This is a construction plan document prepared by Kimley-Horn & Associates for the Bulloch County Board of Commissioners in Georgia for the FY25-CP-E17 Country Club Road Culvert Replacement Project. The project involves demolishing an existing triple 42-inch reinforced concrete pipe (RCP) culvert and constructing a new double 5-foot by 5-foot reinforced concrete box culvert system with associated roadway improvements along Country Club Road in Bulloch County, located approximately 1.5 miles north of the intersection of Country Club Road and Cypress Lake Road. The project spans 0.125 miles of rural local roadway with a design speed of 45 mph and an average daily traffic count of 1,020 vehicles. Construction work includes full-depth asphalt pavement replacement at STA 104+00 to 105+00, overlay and leveling from STA 102+40 to 107+00, fill slope repair, shoulder construction and repair, subgrade preparation, graded aggregate base installation, guardrail installation, signage and striping, and driveway reconstruction. The project must achieve substantial completion within 120 consecutive calendar days and final acceptance within 150 consecutive calendar days following issuance of the Notice to Proceed.
The plans incorporate erosion, sedimentation, and pollution control measures with designated BMPs including silt fencing with J-hooks, compost filter sock check dams, riprap outlet protection, temporary and permanent grassing, and storm drain outlet protection. The project includes construction of special drainage ditches and stream diversion provisions, with the new box culvert featuring 6-inch baffles and designed to drain into Wateringhole Branch Tributary. The contractor is required to obtain utility coordination through the One-Call Center and manage existing utility facilities including fiber optic lines and electrical service operated by Bulloch Solutions and Excelsior EMC. All work shall comply with the 2021 Georgia Department of Transportation Standard Specifications and 2026 Construction Standards and Details Book. Plans were completed on February 11, 2026, with project contact Ron Nelson at the Bulloch County Board of Commissioners (912-531-5708) and engineer Drew Talley at Kimley-Horn & Associates (912-328-4805).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION
PROJECT
LOCATION SKETCH
TRAFFIC D.H.V. (2024): 635
TRAFFIC A.D.T. (2024): 1020
DESIGN DATA:
24 HR.TRUCKS %: 9%
SPEED DESIGN: 45 MPH - COUNTRY CLUB ROAD
RURAL LOCAL ROADWAY (COUNTRY CLUB ROAD)
FUNCTIONAL CLASS:
IS 100% IN CONG. DIST. NO. 012.
THIS PROJECT IS 100% IN BULLOCH COUNTY AND
PROJECT DESIGNATION: EXEMPT
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 EAST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
BOARD OF COMMISSIONERS
bulloch county
PLAN AND PROFILE OF PROPOSED
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
FEDERAL ROUTE No.: N/A
STATE ROUTE No.: N/A
P.I. No.: N/A
MILES
0.125
N/A
0.125
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
N/A
0.125
LENGTH OF PROJECT
COUNTY No.31
PLANS PREPARED BY:
UNDER THE SUPERVISION OF:
PLANS COMPLETED 02/11/2026
REVISIONS
PROJECT CONTACTS
CONTACT: DREW TALLEY, P.E.
PHONE: (912) 328-4805
SAVANNAH, GA 31401
33 BULL STREET, SUITE 505
ENGINEER: KIMLEY-HORN & ASSOCIATES
CONTACT: RON NELSON
PHONE: (912) 531-5708
STATESBORO, GEORGIA 30458
115 NORTH MAIN STREET
BULLOCH COUNTY BOARD OF COMMISSIONERSOWNER:
SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE GEORGIA STANDARD SPECIFICATIONS.
BINDING IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO
HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND ARE NOT
UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS.
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
STANDARDS AND DETAILS BOOK WHICH THEY REVISE OR IN WHICH THERE IS A CONFLICT.
ANY REVISIONS CONTAINED WITHIN THIS PLAN SET SUPERSEDE THE 2026 CONSTRUCTION
http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspx
CONSTRUCTION STANDARDS AND DETAILS BOOK IS AVAILABLE AT:
STANDARDS AND DETAILS BOOK AND ATTACHED APPLICABLE REVISIONS. THE 2026
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE 2026 CONSTRUCTION
BE DEEMED TO MEAN BULLOCH COUNTY BOARD OF COMMISSIONERS.
OR " DEPARTMENT " WHEN THE CONTEXT THERE OF MEANS THE STATE HIGHWAY DEPARTMENT OF GEORGIA, AND SHALL
GEORGIA ", " STATE HIGHWAY DEPARTMENT ", " GEORGIA STATE HIGHWAY DEPARTMENT", " HIGHWAY DEPARTMENT ", PHOTOGRAPHS USED, OR TO BE USED IN CONNECTION WITH THIS DOCUMENT, TO " STATE HIGHWAY DEPARTMENT OF
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS, WRITINGS, DOCUMENTS, DRAWINGS, OR
NOTE :
DIRECTIONAL DIST: 62%
E 754158.6123
N 878206.0937
STA 104+70.00
PROJECT MIDPOINT
FY25-CP-E17
BULLOCH COUNTY PROJECT NUMBER
DREW TALLEY, P.E.
01-0001
BULLOCH COUNTY BOARD OF COMISSIONERS
COUNTY ENGINEER
W. RON NELSON
PL
PL
PL
PL
PL
PL
ROSCOE INVESTMENTS LLC
8/19/2019
Drew.Talley
2/11/2026 GPLOT-ORD
gplotborder-ORD-PO.tbl
0179830_01.dgn
CONCOV
150 300
SCALE IN FEET
0 75
Savannah, Georgia 31401
33 Bull Street, Suite 505
Engineering, Planning, and Environmental Consultants
DRAWING No.
COUNTRY
CLUB
ROAD
ROAD
BENT TREE
EXI
ST
R/ W
EXIST R/W
EXI
ST
R/ W
STA 102+40.00
COUNTRY CLUB ROAD
BEGIN CONSTRUCTION
E 753959.8030
N 877944.0902
STA 101+40.00
BEGIN PROJECT
STA 107+00.00
COUNTRY CLUB ROAD
END CONSTRUCTION
E 754423.6372
N 878400.7414
STA 108+00.00
END PROJECT
EXIST R/W
R/W
REQ'D
REQ'D R/W
E X I
S T
R
W
N A
D R A
LL
No. 055190
N
PROFESSIONAL
T
GI
N
E
G EG
R
O
SI
R
EER
ER
D
I E
G
A
E
H TW
E
E Y
02/11/2026
02-0001
DRAWING NO. DESCRIPTION DRAWING NO. DESCRIPTION
INDEX
DETAILS BOOK WHICH THEY REVISE OR IN WHICH THERE IS A CONFLICT.
ANY REVISIONS CONTAINED WITHIN THIS PLAN SET SUPERSEDE THE 2026 CONSTRUCTION STANDARDS AND https://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/Alllloms.aspx
AVAILABLE AT:
BOOK AND ATTACHED APPLICABLE REVISIONS. THE 2026 CONSTRUCTION STANDARDS AND DETAILS BOOK IS
THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE 2026 CONSTRUCTION STANDARDS AND DETAILS
1-0001
2-0001
4-0001
5-0001 TO 5-0014
13-0001
15-0001
23-0001 TO 23-0004
COVER DRAWING
INDEX
GENERAL NOTES
TYPICAL SECTIONS AND MISCELLANEOUS DETAILS
CONSTRUCTION PLAN
MAINLINE PROFILE
DRAINAGE PROFILE
CROSS SECTIONS
52-0001
53-0001
54-0001 TO 54-0003
51-0001 TO 51-0004
52-0002
52-0003
52-0004
52-0005
52-0006
52-0007
50-0001 ESPCP COVER
ESPCP GENERAL NOTES
CONST. DETAIL (EC-L1) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 1 OF 7) (03-17)
CONST. DETAIL (EC-L2) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 2 OF 7) (11-18)
CONST. DETAIL (EC-L3) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 3 OF 7) (03-17)
CONST. DETAIL (EC-L4) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 4 OF 7) (03-17)
CONST. DETAIL (EC-L5) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 5 OF 7) (03-17)
CONST. DETAIL (EC-L6) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 6 OF 7) (11-18)
CONST. DETAIL (EC-L7) - EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 7 OF 7) (03-17)
ESPCP DRAINAGE AREA MAP
BMP LOCATION DETAILS
WATERSHED MAP SITE MONITORING PLAN 55-0001
22-0001
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
17-0001 DRIVEWAY PROFILE
STREAM DIVERSION AND PUMP AROUND
D-55B:RIPRAP OUTLET PROTECTION (SHEET 2 OF 2)
D-55A:RIPRAP OUTLET PROTECTION (SHEET 1 OF 2)
D-52:BALED STRAW & COMPOST FILTER SOCK CHECK DAMS FOR EROSION CONTROL
D-41:CONSTRUCTION EXIT
D-24C:TEMPORARY SILT FENCE J-HOOKS. INLET SEDIMENT TRAPS (SHEET 3 OF 4)
D-24B:TEMPORARY SILT FENCE BERM DITCH. INSTALLATION. BRUSH BARRIER (SHEET 2 OF 4)
D-24A:TEMPORARY SILT FENCE (SHEET 1 OF 4)
EROSION CONTROL DETAILS
56-0008
56-0001
56-0002
56-0003
56-0004
56-0006
56-0007
56-0005
11-0001 CONSTRUCTION LAYOUT
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
2/11/2026
Drew.Talley
GPLOT-ORD
gplotborder-ORD-PO.tbl
0179830_02.dgn9:14:34 AM
GPLN-CE
Savannah, Georgia 31401
3 Bull Street, Suite 5053
Engineering, Planning, And Environmental Consultants
GENERAL NOTES
04-0001
UTILITY OWNER TYPE
TELEPHONEBULLOCH SOLUTIONS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
GENERAL NOTES PROJECT NOTES
GENERAL NOTES - STANDARD SIGNS
DUPLICATED OR ARE CONTRARY TO THESE SIGN PLANS.
10. THE CONTRACTOR WILL BE REQUIRED TO REMOVE ANY EXISTING SIGNS THAT ARE
PUNCHED, SHALL BE REQUIRED TO PROPERLY MOUNT THE ASSEMBLY.
ON THE POST(S), ADDITIONAL 3/8 INCH DIAMETER HOLE(S), DRILLED OR
9. WHERE SIGNS WITHIN AN ASSEMBLY EXTEND BELOW THE STANDARD MOUNTING HOLES
WITHIN AN ASSEMBLY.
8. A 1/2 INCH MINIMUM AIR SPACE SHALL BE REQUIRED BETWEEN ALL SIGN PLATES
RED SERIES SIGNS (R1-1, R1-2, R1-3P, R5-1, R5-1A, R5-1B).
7. TYPE 11 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR ALL
OR CLASS 2 ADHESIVE BACKING IS PERMISSIBLE.
AS SPECIFIED BELOW OR SPECIFIED OTHERWISE IN THE PLANS. EITHER CLASS 1
ALL STANDARD ROADWAY SIGNS REQUIRING REFLECTORIZED BACKGROUNDS EXCEPT
6. TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR
TYPICAL FRAMING DETAILS.
FRAMES. FOR DETAILS AND STRAP SPECIFICATIONS REFER TO SIGN ASSEMBLY-
5. SIGN ASSEMBLIES SHALL BE MOUNTED ON ALUMINUM OR GALVANIZED STEEL STRAP
PAVEMENT TO THE NEARER EDGE OF THE SIGN(S), WHICHEVER IS GREATER.
THE EDGE OF THE PAVED SHOULDER OR 12 FEET FROM THE NORMAL EDGE OF
4. HORIZONTAL CLEARANCE FOR STANDARD ROADWAY SIGNS SHALL BE 6 FEET FROM
HEIGHT OF 7 FEET ABOVE THE FINISHED GRADE.
SIDEWALK IS PROPOSED OR EXISTING, THE SIGNS SHALL BE ERECTED AT A
THE NORMAL EDGE OF PAVEMENT TO THE BOTTOM OF THE SIGN OR ASSEMBLY. IF
3. ALL STANDARD ROADWAY SIGNS SHALL BE ERECTED AT A HEIGHT OF 7 FEET ABOVE
PROJECT ENGINEER WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD.
EDITION. NO SIGN LOCATION SHALL BE CHANGED BY THE CONTRACTOR OR BY THE
SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT
FIELD CONDITIONS WHERE NECESSARY, BUT SHALL BE WITHIN THE LIMITATIONS
2. SIGN ERECTION STATIONS ARE APPROXIMATE AND MAY BE ADJUSTED TO MEET
SUBSEQUENTLY AMENDED.
TRANSPORTATION SPECIFICATIONS FOR CONSTRUCTION, 2021 EDITION, OR AS
TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND THE GEORGIA DEPARTMENT OF
ACCORDANCE WITH THE DETAILS SHOWN IN THE PLANS, THE MANUAL ON UNIFORM
1. ALL STANDARD ROADWAY SIGNS SHALL BE FABRICATED AND ERECTED IN
CONTACT
MSHARPE@BULLOCHSOLUTIONS.COM
+1 (912) 531-1845
MARK SHARPE
THE OVERALL PRICE BID FOR THE PROJECT.
ALL OTHER EXISTING PAVEMENT REMOVAL AND PREPARATION SHALL BE INCLUDED IN
SAWED LONGITUDINAL JOINTS ASSOCIATED WITH ASPHALT SHOULDER REMOVAL, AS WELL AS
PLANS AND REMOVAL SHALL BE INCLUDED IN THE OVERALL PRICE BID FOR THE PROJECT.
10. EXISTING PAVED SHOULDERS SHALL BE REMOVED UNLESS OTHERWISE NOTED ON THE
SHALL BE INCLUDED IN THE OVERALL PRICE BID FOR THE PROJECT.
OR AS DIRECTED BY THE ENGINEER. ALL GRINDING AND TEMPORARY STRIPING COSTS
WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD) CURRENT EDITION
THE TRAVELING PUBLIC. ALL REMAINING LINES OR MARKINGS SHALL BE IN ACCORDANCE
LINES TO THE SATISFACTION OF THE ENGINEER SUCH THAT THE LINES DO NOT CONFUSE
PATTERN BEING USED ON CONSTRUCTION, THE CONTRACTOR SHALL REMOVE OR OVERLAY
9. WHERE EXISTING PAVEMENT MARKINGS AND LINES ARE IN CONFLICT WITH THE TRAFFIC
IN THE OVERALL PRICE BID FOR THE PROJECT.
OVERALL PRICE BID FOR THE PROJECT. SAW CUTTING COSTS SHALL ALSO BE INCLUDED
CURBING IS TO BE PLACED ACROSS A PAVED AREA. COST SHALL BE INCLUDED IN THE
TO BE PLACED ADJACENT TO EXISTING PAVEMENT WITH A VERTICAL JOINT OR WHERE
PAVEMENT REMOVAL TO A NEAT LINE FOR ALL LOCATIONS WHERE NEW PAVEMENT IS
8. A JOINT SHALL BE SAWED ON A LINE ESTABLISHED BY THE ENGINEER TO ENSURE
SHALL BE PLACED FLUSH WITH FINISHED SURFACE.
7. RIGHT-OF-WAY MARKERS IN RESIDENTIAL LAWN AND DEVELOPED COMMERCIAL AREAS
COORDINATE WITH ADJACENT PROPERTY OWNERS DURING CONSTRUCTION.
REFER TO SUB-SECTION 107.07 OF THE STANDARD SPECIFICATIONS.CONTRACTOR SHALL
6. INGRESS AND EGRESS SHALL BE MAINTAINED AT ALL TIMES TO ADJACENT PROPERTIES.
PRICE BID FOR THE PROJECT.
RETARD DUST. ALL COSTS FOR DUST CONTROL SHALL BE INCLUDED IN THE OVERALL
SUBJECTED TO DUST FORMATION MUST BE PERIODICALLY WATERED, SUFFICIENT TO
5. THE CONTRACTOR SHALL STRICTLY ADHERE TO DUST CONTROL REGULATIONS. ALL AREAS
105.06 "COOPERATION WITH UTILITIES"
UNDERGROUND UTILITIES. THE CONTRACTOR'S ATTENTION IS CALLED TO SUB-SECTION
NUMBER 1-800-282-7411, FOR THE PURPOSE OF COORDINATING THE MARKING OF
4. THE CONTRACTOR SHALL BE REQUIRED TO USE THE ONE-CALL CENTER TELEPHONE
REMOVED OR RELOCATED TO CLEAR CONSTRUCTION IN ADVANCE OF WORK.
AND ARE NOT COVERED AS SPECIFIC ITEMS IN THE DETAILED ESTIMATE ARE TO BE
POSITION. ALL UTILITY FACILITIES, WHICH ARE IN CONFLICT WITH CONSTRUCTION
ON THE ROADWAY PROJECT IN ITS ORIGINAL, RELOCATED OR NEWLY INSTALLED
NOTED BELOW. "EXISTING UTILITY FACILITIES" MEANS ANY UTILITY THAT EXISTS
CONTRACTOR OF HIS RESPONSIBILITY TO SHOW KNOWN UTILITY FACILITIES EXCEPT AS
FACILITIES SUCH AS SERVICE LINES OR UNKNOWN FACILITIES WILL NOT RELIEVE THE
ARE NOT NECESSARILY ACCURATE IN LOCATION AS TO PLAN OR ELEVATION. UTILITY
3. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON ROADWAY PLANS, AND
TRANSPORTATION STANDARD SPECIFICATIONS AND 2024 SUPPLEMENTAL SPECIFICATIONS.
2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE 2021 GEORGIA DEPARTMENT OF
THIS WORK SHALL BE INCLUDED IN THE OVERALL PRICE BID FOR THE PROJECT.
PAVEMENT AT THE PROJECT TIE-IN LOCATIONS. ALL COSTS ASSOCIATED WITH
ENSURE A SMOOTH TRANSITION FROM EXISTING ASPHALT PAVEMENT TO NEW ASPHALT
6. THE CONTRACTOR SHALL MILL AND INLAY ASPHALT PAVEMENT AS REQUIRED TO
WITH REQUIREMENTS FOR THIS PROJECT.
STREAM DIVERSION OR A STREAM DIVERSION CHANNEL THAT ADEQUATELY COMPLIES
CONSTRUCTION OF THE NEW STRUCTURE, WHILE ALSO PROVIDING FOR A TEMPORARY
THE SEQUENCE OF OPERATIONS FOR DEMOLITION OF THE EXISTING STRUCTURE AND
PREPARE AND SUBMIT FOR APPROVAL A DETAILED PLAN THAT CLEARLY DEFINES
PERFORMANCE OF THE DRAINAGE WORK AT THIS LOCATION, THE CONTRACTOR SHALL
CHANNEL FOR DRAINAGE WORK AT THIS LOCATION. THEREFORE, PRIOR TO
APPROVED METHODS TO CONSTRUCT A STREAM DIVERSION OR STREAM DIVERSION
5. THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLANS DO NOT CONTAIN
START OF CONSTRUCTION.
AND SUBMIT A DEMOLITION PLAN TO THE ENGINEER FOR ACCEPTANCE PRIOR TO THE
IN THE OVERALL PRICE BID FOR THE PROJECT. THE CONTRACTOR SHALL PREPARE
EXISTING TRIPLE 42 INCH REINFORCED CONCRETE PIPE SHALL BE INCLUDED
4. ALL COSTS ASSOCIATED WITH THE DEMOLITION, REMOVAL, AND DISPOSAL OF THE
PAYMENT WILL BE MADE FOR ANY COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT.
PLANS AND HAVING SPECIFIC PAY ITEMS IN THE DETAILED ESTIMATE. NO SEPARATE
ENGINEER EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT SPECIFIC LOCATIONS IN THE
STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED OR REGRADED AS REQUIRED BY THE
TO, REPLACEMENT TO, REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE
AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE BUT NOT BE LIMITED
3. THE CONTRACTOR SHALL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED
SPECIFICATIONS AND SUPPLEMENTS THERETO FOR ADDITIONAL INFORMATION.
201 OF THE GEORGIA DEPARTMENT OF TRANSPORTATION ("GDOT") STANDARD
A PERMITTED INERT WASTE LANDFILL, OR IN AN ENGINEERED FILL. SEE SECTION
RIGHT OF WAY SHALL BE PLACED IN EITHER A PERMITTED SOLID WASTE FACILITY,
ALL COMMON FILL OR EXCESS MATERIAL DISPOSED OUTSIDE THE PROJECT
APPROVED PRIOR TO CONSTRUCTION ACTIVITIES OCCURRING IN THEM.
2. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE ENVIRONMENTALLY
1. THIS PROJECT DOES NOT REQUIRE AN NOI.
EXCELSIOR EMC
DISTRIBUTION
ELECTRIC
HOWARD.PORTER@EXCELSIOREMC.COM
+1 (912) 685-2115
HOWARD PORTER
VYVE FIBER TELEPHONE
DARREN.BOUMA@VYVEBB.COM
+1 (912) 618-0590
DARREN BOUMA
GRADED AGGREGATE BASE, 6 IN.
INCL BITUM MTL & H LIME,
ASPHALT - 165 LB/SY RECYCLED ASPH CONC 12.5MM SUPERPAVE, GP 2 ONLY,
RESIDENTIAL:
CONSTRUCTED. DRIVES SHALL BE CONSTRUCTED USING:
REVISIONS TO LOCATION, WIDTH, AND/OR NUMBER OF DRIVES TO BE
SHALL OBTAIN THE APPROVAL FROM THE ENGINEER PRIOR TO MAKING ANY
EXISTING DRIVEWAYS AT THE TIE IN POINT, IF APPLICABLE. THE CONTRACTOR
CONTRACTOR SHALL CONSTRUCT DRIVEWAYS TO MATCH THE LOCATION OF
DRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST AVAILABLE DATA; THE
SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE IN THE PLANS. EXISTING
THE THROAT UNLESS NOTED OTHERWISE IN THE PLANS. COMMERCIAL DRIVES
EARTH / GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE AT
ASPHALT FOR ASPHALT, CONCRETE FOR CONCRETE AND ASPHALT FOR
THE PLANS. ALL OTHER DRIVEWAYS SHALL BE REPLACED AS FOLLOWS:
11% IN GRADE SHALL BE PAVED WITH CONCRETE UNLESS OTHERWISE NOTED IN
TIE IN POINT AS SHOWN IN THE PLANS AND PROFILES. ALL DRIVEWAYS OVER
1. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED BACK TO THE
COORDINATE WITH RON NELSON (912-531-5708) PRIOR TO ANY TREE CLEARINGS.
RIGHT-OF-WAY, UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL CONTACT AND
14. THE CONTRACTOR IS RESPONSIBLE FOR TREE CLEARING WITHIN THE LIMITS OF
FOR THE PROJECT.
ALL WORK ASSOCIATED WITH REMOVAL SHALL BE INCLUDED IN THE OVERALL PRICE BID
CONSTRUCTION LIMITS UNLESS PLANS OR PROJECT ENGINEER INIDICATE OTHERWISE.
13. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL SIGNS AND LIGHT POLES WITHIN
INCLUDED IN THE PRICE BID FOR TRAFFIC CONTROL - LUMP SUM.
MET. ALL LABOR AND MATERIALS REQUIRED TO SATISFY THIS COMMENT SHALL BE
COMPLETION OF CONSTRUCTION TO ENSURE CURRENT RETROREFLECTIVITY STANDARDS ARE
AND MUTCD SIGNS MUST BE REPLACED AND SET AT THE FINAL LOCATION AT THE
DURING CONSTRUCTION, IT MUST BE RESET AT THE END OF EACH WORKDAY.ALL COUNTY
PROJECT LIMITS DURING CONSTRUCTION. IF A STREET NAME SIGN MUST BE MOVED
12. THE CONTRACTOR SHALL PROTECT ALL POST-MOUNTED STREET NAME SIGNS WITHIN THE
PRICE BID FOR THE PROJECT.
THAT ARE TO REMAIN IN PLACE. THIS WORK SHALL BE INCLUDED IN THE OVERALL
11. THE CONTRACTOR SHALL CLEAN OUT ALL EXISTING DRAINAGE STRUCTURES AND PIPES
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
2/11/2026
Drew.Talley gplotborder-ORD-PO.tbl
GPLOT-ORD 0179830_04.dgn9:15:41 AM
GPLN-CE
Savannah, Georgia 31401
CL
PAVEMENT DESIGN
B
8" GRADED AGGREGATE BASE
220 LB/SY RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME
D
C
A 165 LB/SY RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM MTL & H LIME
PAVEMENT SAFETY EDGE (GDOT DETAIL P-7)
CL
RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H LIMEE
TYPE 2, 18" WIDE, CENTERED ON JOINT
PAVEMENT REINFORCEMENT FABRIC
OF 19 MM LAYER
SAWCUT TO BOTTOM
PAVEMENT REINFORCEMENT FABRIC STRIPS, TP 2, 18" WIDEF
05-0001
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
PONTIAC
PONTIAC
TYPICAL SECTION #1
STA. 105+00.00 TO 107+00.00
STA. 102+40.00 TO 104+00.00
COUNTRY CLUB ROAD
NOTES
FULL-DEPTH ASPHALT PAVEMENT IS NOT PRESENT.
CONTRACTOR TO REMOVE EXISTING PAVED SHOULDERS IF 4.
3. SEE EXISTING PAVEMENT SAWCUT DETAIL.
ACCORDANCE WITH CROSS-SECTIONS.
CONTRACTOR SHALL CONSTRUCT FILL AND CUT SLOPES IN2.
TO BE 2%.
SLOPE SHALL NOT EXCEED 8%. MINIMUM SHOULDER SLOPE
ALGEBRAIC DIFFERENCE IN PAVING SLOPE AND SHOULDER
SHOULDER TO SLOPE AT NORMAL RATE, HOWEVER, THE1.
A
B
D
D
A
B
TYPICAL SECTION #2
STA. 104+00.00 TO 105+00.00
COUNTRY CLUB ROAD
E
1'-0"
0'-9"
C
B
A
EXISTING PAVEMENT
EXISTING ASPHALT SAWCUT AND RESURFACING DETAIL
A
E
A
WHERE GUARDRAIL IS ADJACENT TO PAVED SHOULDERS.
SEE ROADWAY PLANS FOR LOCATION OF GUARDRAIL. REFER TO GDOT STD DETAIL S-4
D
A
B
C
A
B
C
D
C
C
FF
F
107+00.00 (LT)
STA. 106+00.00 TO
104+64.00 (LT)
STA. 104+36.00 TO
COUNTRY CLUB ROAD
SHOULDER DETAIL
A
B
D
C
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
gplotborder-ORD-PO.tbl
0179830_05.dgn6:49:42 PM
GPLN-CE
Savannah, Georgia 31401
11/05/2020
1/29/2026
Drew.Talley
GPLOT-ORD 0179830_05.dgn6:49:42 PM
Note 3 See
Note 3 See
Travel Lane 11'-0"
Shoulder 6'-0"
Grade Profile
Travel Lane 11'-0"
Shoulder 6'-0"
Travel Lane 11'-0"
Shoulder 6'-0"
4:1
Grade Profile
Travel Lane 11'-0"
2'-0"
Shoulder Paved
2'-0"
Shoulder Paved
2.5 :1
MAX
2:1 MAX
4:1
GAB Pay Limits
Limits Pay
GAB
Limits Pay
GAB
Shoulder 6'-0"
2'-0"
Shoulder Paved
2.5:1 MAX
4:1
Shoulder Paved
2'-0"
VARIESVARIES
VARIES VARIES
VARIES
1.70% 6.30% 6.30%
6.30% 6.30%
6.30%
2:1
VariesVaries 2'-0"
4:1
2.5 :1
MAX
VariesVaries 2'-0"
M A
T C
H L
IN
E
A
2:1
MAX
VARIESVARIES
M A
T C
H L
IN
E
A
4:1
2'-0"
Shoulder Paved
Limits Pay
GAB
Shoulder 6'-0"Varies
M A
T C
H L
IN
E
A
Varies
Varies
2:1
VARIES
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
05-0002
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
gplotborder-ORD-PO.tbl
0179830_05.dgn
12:03:37 PM
05-0003
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:03:41 PM
05-0004
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:03:47 PM
05-0005
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:03:54 PM
05-0006
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:03:57 PM
05-0007
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:01 PM
05-0008
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:05 PM
05-0009
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:07 PM
05-0010
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:11 PM
05-0011
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:18 PM
05-0012
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:24 PM
05-0013
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:27 PM
05-0014
MISCELLANEOUS DETAILS
TYPICAL SECTIONS AND
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
11/12/2025
Drew.Talley
GPLOT-ORD
12:04:34 PM
E 953959.8030
N 877944.0902
STA 101+40.00
BEGIN PROJECT
STA 102+40.00
COUNTRY CLUB ROAD
BEGIN CONSTRUCTION
POINT #1
POINT #2
STA 107+00.00
COUNTRY CLUB ROAD
END CONSTRUCTION
E 754423.6372
N 878400.7414
STA 108+00.00
END PROJECT
L
COUNTRY CLUB ROAD
CONSTRUCTION C
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
CONSTRUCTION LAYOUT DRAWING
11-0001
POB 100+00.00
N24°55'50.6"E
100+60.00 PC
D.S. 45 mph eMAX 8.00% ed 6.30%
'85.61E
1145.00'R
859.21'L
450.97'T
05°00'14.39"D
(RT)42°59'40.8"¬
754,113.6675E
878,281.7253N
105+10.97PI
CURVE# 1
CURVE# 1
POE 110+00.00
N67°55'31.4"E
PT 109+19.21
50 200
SCALE IN FEET
0 100
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/30/2026
Drew.Talley
GPLOT-ORD
0179830_11.dgn
10:31:06 AM
POINT NO.
#1
754304.9580878340.7955#2
878175.1070 754113.8230
EASTINGNORTHING ELEVATION
162.18'
162.58'
STATION
106+67.97
104+16.85
OFFSET
10.52'LT
10.59'LT
DESCRIPTION
MAGNAIL IN ASPHALT
MAGNAIL IN ASPHALT
SURVEY CONTROL
Savannah, Georgia 31401
ZONE A
POINT #1
ZONE X
POINT #2
Z O
N E
A
Z O
X
16"C
31"O
15"O 15"G
20"O 18"O
17"P
17"O
19"O
23"G
IE:148.39'
T
TPED
R/W
REQ'D
R/W
REQ'D
CONSTRUCTION PLANS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
13-0001
STA 104+63 LT
(12" X 36")
OM3-R
STA 104+37 LT
(12" X 36")
OM3-L
STA 104+63 RT
(12" X 36")
OM3-L
STA 104+37 RT
(12" X 36")
OM3-R
STRIPING (TYP)
6" SOLID WHITE THERMOPLASTIC
6" SOLID WHITE THEROMPLASTIC STRIPING (TYP)
(2 EA) PER GDOT STD T-11A (TYP)
STRIPING TP 1 YELLOW RPMS @ 40' SPACING
6" SOLID DOUBLE YELLOW THERMOPLASTIC
STA 107+95 LT
(30" X 30")
W8-17
STA 107+95 LT
(24" X 18")
W8-17P
18"
INV = 159.10'
STA 102+40.00, 29.00'LT
BEGIN SPECIAL DITCH
INV = 157.81'
GDOT STD 1120
STA 103+04.00, 35.00'LT
END SPECIAL DITCH
RCP @ 0.45%
32 LF 18"
INV = 154.36'
STA 104+36.00, 45.50'LT
END SPECIAL DITCH
(TYP)
24" DEPTH
RIP RAP
TYPE 3
INV = 154.35'
47.00'LT
STA 104+64.00
BEGIN SPECIAL DITCH
INV = 154.62'
STA 105+54.00, 49.00'LT
SPECIAL DITCH HIGH POINT
SEE PROJECT NOTE 4
TRIPLE 42" RCP (TYP)
DISPOSE OF EXISITING
DEMOLISH, REMOVE, AND
SEE SHEET 22-0001
GDOT STDS 2402-1 AND 2402-2-C
BOX CULVERT WITH 6" BAFFLES
5'X5' REINFORCED CONCRETE
INSTALL 60.5 LF DOUBLE
GDOT STD 2406
BOX CULVERT APRON
INSTALL CONCRETE
INV = 157.67'
GDOT STD 1120
STA 103+36.00, 35.50'LT
BEGIN SPECIAL DITCH
24" DEPTH (TYP)
TYPE 3 RIP RAP
INV = 153.97'
STA 106+00.00, 49.50'LT
END SPECIAL DITCH
IN ROADWAY CLEAR ZONE AS SHOWN (TYP)
CONTRACTOR SHALL NOT PLACE RIP RAP
COUNTRY C
LUB R
OAD
CONSTRUCTION CL
CURVE# 1
P
.9
I
TAPER
15:1
TAPER
15:1
SEE PROJECT NOTE 6
STA 102+40.00
COUNTRY CLUB ROAD
TIE TO EXIST MARKINGS
BEGIN OVERLAY AND LEVELING
BEGIN CONSTRUCTION
E 953959.8030
N 877944.0902
STA 101+40.00
BEGIN PROJECT
SEE PROJECT NOTE 6
STA 107+00.00
COUNTRY CLUB ROAD
TIE TO EXIST MARKINGS
END OVERLAY AND LEVELING
END CONSTRUCTION
STA 102+70.00, 13.00'RT
BEGIN 2' PAVED SHOULDER
STA 106+70.00, 13.00'RT
END 2' PAVED SHOULDER
13.00'LT
STA 106+70.00
SHOULDER
END 2' PAVED
E 754423.6372
N 878400.7414
STA 108+00.00
END PROJECT
STA 104+00.00
PAVEMENT REPLACEMENT
BEGIN FULL-DEPTH
END OVERLAY AND LEVELING
STA 105+00.00
BEGIN OVERLAY AND LEVELING
PAVEMENT REPLACEMENT
END FULL-DEPTH
STA 103+49.25, 19.00'LT
GDOT STD 4383
REQ'D TP 1 ANCHOR
GDOT STD 4388
BEGIN W-BEAM GUARDRAIL
STA 105+96.50, 19.00'LT
ANCHOR GDOT STD 4384
REQ'D TP 12A
GDOT STD 4388
END W-BEAM GUARDRAIL
STA 103+23.50, 19.00'RT
GDOT STD 4384
REQ'D TP 12A ANCHOR
GDOT STD 4388
BEGIN W-BEAM GUARDRAIL
STA 106+17.25, 19.00'RT
GDOT STD 4383
GDOT STD 4388
END W-BEAM GUARDRAIL
DW1
ASPH
14'
E X I
S T
E X I
S T
B
F S
E F
S
E X I
S T
E X I
S T
FACE GDOT DETAIL S-4 (TYP)
ADD'L SHOULDER PAVING TO GR
FACE GDOT DETAIL S-4 (TYP)
ADD'L SHOULDER PAVING TO GR
B
F S
E F
S
STA 102+70.00, 13.00'LT
BEGIN 2' PAVED SHOULDER
LIMITS OF OVERLAY (TYP)
LIMITS OF OVERLAY (TYP)
2' PAVED SHOULDER (TYP)
2' PAVED SHOULDER (TYP)
EXIST TREE
DO NOT DISTURB
15:1 TAPER
15:1 TAPER
STA 103+86.00, 22.50' LT
BEGIN TP 3 RIP RAP, 24" DEPTH
STA 106+15.00, 27.00'LT
END TP 3 RIP RAP, 24" DEPTH
EXIST TREE
DO NOT DISTURB
DO NOT DISTURB EXIST POLE
IE=154.96'
IE=155.21'
IE=154.93'
IE=151.68'
IE=153.65'
IE=153.78'
C
P
P
P
IE=148.90'
IE=148.39'
BOX CULVERT
9'X9' TRIPLE
HEADWALL
HEADWALL
HEADWALL
18"
RCP
BERM
TOP OF
EXIS
T R
/W
EXIST R/W
EXIST R/W
EXIS
T R
/W
PL
PL
IE=158.40'
IE=158.28'
PL
COAX AND FIBER
EXISTING VYVE FIBER
BFO144
SOLUTIONS
BULLOCH
EXISTING
SOLUTIONS BFO12
EXISTING BULLOCH
ROSCOE INVESTMENTS LLC
N/F
LLC
ROSCOE INVESTMENTS
N/F
TAYLOR BRIAN C
N/F
ROSCOE INVESTMENTS LLC
N/F
JOHN JR & KERRI
ARENDES BRIAN
N/F
JOHN JR
GRIFFIN
N/F
FENCE (TYP)
ORANGE BARRIER
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
25 100
SCALE IN FEET
0 50
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
2/6/2026
USER:Drew.Talley
GPLOT-V8
SCREEN_13.tbl
K:\SAV_Roadway\017983003_Country Club Road\CADD (ORD 2023)\0179830_13.dgn
3:53:05 PM
-8.4000%
-0.4500%
0.3000% -1.4000%
15-0001
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
MAINLINE PROFILE
.0
.0
.0
.9
.8
.7
.5
.4
.4
.4
.4
.5
.5
-0.8000%
P V
I
L
P V
I
P V
I
P V
T
P V
C
P V
R C
V L
O W
V L
O W
V H
I G
H
140.00' VC
K = 215.38
DS = 45 mph
140.00' VC
K = 103.70
DS = 45 mph
140.00' VC
K = 124.44
DS = 45 mph
102+00 103+00 104+00 105+00 106+00 107+00 108+00
140 140
145 145
150 150
155 155
160 160
165 165
170 170
175 175
180 180
BEGIN SPECIAL DITCH LT
STA 102+40.00
ELEV = 159.10' STA 102+53.00
ELEV = 158.04'
-8.1500% PROPOSED DOUBLE 5'X5'
REINFORCED CONCRETE
BOX CULVERT
INV = 152.38'
END SPECIAL DITCH LT
STA 104+36.00
ELEV = 154.36'
STA 104+00.00
ELEV = 157.38'
BEGIN SPECIAL DITCH LT
STA 104+64.00
ELEV = 154.35'
STA 105+54.00
ELEV = 154.62'
END SPECIAL DITCH LT
STA 106+00.00
ELEV = 153.97'
PROPOSED
GRADE
EXISTING
GROUND
END CONSTRUCTION
END GRADE
COUNTRY CLUB ROAD
STA 107+00.00
ELEV = 161.49'
-0.3250%
END PROJECT
STA 107+60.00
BEGIN CONSTRUCTION
BEGIN GRADE
COUNTRY CLUB ROAD
STA 102+40.00
ELEV = 162.00'
-0.1000%
BEGIN PROJECT
STA 101+40.00
0.5500%
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
0179830_15.dgn
6:22:08 PM
Engineering, Planning, And Environmental Consultants
1" = 10'
VERTICAL
1" = 50'
HORIZONTAL
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
END DRIVEWAY
40.00' LT
ELEV 160.94' BEGIN DRIVEWAY
13.00' LT
ELEV 162.89'
PROPOSED
GRADE
6.30%
EXISTING
GROUND
-8.25%
DW1
COUNTRY CLUB ROAD STA 103+20.50
GDOT DETAIL 9031-H
14.00' RESIDENTIAL ASPHALT DRIVE
P V
I
.0
E
L
.0
P V
I
.5
E
L
.0
.8
1.70%
-11.00%
EXISTING
18" RCP
DRIVEWAY PROFILE
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
17-0001
.9
1+00 0+90 0+80 0+70 0+60 0+50 0+40 0+30 0+20 0+10 0+00
160 160
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
0179830_17.dgn
1:59:04 PM
1" = 20'
VERTICAL
1" = 40'
HORIZONTAL
Savannah, Georgia 31401
3 Bull Street, Suite 5053
Engineering, Planning, And Environmental ConsultantsMATCH EXISTING:
10.00' VC AT ALL PVI'S DENOTED BY:
5.00' SAG VC AT ALL PVI'S DENOTED BY:
5.00' CREST VC AT ALL PVI'S DENOTED BY:
NOTE:
DRAINAGE PROFILE
COUNTRY CLUB ROAD
22-0001
104+50.00
-120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120
140 140
150 150
160 160
170 170 1 .4
1.
EXISTING GROUND
PROPOSED FINISHED GRADE
INV = 154.35'
GDOT STD 2404-1
STA 104+50.00, 27.50'LT
INV = 150.00'
GDOT STD 2406-2
GDOT STD 2406-1 AND
STA 104+50.00, 33.00'RT
60.5' @ 7.20%
DOUBLE 5' X 5' BOX CULVERT
EMBEDDED 1'
GDOT STANDARDS 2402-1 AND 2402-2-C
H = 1'-10'
W-BEAM GUARDRAIL (TYP)
MATERIAL, 12" DEPTH
TP II FOUNDATIONAL BACKFILL
HW (10) = 155.58'
HW (50) = 156.99'
HW (100) = 159.83'
INV - 155.35'
UPSTREAM BOTTOM
24" DEPTH
TP 3 RIP RAP
GDOT DETAIL D-48
6" CONC BAFFLE (TYP)
24" DEPTH
TP 3 RIP RAP
DOWNSTREAM BOTTOM
INV - 151.00'
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
2/2/2026
Drew.Talley
GPLOT-ORD
0179830_22.dgn
7:17:50 PM
102+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
150 150
160 160
170 170
2.
4:12:1
102+40.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
150 150
160 160
170 170
4:1 -1.88% 6.12% -7.05%-7.05%
.0
.1
.1
2.
159.10
2.5:1 158.29
102+50.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
150 150
160 160
170 170
4:1 -1.80% 6.20% -6.70%
.0
.2
.5
2.
00 4:1
-6.70%
-6.30%
2:1
EARTHWORK CROSS SECTIONS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
23-0001
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
157.83
103+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
150 150
160 160
170 170
4:1
-1.70% 6.30% -6.30% 4:1
.0
.6
.5
2.
003:1 -6.30%
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
0179830_23.dgn
6:51:57 PM
-6.30%-1.70%
2:1
-1.70%
157.61
103+50.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
4:1 6.30% -6.30%
.1
.4
1.
913:
1 4:1
.3
-6.30% 6.30%
-1.70%
-1.70%
-6.30%
2:1
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
EARTHWORK CROSS SECTIONS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
23-0002
SEE SHEET 22-0001 FOR DOUBLE 5' X 5' BOX CULVERT PROFILE
R/W
REQ'D
3:1
157.38
4:1 3 .9
104+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
2.
5:
6.30% -6.30%
.4
.2
1.
-6.30% 6.30%
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
6:51:46 PM
-1.70%
-1.70%
-6.30%
2.5:1 105+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
4:1 6.30% -6.30%
.2
.1
1.
3:1
154.46
.3
1-6.30% 6.30%
2.1
-1.70%
-1.70%
-6.30%
3:1
2.1
105+50.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
4:1 6.30% -6.30%
.9
.1
1.
154.61
4:1 3 .5
-6.30% 6.30%
3:1
-1.70%
-1.70%
-6.30%
2:1
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
EARTHWORK CROSS SECTIONS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
23-0003
R/W
REQ'D
R/W
REQ'D
R/W
REQ'D
R/W
REQ'D
3:13:1 106+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
4:1 6.30% -6.30%
.5
.2
1.
153.97
4:1
.8
4-6.30% 6.30%
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
6:51:22 PM
107+50.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
150 150
160 160
170 170
1.
106+50.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
2:
-1.70% 6.30% -6.30%
.4
.0
1.
4:1
4:1 2:1
.0
-6.30%
-1.70%
R/W
EXIST
R/W
EXIST
R/W
EXIST
R/W
EXIST
EARTHWORK CROSS SECTIONS
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
23-0004
R/W
REQ'D
R/W
EXIST
R/W
EXIST
107+00.00
-140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140
140 140
150 150
160 160
170 170
-0.85% 7.15% -7.85%
.4
.9
1.
-7.85%2:
4:1 2:1
.0
1" = 20'
VERTICAL
1" = 20'
HORIZONTAL
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/30/2026
Drew.Talley
GPLOT-ORD
10:33:40 AM
5 Bull Street, Suite 4002
LOCATION
PROJECT
LOCATION SKETCH
BOARD OF COMMISSIONERS
bulloch county
EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
CULVERT REPLACEMENT
COUNTRY CLUB ROAD
FEDERAL ROUTE No.: N/A
STATE ROUTE No.: N/A
P.I. No.: N/A
PLANS PREPARED BY:
UNDER THE SUPERVISION OF:
FY25-CP-E17
BULLOCH COUNTY PROJECT NUMBER
RHODES HUNT, P.E.
50-0001
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROADWAY
COUNTY No.31
LENGTH OF PROJECT
MILES
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 EAST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
locations described herein by myself or my authorized agent, under my supervision."
"I certify under penalty of law that this Plan was prepared after a site visit to the receiving water."
representative of the increase in the turbidity of a specific identified un-sampled in the turbidity of each specific identified sampled receiving water will be the factors required in the General NPDES Permit No. GAR100002, that the increase proposed to be sampled, I have determined in my professional judgment, utilizing specific identified perennial or intermittent stream and other water body is not perennial and intermittent streams and other water bodies, or (b) where any such water bodies shown on the USGS topographic map and all other field verified provides for the monitoring of: (a) all perennial and intermittent streams and other
"I certify that the permittee's Erosion, Sedimentation and Pollution Control Plan to meet the requirements contained in the General NPDES Permit No. GAR100002."
designed system of best management practices and sampling methods is expected receiving water(s) or the sampling of the stormwater outfalls and that the which the land-disturbing activity was permitted, provides for sampling of the
Georgia Soil and Water Conservation Commission as of January 1 of the year in
"Manual for Erosion and Sediment Control in Georgia" (Manual) published by the practices required by the Georgia Water Quality Control Act and the document provides for an appropriate and comprehensive system of best management
"I certify that the permittee's Erosion, Sedimentation and Pollution Control Plan
No. GAR100002."
prepared in accordance with Part IV PAGE 21, of the General NPDES Permit
"I certify that this Erosion, Sedimentation and Pollution Control Plan has been
SIGNATURE
NUMBER 0000104979
GSWCC LEVEL II CERTIFICATION
PL
PL
PL
PL
PL
ROSCOE INVESTMENTS LLC
N/F
8/19/2019
Drew.Talley
2/11/2026 GPLOT-ORD
gplotborder-ORD-PO.tbl
0179830_01.dgn
CONCOV
Savannah, Georgia 31401
33 Bull Street, Suite 505
Engineering, Planning, and Environmental Consultants
DRAWING No.
COUNTRY
CLUB
ROAD
ROAD
BENT TREE
EXI
ST
R/ W
EXIST R/W
EXI
ST
R/ W
STA 102+40.00
COUNTRY CLUB ROAD
BEGIN CONSTRUCTION
E 753959.8030
N 877944.0902
STA 101+40.00
BEGIN PROJECT
STA 107+00.00
COUNTRY CLUB ROAD
END CONSTRUCTION
E 754423.6372
N 878400.7414
STA 108+00.00
END PROJECT
EXIST R/W
R/W
REQ'D
REQ'D R/W
E X I
W
Name
Street Address
Email Address
Phone Number
City. State Zip
150 300
SCALE IN FEET
0 75
DRAWING NUMBER(S)DATE
REVISIONS
PLANS COMPLETED 02/11/2026
ENTITY REQUESTING REVISION(S) SIGNATURE GSWCC LEVEL II CERT.#
Contractor shall complete the information in this box.
24 HOUR CONTACT:
MID-POINT COORDINATES
END-POINT COORDINATES
Longitude: -81.8498°
Latitude: 32.4134°
Longitude: -81.8484°
Latitude: 32.4146°
Longitude: -81.8499°
Latitude: 32.1640°
BEGIN-POINT COORDINATES
PRIMARY PERMITTEE
STATESBORO, GEORGIA 30458
115 NORTH MAIN STREET
BULLOCH COUNTY BOARD OF COMMISSIONERS
H R
O D U
T
N
No. 046667
N
PROFESSIONAL
T
GI
N
E
G EG
R
O
SI
R
EER
ER
D
I E
G
A
E
S HS
E
02/11/2026
NUMBER 0000104979
Email: RON NELSON
Phone: (912) 531-5708
CONTACT : RON NELSON
PHONE: (912) 531-5708
0.117
N/A
0.117
N/A
0.117
0.125
N/A
0.125
N/A
0.125
ESPCP GENERAL NOTES
51-0001
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
0179830_51.dgn
7:18:41 PM
No alternative or additional BMPs will be used on this project.
ESPCP GENERAL NOTES
51-0002
ESPCP GENERAL NOTES PETROLEUM STORAGE,SPILLS AND LEAKS
SOIL SERIES INFORMATION
POSTCONSTRUCTION BMPs FOR STORMWATER MANAGEMENT
WASTE DISPOSAL
NONSTORMWATER DISCHARGES
DEWATERING AND PUMPING ACTIVITIES
OTHER CONTROLS
USE OF ALTERNATIVE AND/OR ADDITIONAL BMPS:
READY MIX CHUTE WASH DOWN
ESPCP ALTERATIONS
SITE STABLIZATION AND VEGETATION PLANTING SCHEDULE
CONSTRUCTION SCHEDULE AND SEQUENCE OF MAJOR ACTIVITIES
BMP INSTALLATION AND MAINTENANCE MEASURES
The Contractor is responsible for developing the construction schedule for the project. The construction schedule for this project shall be submitted after the project is awarded. A copy of the construction schedule shall be maintained at the project site.
The project budget includes sufficient funds for the payment of construction exits. The Contractor is responsible for establishing at least one (1) construction exit per the specifications of the construction exit detail included in this ESPCP to minimize or eliminate the vehicle tracking of dirt, soils, and sediments off site. To facilitate project logistics, the Contractor is also responsible for selecting the location(s) of the construction exit(s).
See the Department's Standard Specifications (or Special Provisions) 161, 163, 165, 700, 711, and other contract documents for installation and maintenance measures.
These plans expressly delegate the responsibility of proper on-site hazardous material management to the
Contractor. The Contractor shall at a minimum provide an action plan and keep the necessary materials on site for the capture, clean up, and disposal of any petroleum product, or other hazardous material, leaks or spills associated with the servicing, refueling or operation of any equipment utilized at the site. A copy of the action plan shall be submitted to the Project Engineer and maintained on the project site. All personnel operating or servicing equipment shall be familiar with the action plan. The Contractor shall not park, refuel, or maintain equipment within stream buffers.
If the Contractor elects to store petroleum products on site, the Contractor shall prepare an ESPCP addendum that addresses the additional BMPs needed for onsite storage and spill prevention for petroleum products. This plan shall be prepared by a Certified Design Professional as required by GAR100002 for inclusion with these plans. The Contractor's attention is specifically directed to Standard Specification 107-
Legal Regulations and Responsibility to the public for additional requirements.
Any pumped discharge from an excavation or disturbed area shall be routed through an appropriately sized sediment basin, silt filter bag, or shall be treated equivalently with suitable BMP's. The contractor shall ensure the post BMP treated discharge is sheet flowing. Failure to create sheet flow will obligate the contractor to perform water quality sampling of pumped discharges. The contractor shall prepare sampling plans in accordance with the current GAR100002 NPDES permit by utilizing a Certified Design Professional. No separate payment will be made for water quality sampling of pump discharges.
Nonstormwater discharges defined in Part III.A.2 of the NPDES Permit will be identified after construction has commenced. These discharges shall be subject to the same requirements as storm water discharges required by the Georgia Erosion and Sedimentation Control Act, the NPDES Permit, the Clean Water Act, the
Manual for Erosion and Sediment Control in Georgia, Department Standards, and other contract documents. The
NPDES does not authorize the discharge of soaps or solvents used in vehicle and equipment washing or the discharge of wastewater containing stucco, paint,oils, curing compounds, and other construction materials.
The washing of ready-mix concrete drums and dump truck bodies used in the delivery of Portland cement concrete is prohibited on this site.
In accordance with Standard Specification 107: Legal Regulations and Responsibility to the Public, only the discharge chute utilized in the delivery of Portland cement concrete may be rinsed free of fresh concrete remains. The Contractor shall excavate a pit outside of State water buffers, at least 25 feet from any storm drain and outside of the travelled way, including shoulders, for a wash-down pit. The pit shall be large enough to store all wash-down water without overtopping. Immediately after the wash-down operations are completed and after the wash-down water has soaked into the ground, the pit shall be filled in, and the ground above it shall be graded to match the elevation of the surrounding areas. Alternate wash-down plans must be approved by the Project Engineer.
Wash-down plans describe procedures that prevent wash-down water from entering streams and rivers. Never dispose of wash-down water down a storm drain. Establish a wash-down pit that includes the following: (1) a location away from any storm drain, stream, or river, (2) access to the vehicle being used for wash down, (3) sufficient volume for wash-down water, and (4) permission to use the area for wash down.
On sites where permission or access to excavate a wash-down pit is unavailable, the Contractor may have to wash-down into a sealable 55-gallon drum or other suitable container and then transport the container to a proper disposal site. For additional information, refer to the Georgia Small Business Environmental Assistance
Program's "A Guide for Ready Mix Chute/Hopper Wash-down".
If the Contractor elects to store building material, building products, construction waste, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials on the site, the
Contractor shall provide an appropriate covering to minimize the exposure of those materials or products to precipitation and stormwater to minimize the discharge of pollutants. Minimization of exposure is not required in cases where exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of the specific material or product poses little risk to stormwater contamination or is intended for outdoor use.
The Contractor shall follow this ESPCP and ensure and demonstrate compliance with all applicable State and/or local regulations for waste disposal, sanitary sewer and septic systems, and petroleum storage.
The Contractor shall control dust from the site in accordance with Section 161 of the current edition of the
Department's Standard Specifications.
As soon as final grade has been established in any area of the project, install the following:
1. Permanent grassing
2. Slope stabilization
3. Storm drain outlet protection
Work in the final phase includes final grading and installation of permanent BMP's.
PHASE 3 - FINAL BMP'S
PHASE 2 - INTERMEDIATE BMP'S
PHASE 1 - INITIAL BMP'S
The following is a summary of the soils that are expected to be found on the project site:
Due to the size and scope of this project and the nature of soil series maps, it is not reasonably practical to delineate the precise locations of the above listed soils on the construction plans. The
NRCS soil survey and soil series maps for the project site are also available online at http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm.
Install the following prior to roadway construction:
1. Perimeter control silt fence
2. Construction Exit
3.Orange barrier fence
4. Apply temporary grassing and mulch as necessary to disturbed areas
5. Impervious dike
6.Dewatering pump
7. Geotextile dewatering dirt bag
Work in the remaining phases includes grading, overlay, full-depth pavement, and construction of the proposed double 5' x 5' reinforced concrete box culvert along Country Club Road
While earthwork and roadway paving are progressing, do the following:
1. Apply temporary grassing and mulch as necessary to disturbed areas
2. Mulch and plant temporary grass as required by the special provisions
3.Slope stabilization
4. Install riprap aprons and storm drain outlet protection
5. Fill slope embankment armoring
The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities.
Erosion control measures will be maintained at all times. If full implementation of the approved Plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source.
This Erosion, Sedimentation, and Pollution Control Plan (ES&PC Plan) is provided by the Department. It addresses the staged construction of the project on the basis of common construction methods and techniques. If the Contractor elects to alter the staged construction from that shown in the plans or utilize construction techniques that render this plan ineffective, the Contractor shall revise the plans in accordance to
Special Provision 161-Control of Soil Erosion and Sedimentation of the contract.
The Contractor, the Certified Design Professional, and the WECS shall carefully evaluate this plan prior to commencing land-disturbing activities. Admendments/revisions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional. Additional BMPs may be added per Special Provision 161-Control of Soil Erosion and Sedimentation.
The EPD General NPDES GAR100002 permit states that any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding. However in special cases, the Project
Engineer may require the contractor to perform stabilization more often than 14 days.
Disturbed areas shall be stabilized with suitable material listed in the current edition of the Department's
Standard Specifications (or Special Provisions) Sections 161, 163, 700, or 711 on the basis of when construction activities are expected to resume.
All temporary and permanent vegetative practices including plant species, planting dates, seeding, fertilizing, liming, and mulching rates for this project can be found in Section 700 of the current edition of the
Department's Standard Specifications (or Special Provisions) and other applicable contract documents or landscaping plans.
Where attainable, locate waste collection areas, dumpsters, trash cans and portable toilets at least 50 feet away from streets, gutters, watercourses and storm drains. Secondary containment shall be provided around liquid waste collection areas to minimize the likelihood of contaminated discharges. The Contractor shall comply with applicable state and local waste storage and disposal regulations and obtain all necessary permits. Waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit.
All permanent postconstruction BMPs are shown in the construction plans and in the ESPCP plan. The postconstruction BMPs for this project consist of vegetated swales/ditches, riprap, at pipe outlets for velocity dissipation and outlet stabilization, channel/ditch stabilization with turf reinforcing mats.
The site has a total disturbed area of 0.92 acres.
CHANNEL PROTECTION
The following table summarizes the required and available sediment storage for every outfall on this project. The Contractor shall provide and maintain the storage volumes for the BMP's specified in this table.
All channels may be stabilized exclusively with permanent grassing.
Outfall #1
The area drained is 10736 acres. The disturbed area within this drainage basin is 0.25 acres. The disturbance activities consist of pavement construction, grading, drainage, and construction of a double 5'x5' reinforced concrete box culvert. The BMPs shown on the erosion control plans provide 147.9 CY of the 719312
CY required for sediment storage within this basin. The outfall for this basin is an proposed double 5'x5' reinforced concrete box culvert along Country Club Road that drains in Wateringhole Branch Tributary. Due to the nature of this corridor, constructing a sediment basin would cause substaintial adverse impacts to adjacent wetlands and adjacent private property. Therefore a sediment basin is NOT recommended. Due to the size of the area draining to this outfall, it is not feasible to provide the required storage for the entire area drained without impacting adjacent wetlands. Therefore, in lieu of a sediment basin, BMPs have been shown on the plans to the fullest extent possible. The Contractor shall strictly adhere to the BMP maintenance requirements and shall establish vegetation on disturbed areas as soon as possible.
SEDIMENT STORAGE
Total Sheet Flow
Stormwater flowing over disturbed graded areas along the edges of the project and not collected into defined conveyances is defined as sheet flow into Wateringhole Branch Tributary. The area drained is 0.67 acres. The disturbed area within this drainage basin is 0.67 acres. The disturbance activities consist of pavement construction and grading. The BMPs shown on the erosion control plans provide 121.8 CY of the 45
CY required for sediment storage within this basin. Due to the nature of this corridor and substantial adverse impacts to adjacent wetlands, construction of a sediment basin is NOT recommended. Further, other BMPs can provide the required storage within the proposed limits of disturbance. Therefore, in lieu of a sediment basin, BMPs have been shown on the plans to the fullest extent possible. The Contractor shall strictly adhere to the
BMP maintenace requirements and shall establish vegetation on disturbed areas as soon as possible.
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
1/29/2026
Drew.Talley
GPLOT-ORD
7:18:54 PM
ESPCP GENERAL NOTES
51-0003
STATE-WATER BUFFER IMPACTS
RIPRAP OUTLET PROTECTION
State-water buffers, as defined by O.C.G.A. 12-7-1, are not impacted by this project.
Non-exempt activities shall not be conducted within the 25- or 50-foot undisturbed stream buffers as measured from the point wrested vegetation or within 25-feet of the coastal marshland buffer as measured from…