This Space Allocation and Finish Schedule document is prepared by the Committee for Public Counsel Services (CPC) for a Massachusetts Department of Capital Asset Management and Maintenance (DCAMM) project in Pittsfield. The document outlines the space requirements for a new office facility totaling approximately 5,600 usable square feet, with DCAMM considering flexible options between 5,000 and 6,000 square feet for a 10-year lease term. The space allocation includes staff areas (3,455 square feet) to accommodate 28 personnel consisting of 2 senior managers, 19 managers, 3 administrative assistants, and 4 interns; support areas (763 square feet) including copy/mail, server room, staff support area, wellness room, records room, and coat closet; and entry and meeting areas (1,428 square feet) comprising a conference room, two interview rooms, waiting/seating area, and reception area. The document provides detailed specifications for each space, including partition types, flooring materials, and equipment requirements such as carpet, resilient tile flooring, static dissipative tile, and combination voice/data/power outlets.

The document specifies detailed finish specifications for all areas, with most offices featuring full-height partitions and carpeting, while support and open areas utilize various flooring treatments appropriate to their functions. Entry and meeting areas incorporate features such as sidelights, chair rails, wood blocking for mounted televisions, and security elements including card access and remote door release mechanisms. No pricing information, set-asides, or incumbent details are provided in this space planning document, which serves as a technical specification guide for prospective landlords responding to the RFP.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMITTEE FOR PUBLIC COUNSEL SERVICES (CPC)

Pittsfield

Project Number 202609900

SECTION B-3

SPACE ALLOCATION AND FINISH SCHEDULE

A TOTAL OF APPROXIMATELY 5,600 USABLE SQUARE FEET

November 2026

B-3. SPACE ALLOCATION AND FINISH SCHEDULE

November 2026

Location: Pittsfield

SUMMARY OF SPACE ALLOCATION

Staff Count Seat Count Usable Area

Staff Areas 28 28 3,455

Support Areas - - 763

Entry & Meeting Areas 1 1 1,428

TOTAL: 29 29 5,646

RFP for 5,600

Committee for Public Counsel Services (CPC)

DCAMM Project Number: 202609900

TOTAL PARTI- FLOOR NOTATIONS ON

SEATS SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

STAFF AREAS

Senior Manager 2 2 120 240 240 Full CPT Lock, Sidelight Manager 19 19 100 1,900 1,900 Full CPT Lock, Sidelight Administrative Assistant 3 3 48 144 144 UA-Wkstn CPT Intern 4 4 36 144 144 UA-Wkstn CPT Subtotal Staff Areas 28 28 2,428 2,428

EQUIPMENT IN OPEN AREAS

Shredding Bins 10 4 40 40 Open CPT Subtotal Equipment in Open Areas 40 40 Subtotal 28 2,428 40 2,468 List of Abbreviations Circulation 40% 987 SF Usable Square Feet

TOTAL USABLE AREA 3,455 Full Office or room with full height partitions and door UA-Wkstn Open area with user agency-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring SDT Static Dissipative Tile V/D/P Combination Voice, Data, Power Outlet

202609900

Staff Areas

TYPE OF ROOM OR AREA STAFF

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Committee for Public Counsel Services (CPC) Pittsfield

PERSONNEL SPACE SUPPORT SPACE

DCAMM PROJECT NO:

STAFF SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

SUPPORT AREAS

Copy/Mail 1 50 50 50 Open CPT Alcove configuration, no door, lower and upper cabinets with counter 1 100 100 100 Full SDT Card Access by tenant, door prep by landlord, 24/7 cooling, vision panel Staff Support Area 1 175 175 175 Open RTF Counter, sink, cabinets, paper towel dispenser Wellness Room 1 100 100 100 Full CPT Counter, sink, base cabinet, in-use indicator lock Records Room 1 100 100 100 Full RTF Lock, vision panel, perimeter shelving Coat Closet 1 20 20 20 Full CPT Subtotal Support Areas 545 545 Subtotal 545 545 List of Abbreviations Circulation 40% 218 SF Usable Square Feet

TOTAL USABLE AREA 763 Full Office or room with full height partitions and door UA-WkstnOpen area with user agency-installed systems furnitur Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring SDT Static Dissipative Tile V/D/P Combination Voice, Data, Power Outlet

202609900

Support Areas

TYPE OF ROOM OR AREA

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Committee for Public Counsel Services (CPC) Pittsfield

PERSONNEL SPACE SUPPORT SPACE

DCAMM PROJECT NO:

Main Distribution Frame (MDF)

STAFF SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

MEETING AREAS

Conference Room 1 500 500 500 Full CPT Sidelight, chair rail, floor core V/D/P, wood blocking and V/D/P outlet for UA provided TV

Interview Room 2 100 200 200 Full CPT Sidelight, chair Rail, 2nd door into secure space in one room

Subtotal Meeting Areas 700 700

ENTRY AREAS

Waiting/Seating 1 160 160 160 Open CPT Chair Rail Reception 1 80 80 1 80 80 160 Open CPT Reception desk assembly by Landlord (see Exhibit

2), fixed transaction window, remote door release, card access by Tenant, door prep by landlord

Subtotal Entry Areas 80 240 320 Subtotal 1 940 1,020 List of Abbreviations Circulation 40% 408 SF Usable Square Feet

TOTAL USABLE AREA 1,428 Full Office or room with full height partitions and door

UA-Wkstn Open area with user agency-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring SDT Static Dissipative Tile V/D/P Combination Voice, Data, Power Outlet

202609900

TYPE OF ROOM OR AREA

Entry & Meeting Areas

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Committee for Public Counsel Services (CPC) Pittsfield

PERSONNEL SPACE SUPPORT SPACE

DCAMM PROJECT NO:

Cover
Summary
Staff
Support Areas
Entry & Meeting