RFP CQ19284/RLJ
7000-Series Cab Simulators
Pre-Proposal Conference
Washington Metropolitan Area Transit Authority
Greenbelt Yard
5801 Sunnyside Ave., Bldg. H, Room 312
College Park MD 20740
September 4, 2019
1:00 p.m.
Agenda
1. Welcome / Sign-In / Housekeeping / Safety Briefing
2. Authority Disclaimer
Remarks and explanations at this pre-proposal conference shall not qualify the terms of the solicitation. All attendees are advised that unless the solicitation is amended in writing, it will remain unchanged and that if an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall be applied.
3. Introduction of Authority Personnel
Rail Management:
Lisa Woodruff, Senior Vice President, RAIL
John Doherty, Chief Mechanical Officer, RAIL
Sachit Kakkar, Chief Engineer, CENV
Tara Soesbee, Senior Project Manager, CENV
Dave Sauter, Project Manager, CENV
Lucien Barthelemy, Assistant Project Manager, CENV
Paul Bumbry, Director, OBPP/ROQT
Solicitation Contacts:
Christopher Stewart Contracting Officer, Office of Procurement and Materials, PRMT cstewart@wmata.com
202-962-2290
Robert Jones Contract Administrator, Office of Procurement and Materials, PRMT
RJones5@wmata.com
301-955-5492
Vendor Relations clm@wmata.com mailto:cstewart@wmata.com mailto:RJones5@wmata.com
RFP CQ19284, 7000-Series Cab Simulators Pre-Proposal Conference
4. General Description of the Scope of Work
This solicitation is for the design, manufacture, and delivery of train simulation systems for the 7000 series Railcar Program to improve the operators’ training process. The proposed simulator design must provide a realistic operating environment in a simulated
WMATA 7000 Series Railcar cab. Since this is a Best Value solicitation, award of a
Contract hereunder shall be to the offeror whose proposal provides the best overall value to the Authority, based upon application of the evaluation criteria set forth in herein.
5. Publicizing Business Opportunities on WMATA’s web site
A. All RFP’s and IFB’s are publicized on WMATA.COM. Click on “Business With
Metro” at the bottom of the page, in the lower right, then on the box “Procurement and Contracting” on the right side bar, click “WMATA Procurement Opportunities” and “View WMATA Procurement Opportunities”, and when the portal is launched, click on “All Solicitations (except Simplified Acquisitions)”.
B. The announcement will be updated with amendments and other information.
6. WMATA Vendor Registration System
A. From the WMATA.com web site, Click on “Business With Metro” at the bottom of the page, in the lower right, then on the box “Procurement and Contracting” on the right side bar, click “WMATA Supplier Portal” and “Supplier Portal Login” and register as a new user.
B. Please follow the instructions for New vendors or Currently Registered Vendors.
C. For any questions or help related to supplier portal, please send an email to
CLM@wmata.com.
7. General Solicitation Information
Basis of Award - “Best Value”.
Contract Type - Firm fixed price.
Proposal Due Date - 2 pm Est, October 2, 2019 at WMATA, Office of
Procurement and Materials, 600 Fifth Street, NW, Room 3C-02, Washington, DC
20001-2651
Delivery Schedule - Delivery of all items listed in E.3.4 shall occur no later than
18 months from Notice to Proceed.
Contact Person/RFP Questions – Robert Jones, Contract Administrator, e-mail rjones5@wmata.com, voice (301) 955-5492: E-mail contacts are strongly preferred.
mailto:CLM@wmata.com
Important Procurement Dates
Milestone Time Frame
Release RFP 08/21/2019
Pre-Proposal Conference 09/04/2019
Final Questions Due No later than close of business, September 11, 2019
Receipt of Proposals 10/02/2019
8. RFP Solicitation Highlights
A. Solicitation Offer and Award, Pg.4
B. Acknowledgment of Amendments, Pg.5
C. Contract Award, Pg.17
At the conclusion of the technical and price evaluation processes, the
Contracting Officer will award a Contract to the responsible offeror whose proposal conforms to the solicitation and is the most advantageous to the
Authority based upon application of the Evaluation Criteria. Such determination shall be based upon the initial proposals received where the Contracting Officer determines not to conduct discussions or shall be based upon the BAFOs, if the
Contracting Officer directs their submission.
A written award mailed or otherwise furnished to the successful offeror at any time prior to withdrawal of the proposal shall result in a binding Contract without further action by either party. Discussions conducted after receipt of an offer do not constitute the Authority’s rejection or counteroffer.
The Authority reserves the right to reject any and all proposals received and decline to enter into a Contract pursuant to this solicitation, if it deems such action is in the Authority’s best interests.
D. Pre-Award Information Determination of Responsibility, Pg.28 - 29
Pre-Award Evaluation Data form
E. Proposal Requirements, Pg.11-12
3 Volumes:
Volume I – Price Proposal
Volume II - Technical Proposal (NO COST INFORMATION)
Volume III – Contractual Proposal
Proposal Format Summary Table
Volume
Number Volume
Title Title Original Copies
Flash
Drives
Page
Limits
I Price
Proposal
Price Proposal
(Price Schedule.)
1 4 1 Exempt
II
Technical
Proposal
Technical Proposal
(No Cost/Price Information)
1 4 1 Exempt
III
Contractual
Proposal
Contractual Proposal
(Completed, singed solicitation documents to include Solicitation, Offer and Award from;
Acknowledgment of Amendments, Representations and Certifications, Pre-Award Evaluation Data, Certificate(s) of Insurance and/or
Letter from Insurer Demonstrating
Insurance Eligibility.)
1 4 1 Exempt
F. Technical Proposal Requirements: Pg.12
The technical proposal should address the stated Evaluation Criteria in such a manner as to enable the Authority to engage in a thorough evaluation of its overall technical merit. Technical proposals shall be specific, detailed and complete and shall demonstrate that the offeror has a thorough knowledge and understanding of the Contract’s requirements. Offerors shall avoid generalized statements that for example, paraphrase the specifications or attest that "standard procedures will be employed." The Authority wishes to be satisfied that the offeror maintains an understanding of the specific Contract requirements and maintains the means to fully satisfy them.
G. Basis of Award: Pg. 14-15
This is a “Best Value” competitive negotiated procurement.
The Authority will award a contract to the responsible offeror whose proposal conforms to the solicitation and is judged to be the most advantageous to the
Authority based on an overall assessment of technical merit and price in accordance with the Evaluation Criteria. In conducting this assessment:
Technical Consideration Most Important.
The Authority is more concerned with obtaining superior technical or business management features than with making an award at the lowest overall cost to the Authority. However, the Authority will not make an award at a significantly higher overall cost to achieve only slightly superior technical or management features.
H. Evaluation Criteria: Pg.14-15
The criteria below are listed in the order of importance.
1. Technical Approach
2. Corporate Experience and History of Past Performance
3. Project Management and Personnel
4. Delivery Schedule
5. Warranty Support
Each Criterion will be rated using the adjectival scoring method as follows:
Exceptional
Acceptable
Marginal
Unacceptable
Price Proposal will be rated based on:
Reasonableness
Completeness
Realism
H. Audit Requirement: Pg.31
9. Representations and Certifications
Complete sections
10. Terms and Conditions
Order of Precedence
Terms and conditions, specifications and Statement of Work shall have precedence over proposal unless the Contracting Officer issues a signed modification.
11. Special Conditions
A. Scope of Work - Attachment A - Schedule (Pg.14 -16)
B. Scope of Work - Attachment A - Additional Options (Pg.17)
C. Scope of Work - Attachment A - Payment Milestones (Pg.15-16)
Applicable payment items shall be those set forth in the Price Schedule. Milestone payments will be made upon satisfactory completion and acceptance of each line item in accordance with the milestone allocation percentages listed detailed in Scope of Work - Attachment A – E.3.5 Table 1: Payment Milestones.
Scope of Work - Attachment A, Appendix A, Contract Data Requirements List (CDRL), assigns a reference for each CDRL item. The Contractor shall review Appendix A of the Scope of Work and submit recommended due dates for approval based on the Project Schedule (E.3 Schedule).
D. RFP - Billing and Payment, 30 days of its receipt and acceptance of an invoice satisfying the requirements (Pg.49)
E. Contractor Personnel (Pg.79)
Key personnel list and assessment for removal
Vendors badge
Mandatory safety training
Waiver to be signed for background check.
F. Warranty (Pg.42)
a. Warranty period:
All workmanship, parts and materials furnished for this Contract shall be unconditionally warranted against failures or defects for a period of 2 years after the Final Acceptance by the Authority or placed them in service, whichever is earlier.;
The Contractor shall also provide an optional 2 year extension of the warranty.
b. Repair and Replacement parts - 72 hours (Pg.42)
c. Indemnity and Insurance (Pg.58 - 62)
WMATA to be named as an additional insured as stated
Worker’s Compensation
Employer’s Liability
Commercial General Liability
Business Auto Liability
Professional Liability
Technology Errors & Omissions Liability
Cyber Liability
d. Special Delivery Instructions (Pg.63)
Washington Metropolitan Area Transit Authority
Operating Area
e. Rights in Technical Data – Unlimited (Pg. 64 -67)
12. Technical Discussion
13. Questions
Please submitted in writing. Complete the Question forms that were provided to the attendees and give to Robert Jones, Contract Administrator.
Handouts
1. Agenda
2. Question Form
3. Pre-Proposal Conference Attendees: List available after meeting
IMPORTANT NOTICE
Disclaimer regarding changes to the solicitation
REMARKS AND EXPLANATIONS AT THIS PRE-PROPOSAL
CONFERENCE SHALL NOT QUALIFY THE TERMS OF THE
SOLICITATION. ALL CONFEREES ARE ADVISED THAT
UNLESS THE SOLICITATION IS AMENDED IN WRITING, IT
WILL REMAIN UNCHANGED AND THAT IF AN AMENDMENT IS
ISSUED, NORMAL PROCEDURES RELATING TO THE
ACKNOWLEDGMENT AND RECEIPT OF SOLICITATION
AMENDMENTS SHALL BE APPLIED.
Washington Metropolitan Area Transit Authority (WMATA)
7000-Series Cab Simulators
Pre-Proposal Conference
RFP No. CQ19284/RLJ
September 4, 2019
Greenbelt Yard
Contract Administrator:
Robert Jones rjones5@wmata.com
600 Fifth Street, NW, Room 3C-02
Washington, DC 20001-2651
Vendor or Supplier Information:
Name___________________________________ Company _______________________________
Email __________________________________ Title ___________________________________
Phone Office________________________________ Phone Cell ______________________________
Address ______________________________________________________________________________
Questions: Include Reference (section, page number, etc. if and when appropriate.)
Please return the question form to WMATA Procurement after the conference. Questions may also be submitted by mail or email to the designated person and address in the RFP.
mailto:rjones5@wmata.com
Questions: (continue . . .)
Please return the question form to WMATA Procurement after the conference. Questions may also be submitted by mail or email to the designated person and address in the RFP.