CPH_Bid_Tab.pdf

PDF 107 KB Posted

Attached to
2nd St. Streetscape Improvements State and local contract opportunity
Solicitation number
IFB 24/25-07
Issued by
Seminole County, Florida

About this file

This document is a bid tabulation analysis for the 2nd Street Streetscape Improvements Project (IFB No. 24-25-07) for the City of Sanford, Florida, involving urban infrastructure rehabilitation along approximately 1,300 linear feet of 2nd Street from Oak Avenue to Sanford Avenue. The project scope includes brick pavement rehabilitation, ADA-compliant sidewalk replacement, drainage adjustments, concrete parking areas, streetlight upgrades, and landscape implementation. Six contractors submitted bids, with bid prices ranging from $2,378,484.60 to $4,561,606.69, and Condor Construction Corp submitting the lowest bid at $2,393,484.60, which was approximately 20% below the Engineer's Estimate of $2,996,721.37.

The bid tabulation details multiple line items across roadway, landscape, and electrical plans, with unit pricing for components such as mobilization, maintenance of traffic, erosion control, concrete work, pavers, landscaping, electrical services, and lighting installations. The bid analysis reveals variations in unit pricing among contractors (Condor Construction, Gomez Construction, Gibbs & Register, and Cathcart Construction), with significant differences in individual line item costs. The procurement process included a non-mandatory pre-bid meeting on December 19, 2024, with Q&A periods extending through January 21, 2025, and final bid submissions due on January 30, 2025. The City of Sanford reserved the right to reject any or all bids and waive informalities, with the Notice of Intent to Award anticipated for February 17, 2025.

View the file

Other files for this state and local contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLAN

1 101 1 MOBILIZATION (INCLUDES BONDS & INSURANCE, PROJECT SIGNS) LS 1 $167,566.00 $167,566.00 $167,566.00 $98,534.00 $98,534.00 $98,534.00

DEMOBILIZATION, CLEANUP, RECORD DRAWINGS, PROJECT CLOSEOUT (INCLUDES MATERIAL &

WORKMANSHIP BOND)

LS 1 $10,111.00 $10,111.00 $10,111.00 $25,000.00 $25,000.00 $25,000.00

3 PRE-CONSTRUCTION VIDEO LS 1 $4,167.00 $4,167.00 $4,167.00 $10,000.00 $10,000.00 $10,000.00

4 102 1 MAINTENANCE OF TRAFFIC LS 1 $57,289.00 $57,289.00 $57,289.00 $90,000.00 $90,000.00 $90,000.00

5 104 18 EROSION CONTROL LS 1 $1,922.00 $1,922.00 $1,922.00 $29,487.50 $29,487.50 $29,487.50

6 104 18 INLET PROTECTION SYSTEM EA 22 $283.00 $6,226.00 $6,226.00 $325.00 $7,150.00 $7,150.00

7 110 1 1 CLEARING & GRUBBING AC 1.1148 $71,000.00 $79,150.80 $79,150.80 $41,862.89 $46,668.75 $46,668.75

8 110 4 10 REMOVAL OF EXISTING CONCRETE SY 3,716 $10.00 $37,160.00 $37,160.00 $23.22 $86,285.52 $86,285.52

9 120 1 REGULAR EXCAVATION CY 783 $17.80 $13,937.40 $13,937.40 $91.46 $71,613.18 $71,613.18

10 120 6 EMBANKMENT CY 40 $32.80 $1,312.00 $1,312.00 $589.05 $23,562.00 $23,562.00

11 160 4 TYPE B STABILIZATION SY 8,266 $17.70 $146,308.20 $146,308.20 $12.50 $103,325.00 $103,325.00

12 285 704 OPTIONAL BASE GROUP 04 RECYCLED CONC. AGGREGATE LBR 150 (6") SY 3,901 $28.00 $109,228.00 $109,228.00 $25.25 $98,500.25 $98,500.25

13 285 709 OPTIONAL BASE GROUP 09 RECYCLED CONC. AGGREGATE LBR 150 (10") SY 3,449 $31.00 $106,919.00 $106,919.00 $42.08 $145,133.92 $145,133.92

14 350 3 5 PLAIN CEMENT CONCRETE PAVEMENT, 8" SY 900 $82.00 $73,800.00 $73,800.00 $181.90 $163,710.00 $163,710.00

15 425 4 INLET, ADJUST EA 16 $1,556.00 $24,896.00 $24,896.00 $4,250.00 $66,206.25 $68,000.00

16 425 5 MANHOLE, ADJUST EA 19 $1,389.00 $26,391.00 $26,391.00 $1,800.00 $34,200.00 $34,200.00

17 425 6 VALVE, ADJUST EA 13 $444.00 $5,772.00 $5,772.00 $250.00 $3,250.00 $3,250.00

18 425 6 1 METER BOXES, ADJUST EA 23 $372.00 $8,556.00 $8,556.00 $250.00 $5,750.00 $5,750.00

19 520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 3,161 $28.90 $91,352.90 $91,352.90 $32.50 $102,732.50 $102,732.50

20 520 2 5 CONCRETE CURB, RIBBON LF 1,440 $27.90 $40,176.00 $40,176.00 $28.00 $40,320.00 $40,320.00

21 522 1 CONCRETE, SIDEWALK, 4" THICK SY 1,984 $48.00 $95,232.00 $95,232.00 $69.98 $138,840.32 $138,840.32

22 522 2 CONCRETE, DRIVEWAYS/RAMPS, 6" THICK SY 851 $70.00 $59,570.00 $59,570.00 $92.50 $78,717.50 $78,717.50

23 526 1 1 PAVERS, ARCHITECTURAL, ROADWAY., F&I (MARKING PAVERS) SY 92 $96.30 $8,859.60 $8,859.60 $157.60 $14,499.20 $14,499.20

24 526 1 101 PAVERS, ARCHITECTURAL, REMOVE EXISTING AND REINSTALL SY 3,357 $72.10 $242,039.70 $242,039.70 $67.20 $225,590.40 $225,590.40

25 526 1 2 PAVERS, ARCHITECTURAL, SIDEWALK SY 165 $90.60 $14,949.00 $14,949.00 $70.50 $11,632.50 $11,632.50

26 527 2 DETECTABLE WARNINGS SF 419 $43.00 $18,017.00 $18,017.00 $61.43 $25,739.17 $25,739.17

27 570 1 2 PERFORMANCE TURF, SOD SY 847 $7.60 $6,437.20 $6,437.20 $13.81 $11,697.07 $11,697.07

580 1 1 LANDSCAPE COMPLETE- SMALL PLANTS LS - $7,450.00 $7,450.00 $7,450.00

28 LEUCOPHYLLUM FRUTESCENS - TEXAS SAGE - 3 GAL., 24" HT., 16" SPRD. 48" OC EA 13 $139.00 $1,807.00 $1,807.00 $18.50 $240.50 $240.50

28a STRELITZIA REGINAE - ORANGE BIRD OF PARADISE - 663 GAL., 12" HT., 12" SPRD., 30" OC EA 172 $62.00 $10,664.00 $10,664.00 $50.00 $8,600.00 $8,600.00

28b TABERNAEMONTANA DIVARICATA - CAPE JASMINE - 7 GAL., 24" HT., 16" SPRD, 36" OC EA 9 $39.00 $351.00 $351.00 $85.00 $765.00 $765.00

28c CUPHEA HYSSOPIFOLIA - MEXICAN HEATHER - 1 GAL., 7" HT., 14" SPRD., 24" OC EA 211 $19.00 $4,009.00 $4,009.00 $8.50 $1,793.50 $1,793.50

28d GARDENIA JASMINOIDES 'RADICANS' - RADICAN'S GARDENIA - 3 GAL., 7" HT., 14" SPRD., 18" OC EA 296 $47.00 $13,912.00 $13,912.00 $18.50 $5,476.00 $5,476.00

28e IXORA 'PETITE' - ORANGE TAIWAN DWARF IXORA - 3 GAL., 12" HHT., 12" SPRD., 24" OC EA 500 $21.00 $10,500.00 $10,500.00 $18.50 $9,250.00 $9,250.00

28f TRACHELOSPERMUN ASIATICUM 'SUMMER SUNSET' - SUMMER SUNSET JASMINE - 1 GAL., 3" HT., 8" SP EA 1,021 $28.00 $28,588.00 $28,588.00 $8.50 $8,678.50 $8,678.50

580 1 2 LANDSCAPE COMPLETE- LARGE PLANTS LS - $10,000.00 $10,000.00 $10,000.00

29 ELAEOCARPUS DECIPIENS - JAPANESE BLUEBERRY - 65 GAL., 4" CAL., 7' CLEAR TRUNK, 16' HT., 4' SPR EA 11 $772.00 $8,492.00 $8,492.00 $992.00 $10,912.00 $10,912.00

30 700 1 50 SINGLE POST SIGN, RELOCATE AS 6 $133.30 $799.80 $799.80 $385.00 $4,235.00 $2,310.00

31 711 15 101 THERMOPLASTIC, STD - OP, WHITE, SOLID, 6" LF 140 $19.80 $2,772.00 $2,772.00 $25.00 $3,500.00 $3,500.00

32 ELECTRICAL DEMOLITION EA 1 $62,000.00 $62,000.00 $62,000.00 $6,537.50 $6,537.50 $6,537.50

33 CONDUIT & CONDUCTORS, F&I LS 1 $248,610.00 $248,610.00 $248,610.00 $236,172.90 $236,172.90 $236,172.90

34 EVENT RECEPTACLES, 50-AMP, F&I SY 28 $329.00 $9,212.00 $9,212.00 $1,382.57 $38,711.96 $38,711.96

35 635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 44 $2,900.00 $127,600.00 $127,600.00 $2,112.00 $92,928.00 $92,928.00

36 635 2 11 PULL & SPLICE BOX, F&I, 18" x 30" COVER SIZE EA 6 $3,144.00 $18,864.00 $18,864.00 $2,140.00 $12,840.00 $12,840.00

37 639 1 121 ELECTRICAL POWER SERVICE, F&I, U.G., METER FURNISHED BY POWER COMPANY AS 1 $60,000.00 $60,000.00 $60,000.00 $5,000.00 $5,000.00 $5,000.00

38 715 4 2 LIGHT POLE COMPLETE, F&I, DIRECT BURY, CONCRETE, 15' HT. EA 24 $6,815.00 $163,560.00 $163,560.00 $7,654.00 $183,480.00 $183,696.00

39 715 7 11 LOAD CENTER, F&I, SECONDARY VOLTAGE EA 1 $31,667.00 $31,667.00 $31,667.00 $48,283.45 $48,283.45 $48,283.45

40 715 7 21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 2 $25,000.00 $50,000.00 $50,000.00 $8,704.65 $17,409.45 $17,409.30

41 522 0 CONCRETE, REINFORCED, 16" THICK SY 166 $161.00 $26,726.00 $26,726.00 $235.62 $39,112.92 $39,112.92

42 590 70 5 IRRIGATION SYSTEM- MODIFY EXISTING SYSTEM LS 1 $30,042.00 $30,042.00 $30,042.00 $10,000.00 $10,000.00 $10,000.00

43 FESTOON LIGHTING, COMPLETE LS 1 $25,964.00 $25,964.00 $25,964.00 $48,085.00 $48,085.00 $48,085.00

SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS

2nd St. Streetscape Improvements Project Bid Tabulation Evaluation (Sheet 1 of 3)

CPH Job No. S06227 (Bid No. IFB 24-25-07)

Total Bid within Bid Form is $0.02 off from the Total Bid here and $84.62 off from CPH Calculated Total

CONDOR CONSTRUCTION

BID UNIT PRICE TOTAL BID PRICE CALCULATED COST

TOTAL - $2,393,484.60 $2,393,484.60

QUANTITY

PAY ITEM DESCRIPTION

BID UNIT PRICE CALCULATED COSTTOTAL BID PRICE

$2,567,691.31$2,567,606.71

FDOT PAY

ITEM NO.

P.I.

LINE

NO.

UNIT

ALL TERRAIN TRACTOR SERVICE

TOTAL -

2025-02-10 S06227 Bid Analysis vs EEOPC.xlsx Printed on 2/10/2025 at 2:53 PM

1 101 1 1 $239,873.32 $239,873.32 $239,873.32 $405,000.00 $405,000.00 $405,000.00 $1,032,194.00 $1,032,194.00 $1,032,194.00

2 1 $116,639.40 $116,639.40 $116,639.40 $35,000.00 $35,000.00 $35,000.00 $30,800.00 $30,800.00 $30,800.00

3 1 $5,475.00 $5,475.00 $5,475.00 $2,000.00 $2,000.00 $2,000.00 $1,920.00 $1,920.00 $1,920.00

4 102 1 1 $99,480.75 $99,480.75 $99,480.75 $65,000.00 $65,000.00 $65,000.00 $20,908.00 $20,908.00 $20,908.00

5 104 18 1 $9,581.25 $9,581.25 $9,581.25 $30,000.00 $30,000.00 $30,000.00 $6,602.00 $6,602.00 $6,602.00

6 104 18 22 $323.03 $7,106.55 $7,106.66 $250.00 $250.00 $5,500.00 $150.00 $3,300.00 $3,300.00

7 110 1 1 1.1148 $35,522.28 $39,600.24 $39,600.24 $75,000.00 $75,000.00 $83,610.00 $84,000.00 $93,643.00 $93,643.20

8 110 4 10 3,716 $38.41 $142,731.56 $142,731.56 $20.00 $20.00 $74,320.00 $55.19 $205,090.00 $205,086.04

9 120 1 783 $18.89 $14,790.87 $14,790.87 $25.00 $25.00 $19,575.00 $17.40 $13,624.00 $13,624.20

10 120 6 40 $18.89 $755.60 $755.60 $25.00 $25.00 $1,000.00 $43.18 $1,727.00 $1,727.20

11 160 4 8,266 $13.09 $108,201.94 $108,201.94 $18.00 $148,788.00 $148,788.00 $34.20 $282,697.00 $282,697.20

12 285 704 3,901 $29.07 $113,402.07 $113,402.07 $25.00 $97,525.00 $97,525.00 $40.38 $157,522.00 $157,522.38

13 285 709 3,449 $48.45 $167,104.05 $167,104.05 $40.00 $137,960.00 $137,960.00 $50.35 $173,665.00 $173,657.15

14 350 3 5 900 $230.50 $207,450.00 $207,450.00 $210.00 $189,000.00 $189,000.00 $105.61 $95,051.00 $95,049.00

15 425 4 16 $2,655.38 $42,486.08 $42,486.08 $1,300.00 $20,800.00 $20,800.00 $1,770.00 $28,320.00 $28,320.00

16 425 5 19 $2,655.38 $50,452.22 $50,452.22 $1,300.00 $24,700.00 $24,700.00 $420.00 $7,980.00 $7,980.00

17 425 6 13 $711.75 $9,252.75 $9,252.75 $250.00 $3,250.00 $3,250.00 $330.00 $4,290.00 $4,290.00

18 425 6 1 23 $711.75 $16,370.25 $16,370.25 $250.00 $5,750.00 $5,750.00 $330.00 $7,590.00 $7,590.00

19 520 1 10 3,161 $36.68 $115,945.48 $115,945.48 $40.00 $126,440.00 $126,440.00 $42.00 $132,762.00 $132,762.00

20 520 2 5 1,440 $29.57 $42,580.80 $42,580.80 $30.00 $43,200.00 $43,200.00 $28.20 $40,608.00 $40,608.00

21 522 1 1,984 $67.07 $133,066.88 $133,066.88 $75.00 $148,800.00 $148,800.00 $48.00 $95,232.00 $95,232.00

22 522 2 851 $147.28 $125,335.28 $125,335.28 $175.00 $148,925.00 $148,925.00 $57.84 $49,222.00 $49,221.84

23 526 1 1 92 $129.65 $11,927.80 $11,927.80 $135.00 $12,420.00 $12,420.00 $186.00 $17,112.00 $17,112.00

24 526 1 101 3,357 $49.82 $167,245.74 $167,245.74 $120.00 $402,840.00 $402,840.00 $84.30 $282,995.00 $282,995.10

25 526 1 2 165 $34.49 $5,690.85 $5,690.85 $130.00 $21,450.00 $21,450.00 $78.30 $12,920.00 $12,919.50

26 527 2 419 $47.09 $19,730.71 $19,730.71 $50.00 $20,950.00 $20,950.00 $67.20 $28,157.00 $28,156.80

27 570 1 2 847 $10.59 $8,969.73 $8,969.73 $12.00 $10,164.00 $10,164.00 $9.45 $8,000.00 $8,004.15

580 1 1 1 - - -

28 13 $19.76 $256.88 $256.88 $102.00 $1,326.00 $1,326.00 $18.00 $234.00 $234.00

28a 172 $37.74 $6,491.28 $6,491.28 $72.00 $12,384.00 $12,384.00 $8.00 $1,376.00 $1,376.00

28b 9 $43.22 $388.98 $388.98 $85.00 $765.00 $765.00 $45.00 $405.00 $405.00

28c 211 $25.66 $5,414.26 $5,414.26 $50.00 $10,550.00 $10,550.00 $8.00 $1,688.00 $1,688.00

28d 296 $26.92 $7,968.32 $7,968.32 $55.00 $16,280.00 $16,280.00 $18.00 $5,328.00 $5,328.00

28e 500 $21.91 $10,955.00 $10,955.00 $55.00 $27,500.00 $27,500.00 $18.00 $9,000.00 $9,000.00

28f 1,021 $6.62 $6,759.02 $6,759.02 $30.00 $30,630.00 $30,630.00 $8.00 $8,168.00 $8,168.00

580 1 2 1 - - -

29 11 $2,013.71 $22,150.81 $22,150.81 $8,500.00 $93,500.00 $93,500.00 $480.00 $5,280.00 $5,280.00

30 700 1 50 6 $328.50 $1,971.00 $1,971.00 $115.00 $690.00 $690.00 $420.00 $2,520.00 $2,520.00

31 711 15 101 140 $21.90 $3,066.00 $3,066.00 $25.00 $3,500.00 $3,500.00 $19.09 $2,672.00 $2,672.60

32 1 $27,375.00 $27,375.00 $27,375.00 $46,000.00 $46,000.00 $46,000.00 $54,561.00 $54,561.00 $54,561.00

33 1 $226,665.00 $226,665.00 $226,665.00 $355,000.00 $355,000.00 $355,000.00 $482,091.00 $482,091.00 $482,091.00

34 28 $930.75 $26,061.00 $26,061.00 $1,000.00 $28,000.00 $28,000.00 $950.92 $26,626.00 $26,625.76

35 635 2 11 44 $1,149.75 $50,589.00 $50,589.00 $1,650.00 $72,600.00 $72,600.00 $2,609.66 $114,825.00 $114,825.04

36 635 2 11 6 $1,148.25 $8,869.50 $6,889.50 $2,400.00 $14,400.00 $14,400.00 $4,716.00 $28,293.00 $28,296.00

37 639 1 121 1 $10,950.00 $10,950.00 $10,950.00 $9,000.00 $9,000.00 $9,000.00 $69,323.00 $69,323.00 $69,323.00

38 715 4 2 24 $8,103.00 $194,472.00 $194,472.00 $11,000.00 $264,000.00 $264,000.00 $5,571.86 $133,725.00 $133,724.64

39 715 7 11 1 $23,375.00 $23,375.00 $23,375.00 $78,000.00 $78,000.00 $78,000.00 $37,225.00 $37,225.00 $37,225.00

40 715 7 21 2 $14,782.50 $29,565.00 $29,565.00 $5,100.00 $10,200.00 $10,200.00 $9,700.00 $19,400.00 $19,400.00

41 522 0 166 $312.08 $51,805.28 $51,805.28 $350.00 $58,100.00 $58,100.00 $180.00 $29,880.00 $29,880.00

42 590 70 5 1 $12,264.00 $12,264.00 $12,264.00 $50,000.00 $50,000.00 $50,000.00 $27,000.00 $27,000.00 $27,000.00

43 1 $48,180.00 $48,180.00 $48,180.00 $75,000.00 $75,000.00 $75,000.00 $42,991.00 $42,991.00 $42,991.00

P.I.

LINE

NO.

FDOT PAY

ITEM NO.

SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS

2nd St. Streetscape Improvements Project

CPH Job No. S06227 (Bid No. IFB 24-25-07) Bid Tabulation Evaluation (Sheet 2 of 3)

QUANTITY

The Total Bid on the Bid Form, the Total Bid as calculated from the line item Totals on the Bid Form, and CPH's calculated Total based upon Bid Form Unit Prices, all differ.

OELRICH CONSTRUCTION

BID UNIT PRICE TOTAL BID PRICE CALCULATED COST

TOTAL - $3,432,707.00 $3,541,392.00 TOTAL - $3,936,542.00 $3,936,535.80

The Total Bid on the Bid Form and CPH's Calculated Total Bid based upon Unit Prices on the Bid Form match.

There are errors in the calculated Line Item Totals on the Bid Form.

There are numerous discrepancies between the Bid For Total Line Item Values as compared to CPH's Total Line Item calculations. It appears that the Bid Form values were rounded.

GOMEZ CONSTRUCTION

BID UNIT PRICE TOTAL BID PRICE CALCULATED COST

TOTAL - $2,796,839.50 $2,794,859.61

TOTAL BID PRICE

GIBBS & REGISTER, INC.

BID UNIT PRICE CALCULATED COST

1 101 1 1 $171,387.00 $171,387.00 $171,387.00

2 1 $41,770.00 $41,770.00 $41,770.00

3 1 $6,500.00 $6,500.00 $6,500.00

4 102 1 1 $117,655.00 $117,655.00 $117,655.00

5 104 18 1 $38,700.00 $38,700.00 $38,700.00

6 104 18 22 $400.00 $8,800.00 $8,800.00

7 110 1 1 1.1148 $141,145.00 $157,348.45 $157,348.45

8 110 4 10 3,716 $41.00 $152,356.00 $152,356.00

9 120 1 783 $35.00 $27,405.00 $27,405.00

10 120 6 40 $65.00 $2,600.00 $2,600.00

11 160 4 8,266 $39.00 $322,374.00 $322,374.00

12 285 704 3,901 $55.00 $214,555.00 $214,555.00

13 285 709 3,449 $71.00 $244,879.00 $244,879.00

14 350 3 5 900 $198.00 $178,200.00 $178,200.00

15 425 4 16 $4,400.00 $70,400.00 $70,400.00

16 425 5 19 $2,100.00 $39,900.00 $39,900.00

17 425 6 13 $1,875.00 $24,375.00 $24,375.00

18 425 6 1 23 $1,150.00 $26,450.00 $26,450.00

19 520 1 10 3,161 $58.00 $183,338.00 $183,338.00

20 520 2 5 1,440 $34.00 $48,960.00 $48,960.00

21 522 1 1,984 $95.00 $188,480.00 $188,480.00

22 522 2 851 $122.00 $103,822.00 $103,822.00

23 526 1 1 92 $190.00 $17,480.00 $17,480.00

24 526 1 101 3,357 $178.00 $597,546.00 $597,546.00

25 526 1 2 165 $190.00 $31,350.00 $31,350.00

26 527 2 419 $40.00 $16,760.00 $16,760.00

27 570 1 2 847 $9.00 $7,623.00 $7,623.00

580 1 1 1 - -

28 13 $30.00 $390.00 $390.00

28a 172 $51.00 $8,772.00 $8,772.00

28b 9 $30.00 $270.00 $270.00

28c 211 $26.00 $5,486.00 $5,486.00

28d 296 $35.00 $10,360.00 $10,360.00

28e 500 $27.00 $13,500.00 $13,500.00

28f 1,021 $16.00 $16,336.00 $16,336.00

580 1 2 1 - -

29 11 $4,070.00 $44,770.00 $44,770.00

30 700 1 50 6 $725.00 $4,350.00 $4,350.00

31 711 15 101 140 $25.00 $3,500.00 $3,500.00

32 1 $32,208.00 $32,208.00 $32,208.00

33 1 $448,178.00 $448,178.00 $448,178.00

34 28 $900.00 $25,200.00 $25,200.00

35 635 2 11 44 $2,070.00 $91,080.00 $91,080.00

36 635 2 11 6 $3,000.00 $18,000.00 $18,000.00

37 639 1 121 1 $53,000.00 $53,000.00 $53,000.00

38 715 4 2 24 $10,200.00 $244,800.00 $244,800.00

39 715 7 11 1 $26,800.00 $26,800.00 $26,800.00

40 715 7 21 2 $6,550.00 $13,100.00 $13,100.00

41 522 0 166 $250.00 $41,500.00 $41,500.00

42 590 70 5 1 $10,000.00 $10,000.00 $10,000.00

43 1 $88,120.00 $88,120.00 $88,120.00

P.I.

LINE

NO.

FDOT PAY

ITEM NO.

2nd St. Streetscape Improvements Project Bid Tabulation Evaluation (Sheet 3 of 3)

CPH Job No. S06227 (Bid No. IFB 24-25-07)

SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS

QUANTITY

TOTAL BID PRICE

$4,240,733.45 $4,240,733.45

CATHCART CONSTRUCTION

CALCULATED COSTBID UNIT PRICE

TOTAL -

Blank Page

File details come from the government source that posted it. Updated .