Cost Schedule~1.xlsx

XLSX spreadsheet 74 KB Posted

Attached to
Rock and Mineral Exhibit Fabrication
Solicitation number
50COMR-S2596
Issued by
Churchill County, Nevada

About this file

The provided document is a cost schedule for a state and local contract opportunity in Nevada related to the fabrication of a rock and mineral exhibit. The contract opportunity covers two jurisdictions within Carson City, Nevada. The cost schedule outlines the expected costs for various phases of the project, including reviewing the design, fabrication, shipping/delivery and installation, and the creation of a technical manual. The total cost for the project is provided.

The cost schedule indicates the specific tasks and deliverables required for each phase of the project, such as meeting with agency staff, fabrication of the exhibit, and providing a technical manual. The contract opportunity appears to be focused on the fabrication and installation of the rock and mineral exhibit, rather than the design or conceptual development.

View the file

Other files

File Type Posted
Quote Instructions.pdf PDF
RFP 50COMR-S2596 Rock and Mineral Exhibit Fabrication~1.docx DOCX document
Insurance Schedule S2596.pdf PDF
Reference Questionnaire~1.docx DOCX document
Terms and Conditions for Services~2.pdf PDF
Design File.pdf PDF
S2596 LetterOfIntent.pdf PDF
Terms and Conditions for Goods~1.pdf PDF
Attachments for Signatures.pdf PDF
Proposed Staff Resume~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEM COST NOTES

Phase I - Review of designThe cost to meet with NDOM staff and review all design documents, ask questions and suggest modifications.
Phase II(a) - FabricationRaw materials, printing, labor, and other related costs of fabrication.
Phase II(b) - Shipping/Delivery & InstallationThe cost to package, ship/deliver and install the display.
Phase III - Creation of a technical manualThe cost to create an electronic (PDF) technical manual as described in the Scope of Work.

TOTAL

File details come from the government source that posted it. Updated .