Cost Schedule~1.xlsx
XLSX spreadsheet 74 KB Posted
- Attached to
- Rock and Mineral Exhibit Fabrication
- Solicitation number
- 50COMR-S2596
- Issued by
- Churchill County, Nevada
About this file
The provided document is a cost schedule for a state and local contract opportunity in Nevada related to the fabrication of a rock and mineral exhibit. The contract opportunity covers two jurisdictions within Carson City, Nevada. The cost schedule outlines the expected costs for various phases of the project, including reviewing the design, fabrication, shipping/delivery and installation, and the creation of a technical manual. The total cost for the project is provided.
The cost schedule indicates the specific tasks and deliverables required for each phase of the project, such as meeting with agency staff, fabrication of the exhibit, and providing a technical manual. The contract opportunity appears to be focused on the fabrication and installation of the rock and mineral exhibit, rather than the design or conceptual development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quote Instructions.pdf | ||
| RFP 50COMR-S2596 Rock and Mineral Exhibit Fabrication~1.docx | DOCX document | |
| Insurance Schedule S2596.pdf | ||
| Reference Questionnaire~1.docx | DOCX document | |
| Terms and Conditions for Services~2.pdf | ||
| Design File.pdf | ||
| S2596 LetterOfIntent.pdf | ||
| Terms and Conditions for Goods~1.pdf | ||
| Attachments for Signatures.pdf | ||
| Proposed Staff Resume~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ITEM COST NOTES
| Phase I - Review of design | The cost to meet with NDOM staff and review all design documents, ask questions and suggest modifications. |
| Phase II(a) - Fabrication | Raw materials, printing, labor, and other related costs of fabrication. |
| Phase II(b) - Shipping/Delivery & Installation | The cost to package, ship/deliver and install the display. |
| Phase III - Creation of a technical manual | The cost to create an electronic (PDF) technical manual as described in the Scope of Work. |
TOTAL
File details come from the government source that posted it. Updated .