Counterfeit Prevention Plan CDRL.pdf

PDF 233 KB Posted

Attached to
Amplifier Federal contract opportunity
Solicitation number
SPRHA3-25-Q-0441
Issued by
Defense Logistics Agency Aviation

About this file

This is a Contract Data Requirements List (CDRL) Form DD 1423-1 for a Counterfeit Prevention Plan (CPP) under contract number FD20202500441 for an AN/FPQ-16 system. The CDRL requires the contractor to deliver a Counterfeit Prevention Plan that includes all items from section 3 of SAE AS5553 within 30 days of contract award. The government will provide comments within 14 days, with contractor re-submittal due 7 days after receiving comments.

The document must be submitted electronically in MS Office 2016 or newer format or PDF to the 415 SCMS/EN and 415 SCMS/GUEA offices at Hill AFB, Utah. The distribution is restricted to Department of Defense and U.S. DoD contractors only (Distribution Statement D). The document has no associated price (NSP - Not Separately Priced) and requires one draft copy and two final copies. The requiring office is 415 SCMS/GUEA, and the document was approved on 5/11/2022.

View the file

Other files for this federal contract opportunity

Other files attached to Amplifier, newest first.
File Type Posted
SPRHA325Q0441_0007 CUI SSI.pdf PDF
SPRHA325Q0441_0006 CUI SSI.pdf PDF
SPRHA325Q0441_0005 CUI SSI.pdf PDF
SPRHA325Q0441_0004 CUI SSI.pdf PDF
SPRHA325Q0441_0003 CUI SSI.pdf PDF
Engineering Change Proposal CDRL.pdf PDF
SPRHA325Q0441_0002 CUI SSI.pdf PDF
SPRHA325Q0441_0001 CUI SSI.pdf PDF
FA Test Report CDRL.pdf PDF
SPRHA325Q0441 CUI SSI.pdf PDF
Engineering Data List.pdf PDF
Engineering Data Requirements.pdf PDF
FA Test Plan CDRL.pdf PDF
Packaging Statement of Work.pdf PDF
Manufacturing Qualification Requirements.pdf PDF
Unmarked Eng Data.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

C MISC

AN/FPQ-16 FD20202500441

A005 Counterfeit Prevention Plan CPP

DI- MISC-81832 415 SCMS/GUEA

DD

A D

1TIME

N/A

30DAC

N/A

FY2073 1

415 SCMS/EN 1

415 SCMS/GUEA 1

0 1 2

Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.

Block 4: Plan shall include all items from section 3 of SAE AS5553.

Block 12: Contractor shall deliver the Counterfeit Prevention Plan within 30 days of contract award. Government comments provided to the contractor within 14 days after receipt, with contractor re-submittal due 7 days after receipt of comments.

Block 14: Document submission shall be made electronically using MS Office 2016 or newer format or Portable Document Format (PDF).

Address e-mail submissions to: USAF AFMC 415 SCMS/EN, 415SCMS.en@us.af.mil;

USAF AFMC 415 SCMS/GUEA, kendric.hornsby@us.af.mil

DODAAC: FY2073

Address Line 1: FY2073 GLSC 415 SCMS Address Line 2: BLDG 1226 CP 801 586 1368 Address Line 3: 6041 GUM LN Address Line 4: HILL AFB UT 84056-5820

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for administration and operational purposes, contains limited access information, 21 Nov 2008. Other requests for this document shall be referred to OO-ALC/ AFMC 415 SCMS/GUEA.

DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.

NSP

0.00

Engineer 415 SCMS/GUEA

HORNSBY.KENDRIC.R.13876115

Digitally signed by

HORNSBY.KENDRIC.R.1387611564

Date: 2024.12.19 07:25:12 -07'00'

12/19/2024 Jackson Andrasko 415 SCMS/GUEA

ANDRASKO.JACKSON.125

8051030

Digitally signed by

ANDRASKO.JACKSON.1258051030

Date: 2022.05.11 09:13:04 -06'00'

5/11/2022

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

C MISC

AN/FPQ-16 FD20202500441

File details come from the government source that posted it. Updated .