county of stephenson REQUEST FOR PROPOSAL(CH 6 CH 5)_Cedarville Rd and Galena Rd roundabout.pdf
PDF 193 KB Posted
- Attached to
- Phase I & Phase II Engineering Services
- Solicitation number
- 24-00190-05-FP
- Issued by
- St. Clair County, Illinois
About this file
This Request for Proposal is issued by the Stephenson County Highway Department in Illinois for Phase I & Phase II engineering services with an option for Phase III engineering services for the planning and design of a roundabout at the intersection of County Highway 6 (Galena Road) and County Highway 5 (Cedarville Road). The project encompasses multiple deliverables including data collection, environmental studies coordination, local coordination, preparation of IDOT forms and reports, pavement design options, safety improvements, intersection evaluation, a Project Development Report, contract plans and specifications, cost and time estimates, right-of-way acquisition, and land appraisal and negotiation services. The estimated construction cost is $3,500,000 utilizing Federal Rural and Tribal Assistance grant funds. Phase I and Phase II engineering services are expected to be completed for a spring 2028 state letting. Proposals must be submitted in PDF format to stcohwy@stephensoncountyil.gov or delivered to the Stephenson County Highway Department office at 295 W. Lamm Road, Freeport, Illinois 61032 by 3:00 PM on November 9, 2026. Short-listed firms may be invited to interviews scheduled for the week of November 30, 2026, with a maximum 20-minute interview window and a 15-minute presentation requirement. The selected consultant will be presented to the Stephenson County Public Works Committee on December 10, 2026, and the Stephenson County Board on December 17, 2026, for final approval.
The proposal evaluation will be based on four weighted criteria: Technical Approach (30%), Firm Experience (25%), Staff Capabilities (20%), and Specialized Expertise (25%). Proposals are limited to 10 pages and must include a cover letter, organizational chart with key staff, resumes limited to two pages total, supporting staff listing, proposed sub-consultants, relevant completed projects demonstrating similar scope and magnitude, and a project approach section discussing project understanding, data collection methodology, and anticipated challenges. The selection process complies with Stephenson County's Qualification Based Selection procedure adopted March 16, 2023. If the County cannot execute a timely contract with the first-choice firm, negotiations will proceed sequentially with second and third-choice firms. The project is funded entirely through Federal Rural and Tribal Assistance grant funds. Contact information for questions is provided through Dale Rasmussen (drasmussen@stephensoncountyil.gov) or Brian Peight (bpeight@stephensoncountyil.gov) at the Highway Department office, 815-235-7497.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R:\SECTIONS\24\24-00190-05-FP Cedarville Rd and Galena Rd Roundabout\REQUEST FOR PROPOSAL(CH 6 CH 5)_Cedarville Rd and Galena Rd roundabout.docx
REQUEST FOR PROPOSAL
PHASE I & PHASE II ENGINEERING SERVICES
W/ OPTION FOR PHASE III
STEPHENSON COUNTY
CH 6 CEDARVILLE RD & CH 5 GALENA RD
ROUNDABOUT
SECTION NUMBER 24-00190-05-FP
Proposals are due to the Stephenson County Highway Department office, 295 W. Lamm Rd, Freeport, IL 61032 or stcohwy@stephensoncountyil.gov by 3:00 PM, November 9, 2026.
Proposals received after this time will not be accepted.
I. PROJECT DESCRIPTION
The Stephenson County Highway Department needs Phase I & Phase II engineering services and an option for Phase III engineering services for the planning and design for a roundabout at the intersection of County Highway 6 (Galena Rd) and County Highway 5 (Cedarville Rd). Phase I and Phase II will be utilizing Federal Rural and Tribal Assistance (RTA) grant funds. The estimated construction cost is $3,500,000 utilizing federal funds. Phase I & Phase II engineering are expected to be completed for a spring 2028 state letting. All Specific tasks include, but are not limited to:
1. Data collection
2. Environmental studies coordination
3. Local Coordination
4. Prepare IDOT forms and reports
5. Pavement Design Options
6. Safety Improvements
7. Intersection Evaluation at CH 6 and CH 5
8. Preparation of a Project Development Report (PDR)
9. Preparation of contract plans and project special provisions/specifications
10. Preparation of estimate of cost and time
11. Right of Way acquisition and/or Construction Easements including Highway Plats and
Legals, if necessary
12. Appraisal and negotiation of land acquisition consistent with Title II and III of the
Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970.
Phase III, Construction Inspection, shall be included as an option.
II. PROPOSAL REQUIREMENTS
R:\SECTIONS\24\24-00190-05-FP Cedarville Rd and Galena Rd Roundabout\REQUEST FOR PROPOSAL(CH 6 CH 5)_Cedarville Rd and
Proposals shall be submitted as a Portable Document Format (pdf) no later than 3:00 PM on
Monday, November 9, 2026, to stcohwy@stephensoncountyil.gov or Stephenson County
Highway Department office, 295 W. Lamm Rd, Freeport, IL 61032 The required proposal format is listed below. Please do your best to comply with as much of this information as possible.
The completed Proposal shall be limited to 10 pages and include the following items, presented in the following order:
• Cover letter on the firm’s letterhead transmitting the Proposal to the
County. The cover letter shall describe the composition and proposal contents. In addition, the cover letter shall include any/all contact information, should questions arise from the submitted Proposal.
• Section 1: Listing of key staff, presented in a company organizational chart format, starting with individuals of a higher ranking or classification near the top of the chart that are proposed to provide the majority of services.
• Section 2: Key staff resumes. Resumes shall be limited to two pages total.
• Section 3: List of other company support staff that are not anticipated to perform major items of work but that may be available should their assistance be required.
• Section 4: Proposed sub-consultants.
• Section 5: Ongoing or completed projects of similar scope and magnitude that demonstrates the firm has experience in performing work requested by the County for the specific project.
• Section 6: This section also known as the Project Approach or Project
Understanding shall be devoted to discussion of the County’s project for which services are needed. The following elements shall be included in this section:
✓ Project Name
✓ Project Location
✓ Type of work required (e.g., Phase I, II & III Engineering)
✓ The firm’s proposed preliminary project approach to obtaining necessary data, evaluating the existing conditions, identifying problems/deficiencies, and proposed methods to correct and resolve identified problems and deficiencies.
✓ A list of anticipated challenges or what is anticipated to be the biggest challenge in completing the requested work.
III. SELECTION CRITERIA AND WEIGHTING
• Technical Approach 30%
• Firm Experience 25%
• Staff Capabilities 20%
R:\SECTIONS\24\24-00190-05-FP Cedarville Rd and Galena Rd Roundabout\REQUEST FOR PROPOSAL(CH 6 CH 5)_Cedarville Rd and
• Specialized Expertise 25%
IV. SELECTION PROCESS
The selection of the Consultant will be made in compliance with the County’s most current “Stephenson County Highway Department Qualification Based Selection (QBS) Process for Procurement of Professional Services as Adopted by Stephenson County March 16, 2023.
The current QBS Procedure is posted on the County’s website, www.stephensoncountyil.gov
The County may conduct interviews with short-listed firms in compliance with its current
QBS Procedure for professional services anticipated for this project. If necessary, interviews with the short-listed firms will be scheduled for the week of November 30, 2026.
The interview will be a maximum of 20 minutes. The Consultant should be prepared to make a presentation (a maximum of 15 minutes in length) outlining their qualifications and experience with projects of similar scope and magnitude. The Consultant should also demonstrate their understanding of the project and engineering services required. The remainder of the scheduled time will be a question-and-answer session. Attendance at the presentation will be limited to two representatives from the Consultant and attendance of the Project Manager is mandatory.
The consultant chosen by the Selection Committee will be the presumptive Consultant for the final negotiations. The County will then conduct negotiations with the first-choice firm. If the
County is unable to execute a timely contract with the first choice, the County will then pursue negotiations with the second-choice firm who has met the basic qualifications, then the third, etc., until an acceptable contract is executed.
The negotiated contract will be presented to the Stephenson County Public Works Committee on
December 10, 2026, and the Stephenson County Board at their December 17, 2026, meeting for their approval.
IV. CONTACT INFORMATION
Any questions regarding the project may be directed to Dale Rasmussen at drasmussen@stephensoncountyil.gov or Brian Peight at bpeight@stephensoncountyil.gov
The Highway Department office number is 815 235-7497.