This Invitation for Bid (IFB) document is issued by the City of Sugar Land, Texas for the CPK2504 Eldridge Park Improvements project located at 2511 Eldridge Rd, Sugar Land, TX 77478. The project encompasses site preparation, parking lot construction, waterline installation, irrigation system installation, playground wall installation, dumpster enclosure renovation, and ADA-compliant sidewalk construction as base bid work. Two additional alternates are available: Add Alternate #1 includes tree protection, sidewalk demolition, bench reinstallation, decomposed granite installation, and resodding; Add Alternate #2 includes tree removal, light pole relocation, and construction of a 210' x 345' synthetic turf field with underground detention system. The non-mandatory pre-bid meeting is scheduled for October 22, 2026 at 9:00 AM via Microsoft Teams. Questions must be submitted by October 30, 2026 at 5:00 PM, with answers and addenda posted by November 6, 2026 at 5:00 PM. Electronic bids are due on November 12, 2026 at 11:00 AM via https://procurement.opengov.com, with hard copies not accepted. The City Council will award the contract within ninety calendar days after bid opening, with discretion to extend the award period up to 180 days. The selected bidder must enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects and maintain minimum insurance coverages as required.
The bid pricing form includes twenty base bid line items and cash allowance items, with mobilization capped at 5% of the entire base bid and owner set cash allowance items totaling $30,000. Add Alternate #1 contains seven line items including mobilization capped at 5%, and Add Alternate #2 contains eleven line items with mobilization also capped at 5%. Contractors must submit mandatory documentation and provide contractor acknowledgement confirming review of all plans, specifications, terms and conditions, and understanding of insurance requirements. No specific set-asides are identified in this solicitation. The project represents capital improvement work for a heavily-used community park requiring drainage and irrigation system repairs and upgrades.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
Solicitation Number 2026-ITB-049
CPK2504 - Eldridge Park Improvements
1. NOTICE TO BIDDERS
The City of Sugar Land seeks bids for furnishing all labor, material, and equipment, and performing all work required for the following project in the City:
CIP PROJECT NAME: CPK2504 - Eldridge Park Improvements
ITB PROJECT NUMBER: 2026-ITB-049
LOCATION OF WORK: 2511 Eldridge Rd, Sugar Land, TX 77478
Plans, specifications, and bidding documents may be obtained from https://procurement.opengov.com.
The City of Sugar Land will utilize online bidding services via https://procurement.opengov.com. Electronic
Bids are due on or before 11:00 am on Thursday, November 12, 2026. Follow submittal instructions on https://procurement.opengov.com. Hard Copies will NOT be accepted for this Bid Submission. Bids will be opened, and the Bid Results will be posted on OpenGov on Bid Date. Bids received after the opening date and time will not be considered.
A non-mandatory pre-bid meeting for all interested parties will be held 9:00 am on Thursday, October 22, 2026 at:
https://teams.microsoft.com/meet/254541182302682?p=EGl1R3VWPl4HRk1KBO Meeting ID: 254 541 182
302 682 Passcode: W6Z9fx9v.
Questions regarding this Invitation to Bid must be received on or before 5:00 pm on Friday, October 30, 2026.
Please post all questions to OpenGov Procurement.
Contact with any personnel of the City other than as authorized in this Invitation to Bid, regarding this
Invitation to Bid, may be grounds for elimination from the selection process.
The City does not assume responsibility for not receiving questions from the Bidder or the Bidders’ receipt of any answers, addenda, or amendment.
THE SELECTED BIDDER(S) WILL BE REQUIRED TO ENTER INTO THE CITY OF SUGAR
LAND STANDARD CONTRACT FOR Civil Engineering Construction PROJECTS AND PROVIDE
AND MAINTAIN THE MINIMUM INSURANCE COVERAGES REQUIRED UNDER THE
CONTRACT. THE CONTRACT IS INCLUDED AS AN ATTACHMENT TO THIS ITB.
https://procurement.opengov.com/ https://procurement.opengov.com/ https://procurement.opengov.com/ https://teams.microsoft.com/meet/254541182302682?p=EGl1R3VWPl4HRk1KBO
CITY OF SUGAR LAND Solicitation Number 2026-ITB-049
The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time. However, the
City, at its sole discretion, may extend the contract award period up to 180 days following the date specified for the opening of bids.
2. SCOPE OF WORK
2.1. SCOPE OF WORK
The work to be performed shall include all labor, materials, equipment, supervision, project management, coordination, and services necessary to complete the work in accordance with the Contract Documents, Drawings, Specifications, applicable codes, and requirements of the City of Sugar Land.
Eldridge Park Construction Documents
A. Base Bid Work includes, but is not limited to:
1. Site preparation, tree protection, selective demolition, pavement and site element removal, and furniture relocation.
2. Construction of parking lot pavement, curbs, catch basins, and parking island landscaping.
3. Installation of a new waterline and connection to the City main.
4. Installation of irrigation; grading adjustments; and hydroseeding/hydromulching of fields.
5. Installation of playground walls and ADA-compliant sidewalks.
6. Dumpster enclosure renovation.
7. Adjustment of existing utilities as needed.
B. Add Alternate #1 Work includes, but is not limited to:
A. Tree protection and sidewalk demolition.
B. Bench reinstallation and new ADA-compliant sidewalks.
C. Installation of decomposed granite around the park building and resodding of the area south of the building.
C. Add Alternate #2 Work includes, but is not limited to:
A. Tree removal, light pole relocation, and light re-aiming.
B. Construction of a 210' x 345' synthetic turf field and underground detention system.
C. Installation of related ADA-compliant sidewalks, fencing, benches, and furnishings.
2.2. SCHEDULE OF KEY EVENTS
Advertised in local paper/Notice Posted to
OpenGov Procurement:
October 14, 2026
Pre-Bid Conference (Non-Mandatory): October 22, 2026, 9:00am https://teams.microsoft.com/meet/25454118
2302682?p=EGl1R3VWPl4HRk1KBO Meeting ID: 254 541 182 302 682 Passcode: W6Z9fx9v
Questions Deadline: October 30, 2026, 5:00pm
Questions Answered and Addendum posted: November 6, 2026, 5:00pm https://government-project.s3.us-west-2.amazonaws.com/308048/284ef7a1-b4e1-476b-84b0-d25fc771e2b9_CPK2504_Eldridge_Park_Construction_Documents_10132026.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4JZKGMTVQ%2F20261014%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261014T153036Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEO7%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIG4sVlP4%2BlcbmVpclX%2FKIT9fVgzpaZZLLR0Ea84JUD2LAiBodXT29BYAE2dGc9nu%2BQXLXgw22ncnOG%2BUOUSKSPboPiqOBQi3%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIM8p%2Fadljuc9f7n6oAKuIEzr2LHImhEOr3to6jMuLob2T3%2B0NxA5ptg%2BKXOvVMeBMzmql8uO1syEbDNjN5dAHnrX3JJSsJkgNx0ntCsgvyLOfiwh0nvAW5ddGaIPUPWeahzUDRWbFkDh%2FpFXl6HM87qum%2Fsj1OgP%2FTB8M5tj9DsMlo3P1tPUvvMMlqjlTO7FK8n3rsNkEWpwg%2BMqi7mtB4DHStKxSQlZ80sNg6ii85IzLPBLmRj0BN3hvV%2FbJXTTjuCojWqbEoQ0LWL5sMiadgaWUj01pH3eJ95oN%2FI8%2BcLUg8YHOuMOO6P%2Fdv%2FPPyF0XjMOS0zZe7vfXiEd%2B0LpAK2PIKGVdogjuMeSErD8rqVsif2lHBsRBtex9x4NFQPYLseOj0q3Tpe9JreBoeMd7lXo%2FW3cuom7rW%2FLdsFISQs2gU9O1FAfzHGpjyDjQsOZs6ySyWo43a6gvnD8TItz2RU20fC26mJNWr7IX6RbJ609makKg2FNJYyX11g750yq7wnEtxjFG2KB2HUgJpHelnBZuQsYwVY6uxhqOuXGU%2FUcV1f2wf0%2B%2FixMTgQLZcta4skYt2I2AXd4MaK8oOJ8wwsy73SDCPDlPzFxXPWYSHP%2Bu9msh86Hysrv3hDZUqbxKQ%2Bz8e6ARMFlNdxWeD70oRcOoq9W1Mb4l1mYTHqSL7lndNcoCGZJZzmidEwwQ6Mgw1ez4LktB9Ta2YDrpGQe1SpodrNH6Q%2BMyGMqpWtV%2FzEMFwOy76TwR3zp%2BkWNXwc2pAe6AXhC6E%2F2aWF4nwUs6qG04sGlUAaDevJf2e3%2FRmRbywTRlZh4sijDS8KyRMR%2BB3SzCLl77WBjqaAc5V6Lf5UeDlydAQ8xiPYQQyw1L0gKgVJSwgu3BwhQGneVBC8tUOo%2BllciTq2Y9QE6O3%2BGoqdx83RCtJEuECdHQsfztmYUMJ2QKcm8tj4ZajmTt3DA5Ge7VgApWZdFkUN3C61nTjJeCPxv%2FZT6v3IV0K4%2FsmxnotSrfDjjCohpt%2FsEd9feDhkJC7eF%2FEMuxD9NefD0mWKVkVa%2BA%3D&X-Amz-Signature=025a9b6d68b9e4bded72ca0acf8c370be34e2854ff38ebed2b06c32d34222756&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22CPK2504_Eldridge_Park_Construction_Documents_10132026.pdf%22&x-id=GetObject
Bids Due: November 12, 2026, 11:00am
3. BID PROPOSAL
BID PRICING FORM
Line Item Category Description Quantity Unit of
Measure Unit Cost Total
Base Bid Items: Enter pricing for all items included in the Base Bid.
1 Mobilization Mobilization (Max 5% of the Entire Base Bid
Items and Owner Set
Cash Allowance Items)
1 LS
2 Demolition Parking Lot Curb
Removal
1,061 LF
3 Demolition Parking Lot Concrete
Pavement Removal
3,350 SY
4 Site
Improvement Silt Fence 990 LF
5 Site
Improvement Tree Protection Fence 1,840 LF
6 Site
Improvement Parking Lot New Curb 1,060 LF
7 Site
Improvement Parking Lot New
Concrete Pavement
3,350 SY
8 Site
Improvement Parking Striping 1,585 LF
9 Site
Improvement Concrete Walk 1,610 SF
10 Site
Improvement Waterline (Pipe and
Trenching)
540 LF
11 Site
Improvement Waterline Connection to City Main
1 EA
12 Site
Improvement Parking Island Planting 11,050 SF
13 Grass Fields Irrigation System 1 LS
Line Item Category Description Quantity Unit of
Measure Unit Cost Total
14 Grass Fields Grading for Grass
Fields
1 LS
15 Grass Fields Hydromulch for Grass
Fields
1 LS
16 Playground
Wall Playground Wall
Demolition
1 LS
17 Playground
Wall New Playground Wall 1 LS
18 Playground
Wall Replace Existing Bike
Rack with New Bike
Rack
1 EA
19 Dumpster
Enclosure Gate Demolition
(Wood Only)
1 LS
20 Dumpster
Enclosure New Dumpster
Enclosure Added
1 LS
TOTAL
OWNER SET CASH ALLOWANCE
(Only if authorized by City)
Line Item Category Description Quantity Unit of
Measure Unit Cost Total
Cash Allowance Items: Pricing has been entered by the Owner.
21 Cash
Allowance Cash Allowance / Site
Furnishing Allowance
1 LS $30,000.00
ADDITIONAL ALTERNATE #1
Deduct Alternate Items: Enter deduct amounts as negative values using a “-” sign (e.g., -$10,000) so that the amount is deducted from the bid total.
Unit Cost Total
Add Alternate #1 Items: Enter pricing for all items included in Add Alternate #1.
22 Building
Improvements Mobilization (Max 5% of the Entire Add Alt
#1 Total)
1 LS
23 Building
Improvements Deducting Irrigation 1 LS
24 Building
Improvements Demolition - Concrete
Sidewalk
225 SY
25 Building
Improvements Relocating Bench 2 EA
26 Building
Improvements New - Concrete Walk 1,960 SF
27 Building
Improvements New - Decomposed
Granite
32,020 SF
28 Building
Improvements New - Top Soil & Hard
Sod
3,740 SF
ADDITIONAL ALTERNATE #2
Deduct Alternate Items: Enter deduct amounts as negative values using a “-” sign (e.g., -$10,000) so that the amount is deducted from the bid total.
Line Item Category Description Quantity Unit of
Measure Unit Cost Total
Add Alternate #2 Items: Enter pricing for all items included in Add Alternate #2.
29 Synthetic
Turf Field Mobilization (Max 5% of the Entire Add Alt
#2 Total)
1 LS
30 Synthetic
Turf Field Deducting Irrigation 1 LS
31 Synthetic
Turf Field Existing Tree Removal 6 EA
Unit Cost Total
32 Synthetic
Turf Field Light Pole Relocation 2 EA
33 Synthetic
Turf Field Light Re-aiming 1 LS
34 Synthetic
Turf Field Concrete Walk 7,100 SF
35 Synthetic
Turf Field Turf, drain pipe, stone, liner, turf anchor
1 LS
36 Synthetic
Turf Field Stabilization 1 LS
37 Synthetic
Turf Field Underground Detention 1 LS
38 Synthetic
Turf Field Chain Link Fence &
Gate
1,205 LF
39 Synthetic
Turf Field Sideline Bench 2 EA
4. VENDOR QUESTIONNAIRE
1. Mandatory Documents to be Submitted*
Please download the required forms, complete, and upload.
• Required_Forms_Eldridge_Par...
*Response required
2. Contractor Acknowledgement*
Contractor has reviewed all of the plans, specifications, terms and conditions. I understand the Insurance
Requirements of these specifications and will comply in full if awarded this contract.
☐ Please confirm
*Response required https://government-project.s3.us-west-2.amazonaws.com/308048/4255aaac-83b8-47ce-bf5f-7c441b312fb4_Required_Forms_Eldridge_Park_Improvement.pdf
Attachments:
A - CPK2504 Eldridge Park Construction Documents_10132026
| 1. NOTICE TO BIDDERS |
| 2. SCOPE OF WORK |
| 2.1. SCOPE OF WORK |
| 2.2. SCHEDULE OF KEY EVENTS |
| 3. BID PROPOSAL |
| 4. VENDOR QUESTIONNAIRE |
| 1. Mandatory Documents to be Submitted* |
| 2. Contractor Acknowledgement* |