COST SCHEDULE~5.docx
DOCX document 14 KB Posted
- Solicitation number
- 70CNR-S2563
- Issued by
- Humboldt County, Nevada
About this file
The document provided is a cost schedule related to a Request for Proposals (RFP) issued by the State of Nevada Purchasing Division, on behalf of the Department of Conservation and Natural Resources, State Parks. The RFP is seeking proposals from qualified vendors to provide Historic Context and Historic Structure Reports for Three Ranches in Spring Valley State Park, located in Lyon County, Nevada. The scope of work includes kick-off and quarterly progress meetings, archival and physical research, survey (archaeology and architectural), condition assessment, development of a summary report, consultation with the State Historic Preservation Office, and delivery of a Statewide Outdoor Recreation Historic Context.
The cost schedule itemizes the tasks and associated costs for the project, with the total cost provided at the bottom. No other pricing terms, set asides, incumbents, funding requirements, or other salient information is included in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Proposed Staff Resume 2023-04-13~5.docx | DOCX document | |
| SpringValley - Ranches - Location - Map.pdf | ||
| 70CNR-S2563 - Historical Context and Historic Structure Reports~2 (1).docx | DOCX document | |
| Attachments for Signatures 2023-04-13~5.pdf | ||
| Quote Instructions.pdf | ||
| SCOPE OF WORK.docx | DOCX document | |
| Statewide Contract Form 8-3-23~1.pdf | ||
| INSURANCE SCHEDULE~7.docx | DOCX document | |
| LetterOfIntent~32.pdf | ||
| Reference Questionnaire 2023-04-13~4.docx | DOCX document | |
| Terms and Conditions for Services 2023-04-13~6.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST SCHEDULE
RFP 70CNR-S2563
Historic Context and Historic Structure Reports for Three Ranches in Spring Valley State Park
| Task |
| Cost |
1. Kick-off and quarterly progress meetings
1. Archival and Physical Research
1. Survey (Archaeology and Architectural)
1. Condition Assessment
1. Develop Summary Report
1. State Historic Preservation Office consultation
1. Delivery of Statewide Outdoor Recreation Historic Context
TOTAL COST
File details come from the government source that posted it. Updated .