability (AASHTO T 210)
8. Fractured Faces (ASTM D 5821)
9. Specific Gravity and Absorption of Course Aggregate
6.0 Travel
The project is located on the Tusayan Ranger District of the Kaibab National Forest located in Coconino County, Arizona. The site is remote in nature, however existing ammenities are located in the Town of Tusayan.
7.0 Contractor’s Key Personnel
Contractor’s Representative shall be nominated at the Pre-work as a direct contact between the contractor and COR.
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| 9.0 Data Rights |
| 10.0 Section 508 – Electronic and Information Technology Standards |
| Attachment |