This document is a bid tabulation evaluation for the 2nd St. Streetscape Improvements Project in Sanford, Florida, prepared by CPH (consulting engineering firm). The project involves rehabilitation of approximately 1,300 linear feet of 2nd Street from Oak Avenue to Sanford Avenue, including brick pavement rehabilitation, ADA-compliant sidewalk replacement, drainage adjustments, concrete parking, streetlights, and new landscaping. The bid document presents detailed line-item pricing from four construction contractors: Condor Construction, Gomez Construction, Gibbs & Register, Inc., and Cathcart Construction, with total bid prices ranging from $2,393,484.60 to $4,240,733.45.
The bid tabulation includes 43 separate pay items covering roadway, landscape, and electrical work, with quantities specified for each line item such as concrete pavement, curb and gutter, sidewalks, architectural pavers, landscaping, electrical infrastructure, and lighting installations. Each contractor submitted unit prices that varied significantly across different line items, with some dramatic differences in pricing for specific components like electrical work, light pole installations, and landscape plantings. The bid analysis indicates potential computational discrepancies between total bid amounts, line item calculations, and the engineering estimate, suggesting the need for careful review of the submitted pricing details.
View the file
Other files for this state and local contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN
1 101 1 MOBILIZATION (INCLUDES BONDS & INSURANCE, PROJECT SIGNS) LS 1 $167,566.00 $167,566.00 $167,566.00 $98,534.00 $98,534.00 $98,534.00
DEMOBILIZATION, CLEANUP, RECORD DRAWINGS, PROJECT CLOSEOUT (INCLUDES MATERIAL &
WORKMANSHIP BOND)
LS 1 $10,111.00 $10,111.00 $10,111.00 $25,000.00 $25,000.00 $25,000.00
3 PRE-CONSTRUCTION VIDEO LS 1 $4,167.00 $4,167.00 $4,167.00 $10,000.00 $10,000.00 $10,000.00
4 102 1 MAINTENANCE OF TRAFFIC LS 1 $57,289.00 $57,289.00 $57,289.00 $90,000.00 $90,000.00 $90,000.00
5 104 18 EROSION CONTROL LS 1 $1,922.00 $1,922.00 $1,922.00 $29,487.50 $29,487.50 $29,487.50
6 104 18 INLET PROTECTION SYSTEM EA 22 $283.00 $6,226.00 $6,226.00 $325.00 $7,150.00 $7,150.00
7 110 1 1 CLEARING & GRUBBING AC 1.1148 $71,000.00 $79,150.80 $79,150.80 $41,862.89 $46,668.75 $46,668.75
8 110 4 10 REMOVAL OF EXISTING CONCRETE SY 3,716 $10.00 $37,160.00 $37,160.00 $23.22 $86,285.52 $86,285.52
9 120 1 REGULAR EXCAVATION CY 783 $17.80 $13,937.40 $13,937.40 $91.46 $71,613.18 $71,613.18
10 120 6 EMBANKMENT CY 40 $32.80 $1,312.00 $1,312.00 $589.05 $23,562.00 $23,562.00
11 160 4 TYPE B STABILIZATION SY 8,266 $17.70 $146,308.20 $146,308.20 $12.50 $103,325.00 $103,325.00
12 285 704 OPTIONAL BASE GROUP 04 RECYCLED CONC. AGGREGATE LBR 150 (6") SY 3,901 $28.00 $109,228.00 $109,228.00 $25.25 $98,500.25 $98,500.25
13 285 709 OPTIONAL BASE GROUP 09 RECYCLED CONC. AGGREGATE LBR 150 (10") SY 3,449 $31.00 $106,919.00 $106,919.00 $42.08 $145,133.92 $145,133.92
14 350 3 5 PLAIN CEMENT CONCRETE PAVEMENT, 8" SY 900 $82.00 $73,800.00 $73,800.00 $181.90 $163,710.00 $163,710.00
15 425 4 INLET, ADJUST EA 16 $1,556.00 $24,896.00 $24,896.00 $4,250.00 $66,206.25 $68,000.00
16 425 5 MANHOLE, ADJUST EA 19 $1,389.00 $26,391.00 $26,391.00 $1,800.00 $34,200.00 $34,200.00
17 425 6 VALVE, ADJUST EA 13 $444.00 $5,772.00 $5,772.00 $250.00 $3,250.00 $3,250.00
18 425 6 1 METER BOXES, ADJUST EA 23 $372.00 $8,556.00 $8,556.00 $250.00 $5,750.00 $5,750.00
19 520 1 10 CONCRETE CURB & GUTTER, TYPE F LF 3,161 $28.90 $91,352.90 $91,352.90 $32.50 $102,732.50 $102,732.50
20 520 2 5 CONCRETE CURB, RIBBON LF 1,440 $27.90 $40,176.00 $40,176.00 $28.00 $40,320.00 $40,320.00
21 522 1 CONCRETE, SIDEWALK, 4" THICK SY 1,984 $48.00 $95,232.00 $95,232.00 $69.98 $138,840.32 $138,840.32
22 522 2 CONCRETE, DRIVEWAYS/RAMPS, 6" THICK SY 851 $70.00 $59,570.00 $59,570.00 $92.50 $78,717.50 $78,717.50
23 526 1 1 PAVERS, ARCHITECTURAL, ROADWAY., F&I (MARKING PAVERS) SY 92 $96.30 $8,859.60 $8,859.60 $157.60 $14,499.20 $14,499.20
24 526 1 101 PAVERS, ARCHITECTURAL, REMOVE EXISTING AND REINSTALL SY 3,357 $72.10 $242,039.70 $242,039.70 $67.20 $225,590.40 $225,590.40
25 526 1 2 PAVERS, ARCHITECTURAL, SIDEWALK SY 165 $90.60 $14,949.00 $14,949.00 $70.50 $11,632.50 $11,632.50
26 527 2 DETECTABLE WARNINGS SF 419 $43.00 $18,017.00 $18,017.00 $61.43 $25,739.17 $25,739.17
27 570 1 2 PERFORMANCE TURF, SOD SY 847 $7.60 $6,437.20 $6,437.20 $13.81 $11,697.07 $11,697.07
580 1 1 LANDSCAPE COMPLETE- SMALL PLANTS LS - $7,450.00 $7,450.00 $7,450.00
28 LEUCOPHYLLUM FRUTESCENS - TEXAS SAGE - 3 GAL., 24" HT., 16" SPRD. 48" OC EA 13 $139.00 $1,807.00 $1,807.00 $18.50 $240.50 $240.50
28a STRELITZIA REGINAE - ORANGE BIRD OF PARADISE - 663 GAL., 12" HT., 12" SPRD., 30" OC EA 172 $62.00 $10,664.00 $10,664.00 $50.00 $8,600.00 $8,600.00
28b TABERNAEMONTANA DIVARICATA - CAPE JASMINE - 7 GAL., 24" HT., 16" SPRD, 36" OC EA 9 $39.00 $351.00 $351.00 $85.00 $765.00 $765.00
28c CUPHEA HYSSOPIFOLIA - MEXICAN HEATHER - 1 GAL., 7" HT., 14" SPRD., 24" OC EA 211 $19.00 $4,009.00 $4,009.00 $8.50 $1,793.50 $1,793.50
28d GARDENIA JASMINOIDES 'RADICANS' - RADICAN'S GARDENIA - 3 GAL., 7" HT., 14" SPRD., 18" OC EA 296 $47.00 $13,912.00 $13,912.00 $18.50 $5,476.00 $5,476.00
28e IXORA 'PETITE' - ORANGE TAIWAN DWARF IXORA - 3 GAL., 12" HHT., 12" SPRD., 24" OC EA 500 $21.00 $10,500.00 $10,500.00 $18.50 $9,250.00 $9,250.00
28f TRACHELOSPERMUN ASIATICUM 'SUMMER SUNSET' - SUMMER SUNSET JASMINE - 1 GAL., 3" HT., 8" SP EA 1,021 $28.00 $28,588.00 $28,588.00 $8.50 $8,678.50 $8,678.50
580 1 2 LANDSCAPE COMPLETE- LARGE PLANTS LS - $10,000.00 $10,000.00 $10,000.00
29 ELAEOCARPUS DECIPIENS - JAPANESE BLUEBERRY - 65 GAL., 4" CAL., 7' CLEAR TRUNK, 16' HT., 4' SPR EA 11 $772.00 $8,492.00 $8,492.00 $992.00 $10,912.00 $10,912.00
30 700 1 50 SINGLE POST SIGN, RELOCATE AS 6 $133.30 $799.80 $799.80 $385.00 $4,235.00 $2,310.00
31 711 15 101 THERMOPLASTIC, STD - OP, WHITE, SOLID, 6" LF 140 $19.80 $2,772.00 $2,772.00 $25.00 $3,500.00 $3,500.00
32 ELECTRICAL DEMOLITION EA 1 $62,000.00 $62,000.00 $62,000.00 $6,537.50 $6,537.50 $6,537.50
33 CONDUIT & CONDUCTORS, F&I LS 1 $248,610.00 $248,610.00 $248,610.00 $236,172.90 $236,172.90 $236,172.90
34 EVENT RECEPTACLES, 50-AMP, F&I SY 28 $329.00 $9,212.00 $9,212.00 $1,382.57 $38,711.96 $38,711.96
35 635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 44 $2,900.00 $127,600.00 $127,600.00 $2,112.00 $92,928.00 $92,928.00
36 635 2 11 PULL & SPLICE BOX, F&I, 18" x 30" COVER SIZE EA 6 $3,144.00 $18,864.00 $18,864.00 $2,140.00 $12,840.00 $12,840.00
37 639 1 121 ELECTRICAL POWER SERVICE, F&I, U.G., METER FURNISHED BY POWER COMPANY AS 1 $60,000.00 $60,000.00 $60,000.00 $5,000.00 $5,000.00 $5,000.00
38 715 4 2 LIGHT POLE COMPLETE, F&I, DIRECT BURY, CONCRETE, 15' HT. EA 24 $6,815.00 $163,560.00 $163,560.00 $7,654.00 $183,480.00 $183,696.00
39 715 7 11 LOAD CENTER, F&I, SECONDARY VOLTAGE EA 1 $31,667.00 $31,667.00 $31,667.00 $48,283.45 $48,283.45 $48,283.45
40 715 7 21 LOAD CENTER, REWORK, SECONDARY VOLTAGE EA 2 $25,000.00 $50,000.00 $50,000.00 $8,704.65 $17,409.45 $17,409.30
41 522 0 CONCRETE, REINFORCED, 16" THICK SY 166 $161.00 $26,726.00 $26,726.00 $235.62 $39,112.92 $39,112.92
42 590 70 5 IRRIGATION SYSTEM- MODIFY EXISTING SYSTEM LS 1 $30,042.00 $30,042.00 $30,042.00 $10,000.00 $10,000.00 $10,000.00
43 FESTOON LIGHTING, COMPLETE LS 1 $25,964.00 $25,964.00 $25,964.00 $48,085.00 $48,085.00 $48,085.00
SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS
2nd St. Streetscape Improvements Project Bid Tabulation Evaluation (Sheet 1 of 3)
CPH Job No. S06227 (Bid No. IFB 24-25-07)
Total Bid within Bid Form is $0.02 off from the Total Bid here and $84.62 off from CPH Calculated Total
CONDOR CONSTRUCTION
BID UNIT PRICE TOTAL BID PRICE CALCULATED COST
TOTAL - $2,393,484.60 $2,393,484.60
QUANTITY
PAY ITEM DESCRIPTION
BID UNIT PRICE CALCULATED COSTTOTAL BID PRICE
$2,567,691.31$2,567,606.71
FDOT PAY
ITEM NO.
P.I.
LINE
NO.
UNIT
ALL TERRAIN TRACTOR SERVICE
TOTAL -
2025-02-10 S06227 Bid Analysis vs EEOPC.xlsx Printed on 2/10/2025 at 2:53 PM
1 101 1 1 $239,873.32 $239,873.32 $239,873.32 $405,000.00 $405,000.00 $405,000.00 $1,032,194.00 $1,032,194.00 $1,032,194.00
2 1 $116,639.40 $116,639.40 $116,639.40 $35,000.00 $35,000.00 $35,000.00 $30,800.00 $30,800.00 $30,800.00
3 1 $5,475.00 $5,475.00 $5,475.00 $2,000.00 $2,000.00 $2,000.00 $1,920.00 $1,920.00 $1,920.00
4 102 1 1 $99,480.75 $99,480.75 $99,480.75 $65,000.00 $65,000.00 $65,000.00 $20,908.00 $20,908.00 $20,908.00
5 104 18 1 $9,581.25 $9,581.25 $9,581.25 $30,000.00 $30,000.00 $30,000.00 $6,602.00 $6,602.00 $6,602.00
6 104 18 22 $323.03 $7,106.55 $7,106.66 $250.00 $250.00 $5,500.00 $150.00 $3,300.00 $3,300.00
7 110 1 1 1.1148 $35,522.28 $39,600.24 $39,600.24 $75,000.00 $75,000.00 $83,610.00 $84,000.00 $93,643.00 $93,643.20
8 110 4 10 3,716 $38.41 $142,731.56 $142,731.56 $20.00 $20.00 $74,320.00 $55.19 $205,090.00 $205,086.04
9 120 1 783 $18.89 $14,790.87 $14,790.87 $25.00 $25.00 $19,575.00 $17.40 $13,624.00 $13,624.20
10 120 6 40 $18.89 $755.60 $755.60 $25.00 $25.00 $1,000.00 $43.18 $1,727.00 $1,727.20
11 160 4 8,266 $13.09 $108,201.94 $108,201.94 $18.00 $148,788.00 $148,788.00 $34.20 $282,697.00 $282,697.20
12 285 704 3,901 $29.07 $113,402.07 $113,402.07 $25.00 $97,525.00 $97,525.00 $40.38 $157,522.00 $157,522.38
13 285 709 3,449 $48.45 $167,104.05 $167,104.05 $40.00 $137,960.00 $137,960.00 $50.35 $173,665.00 $173,657.15
14 350 3 5 900 $230.50 $207,450.00 $207,450.00 $210.00 $189,000.00 $189,000.00 $105.61 $95,051.00 $95,049.00
15 425 4 16 $2,655.38 $42,486.08 $42,486.08 $1,300.00 $20,800.00 $20,800.00 $1,770.00 $28,320.00 $28,320.00
16 425 5 19 $2,655.38 $50,452.22 $50,452.22 $1,300.00 $24,700.00 $24,700.00 $420.00 $7,980.00 $7,980.00
17 425 6 13 $711.75 $9,252.75 $9,252.75 $250.00 $3,250.00 $3,250.00 $330.00 $4,290.00 $4,290.00
18 425 6 1 23 $711.75 $16,370.25 $16,370.25 $250.00 $5,750.00 $5,750.00 $330.00 $7,590.00 $7,590.00
19 520 1 10 3,161 $36.68 $115,945.48 $115,945.48 $40.00 $126,440.00 $126,440.00 $42.00 $132,762.00 $132,762.00
20 520 2 5 1,440 $29.57 $42,580.80 $42,580.80 $30.00 $43,200.00 $43,200.00 $28.20 $40,608.00 $40,608.00
21 522 1 1,984 $67.07 $133,066.88 $133,066.88 $75.00 $148,800.00 $148,800.00 $48.00 $95,232.00 $95,232.00
22 522 2 851 $147.28 $125,335.28 $125,335.28 $175.00 $148,925.00 $148,925.00 $57.84 $49,222.00 $49,221.84
23 526 1 1 92 $129.65 $11,927.80 $11,927.80 $135.00 $12,420.00 $12,420.00 $186.00 $17,112.00 $17,112.00
24 526 1 101 3,357 $49.82 $167,245.74 $167,245.74 $120.00 $402,840.00 $402,840.00 $84.30 $282,995.00 $282,995.10
25 526 1 2 165 $34.49 $5,690.85 $5,690.85 $130.00 $21,450.00 $21,450.00 $78.30 $12,920.00 $12,919.50
26 527 2 419 $47.09 $19,730.71 $19,730.71 $50.00 $20,950.00 $20,950.00 $67.20 $28,157.00 $28,156.80
27 570 1 2 847 $10.59 $8,969.73 $8,969.73 $12.00 $10,164.00 $10,164.00 $9.45 $8,000.00 $8,004.15
580 1 1 1 - - -
28 13 $19.76 $256.88 $256.88 $102.00 $1,326.00 $1,326.00 $18.00 $234.00 $234.00
28a 172 $37.74 $6,491.28 $6,491.28 $72.00 $12,384.00 $12,384.00 $8.00 $1,376.00 $1,376.00
28b 9 $43.22 $388.98 $388.98 $85.00 $765.00 $765.00 $45.00 $405.00 $405.00
28c 211 $25.66 $5,414.26 $5,414.26 $50.00 $10,550.00 $10,550.00 $8.00 $1,688.00 $1,688.00
28d 296 $26.92 $7,968.32 $7,968.32 $55.00 $16,280.00 $16,280.00 $18.00 $5,328.00 $5,328.00
28e 500 $21.91 $10,955.00 $10,955.00 $55.00 $27,500.00 $27,500.00 $18.00 $9,000.00 $9,000.00
28f 1,021 $6.62 $6,759.02 $6,759.02 $30.00 $30,630.00 $30,630.00 $8.00 $8,168.00 $8,168.00
580 1 2 1 - - -
29 11 $2,013.71 $22,150.81 $22,150.81 $8,500.00 $93,500.00 $93,500.00 $480.00 $5,280.00 $5,280.00
30 700 1 50 6 $328.50 $1,971.00 $1,971.00 $115.00 $690.00 $690.00 $420.00 $2,520.00 $2,520.00
31 711 15 101 140 $21.90 $3,066.00 $3,066.00 $25.00 $3,500.00 $3,500.00 $19.09 $2,672.00 $2,672.60
32 1 $27,375.00 $27,375.00 $27,375.00 $46,000.00 $46,000.00 $46,000.00 $54,561.00 $54,561.00 $54,561.00
33 1 $226,665.00 $226,665.00 $226,665.00 $355,000.00 $355,000.00 $355,000.00 $482,091.00 $482,091.00 $482,091.00
34 28 $930.75 $26,061.00 $26,061.00 $1,000.00 $28,000.00 $28,000.00 $950.92 $26,626.00 $26,625.76
35 635 2 11 44 $1,149.75 $50,589.00 $50,589.00 $1,650.00 $72,600.00 $72,600.00 $2,609.66 $114,825.00 $114,825.04
36 635 2 11 6 $1,148.25 $8,869.50 $6,889.50 $2,400.00 $14,400.00 $14,400.00 $4,716.00 $28,293.00 $28,296.00
37 639 1 121 1 $10,950.00 $10,950.00 $10,950.00 $9,000.00 $9,000.00 $9,000.00 $69,323.00 $69,323.00 $69,323.00
38 715 4 2 24 $8,103.00 $194,472.00 $194,472.00 $11,000.00 $264,000.00 $264,000.00 $5,571.86 $133,725.00 $133,724.64
39 715 7 11 1 $23,375.00 $23,375.00 $23,375.00 $78,000.00 $78,000.00 $78,000.00 $37,225.00 $37,225.00 $37,225.00
40 715 7 21 2 $14,782.50 $29,565.00 $29,565.00 $5,100.00 $10,200.00 $10,200.00 $9,700.00 $19,400.00 $19,400.00
41 522 0 166 $312.08 $51,805.28 $51,805.28 $350.00 $58,100.00 $58,100.00 $180.00 $29,880.00 $29,880.00
42 590 70 5 1 $12,264.00 $12,264.00 $12,264.00 $50,000.00 $50,000.00 $50,000.00 $27,000.00 $27,000.00 $27,000.00
43 1 $48,180.00 $48,180.00 $48,180.00 $75,000.00 $75,000.00 $75,000.00 $42,991.00 $42,991.00 $42,991.00
P.I.
LINE
NO.
FDOT PAY
ITEM NO.
SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS
2nd St. Streetscape Improvements Project
CPH Job No. S06227 (Bid No. IFB 24-25-07) Bid Tabulation Evaluation (Sheet 2 of 3)
QUANTITY
The Total Bid on the Bid Form, the Total Bid as calculated from the line item Totals on the Bid Form, and CPH's calculated Total based upon Bid Form Unit Prices, all differ.
OELRICH CONSTRUCTION
BID UNIT PRICE TOTAL BID PRICE CALCULATED COST
TOTAL - $3,432,707.00 $3,541,392.00 TOTAL - $3,936,542.00 $3,936,535.80
The Total Bid on the Bid Form and CPH's Calculated Total Bid based upon Unit Prices on the Bid Form match.
There are errors in the calculated Line Item Totals on the Bid Form.
There are numerous discrepancies between the Bid For Total Line Item Values as compared to CPH's Total Line Item calculations. It appears that the Bid Form values were rounded.
GOMEZ CONSTRUCTION
BID UNIT PRICE TOTAL BID PRICE CALCULATED COST
TOTAL - $2,796,839.50 $2,794,859.61
TOTAL BID PRICE
GIBBS & REGISTER, INC.
BID UNIT PRICE CALCULATED COST
1 101 1 1 $171,387.00 $171,387.00 $171,387.00
2 1 $41,770.00 $41,770.00 $41,770.00
3 1 $6,500.00 $6,500.00 $6,500.00
4 102 1 1 $117,655.00 $117,655.00 $117,655.00
5 104 18 1 $38,700.00 $38,700.00 $38,700.00
6 104 18 22 $400.00 $8,800.00 $8,800.00
7 110 1 1 1.1148 $141,145.00 $157,348.45 $157,348.45
8 110 4 10 3,716 $41.00 $152,356.00 $152,356.00
9 120 1 783 $35.00 $27,405.00 $27,405.00
10 120 6 40 $65.00 $2,600.00 $2,600.00
11 160 4 8,266 $39.00 $322,374.00 $322,374.00
12 285 704 3,901 $55.00 $214,555.00 $214,555.00
13 285 709 3,449 $71.00 $244,879.00 $244,879.00
14 350 3 5 900 $198.00 $178,200.00 $178,200.00
15 425 4 16 $4,400.00 $70,400.00 $70,400.00
16 425 5 19 $2,100.00 $39,900.00 $39,900.00
17 425 6 13 $1,875.00 $24,375.00 $24,375.00
18 425 6 1 23 $1,150.00 $26,450.00 $26,450.00
19 520 1 10 3,161 $58.00 $183,338.00 $183,338.00
20 520 2 5 1,440 $34.00 $48,960.00 $48,960.00
21 522 1 1,984 $95.00 $188,480.00 $188,480.00
22 522 2 851 $122.00 $103,822.00 $103,822.00
23 526 1 1 92 $190.00 $17,480.00 $17,480.00
24 526 1 101 3,357 $178.00 $597,546.00 $597,546.00
25 526 1 2 165 $190.00 $31,350.00 $31,350.00
26 527 2 419 $40.00 $16,760.00 $16,760.00
27 570 1 2 847 $9.00 $7,623.00 $7,623.00
580 1 1 1 - -
28 13 $30.00 $390.00 $390.00
28a 172 $51.00 $8,772.00 $8,772.00
28b 9 $30.00 $270.00 $270.00
28c 211 $26.00 $5,486.00 $5,486.00
28d 296 $35.00 $10,360.00 $10,360.00
28e 500 $27.00 $13,500.00 $13,500.00
28f 1,021 $16.00 $16,336.00 $16,336.00
580 1 2 1 - -
29 11 $4,070.00 $44,770.00 $44,770.00
30 700 1 50 6 $725.00 $4,350.00 $4,350.00
31 711 15 101 140 $25.00 $3,500.00 $3,500.00
32 1 $32,208.00 $32,208.00 $32,208.00
33 1 $448,178.00 $448,178.00 $448,178.00
34 28 $900.00 $25,200.00 $25,200.00
35 635 2 11 44 $2,070.00 $91,080.00 $91,080.00
36 635 2 11 6 $3,000.00 $18,000.00 $18,000.00
37 639 1 121 1 $53,000.00 $53,000.00 $53,000.00
38 715 4 2 24 $10,200.00 $244,800.00 $244,800.00
39 715 7 11 1 $26,800.00 $26,800.00 $26,800.00
40 715 7 21 2 $6,550.00 $13,100.00 $13,100.00
41 522 0 166 $250.00 $41,500.00 $41,500.00
42 590 70 5 1 $10,000.00 $10,000.00 $10,000.00
43 1 $88,120.00 $88,120.00 $88,120.00
P.I.
LINE
NO.
FDOT PAY
ITEM NO.
2nd St. Streetscape Improvements Project Bid Tabulation Evaluation (Sheet 3 of 3)
CPH Job No. S06227 (Bid No. IFB 24-25-07)
SUMMARY OF PAY ITEMS - ROADWAY, LANDSCAPE & ELECTRICAL PLANS
QUANTITY
TOTAL BID PRICE
$4,240,733.45 $4,240,733.45
CATHCART CONSTRUCTION
CALCULATED COSTBID UNIT PRICE
TOTAL -