About this file
This is a Cost Response Sheet for a Request for Quote (RFQ) issued by the State of Maine Office of Information Technology (OIT) for dark optical fiber service in Augusta, Maine. The solicitation seeks a lease/rental agreement for a dark/unmeasured optical fiber point-to-point connection linking two termination endpoints: the Maine OIT MDF at 45 Commerce Drive and the telecommunications room at 85 Leighton Road, both in Augusta. The service consists of four strands (two pairs) of 9/125 micron G.652D-compliant single-mode fiber suitable for outdoor aerial and underground applications. The contract term is five years with three one-year renewal options. The project must be completed within five weeks of agreement signature and approval, with preliminary construction work anticipated to be finished prior to service initiation. All fiber must be tested bidirectionally at both endpoint patch panels and meet industry-recognized tolerances including no more than 0.1 dB per splice point, 0.5 dB per connector mating point, and cable loss within manufacturer specifications. Testing will be conducted at 1310 nm and 1550 nm wavelengths using calibrated optical power meters and OTDR equipment, with final results provided in both PDF and trace files.
Bidders must provide a complete cost response table that includes any one-time startup fees and level annual service payments for each of the five service years, along with totals for one-time fees and all service fees combined. The State of Maine will initiate service and authorize first payments only after the fiber service has been tested and accepted by OIT. Vendor responsibilities include fiber maintenance and repair throughout the agreement term, documentation of a complete fiber splice map upon completion of splice work, and submission of project status reports. Bidders may utilize existing facilities at termination points if available or install new termination points using OIT-specified materials, including Corning splice enclosures and splice trays. Bidders must agree to all technical requirements, provide a detailed project statement of work with installation timeline and assumptions, attach an SLA for maintenance and support services, and demonstrate capability to achieve service readiness within 45 business days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HowtoSearchBidsandRespond.pdf | ||
| RFQ Specifications.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation for Dark Optical Fiber Service – Augusta, Maine
State of Maine/Office of Information Technology
Summary:
The State of Maine/Office of Information Technology (OIT) is issuing a Request for Quote (RFQ) for lease/rent of a dark/unmeasured optical fiber point-to-point connection in Augusta, Maine. The terminating endpoints for service are: A) The Maine OIT MDF at 45 Commerce Drive, Augusta, ME 04330 and Z) 85 Leighton Road, Telecommunications Room (MDF), Augusta. 5-year Service with 3 one-year renewal options. OIT seeks a “turnkey” solution where the fiber is tested and provided. Cost must include fiber maintenance/repair (as needed) over the term of the agreement.
General Technical Requirements:
The optical fiber cable plant will consist of 4 strands (2 pair) of 9/125 micron G.652D-compliant single-mode fiber, loose tube, rated for outdoor aerial and underground applications; whichever has most cost advantage for State of Maine.
The 85 Leighton Road endpoint shall be within Maine OIT’s designated MDF. The OSP optical fiber cable will be brought into the MDF room, with an adequate slack coil affixed to the backboard per OIT instructions. The end of the cable will then be dressed into the OIT-provided backboard-mounted splice enclosure and fusion-spliced to the OIT-installed interior optical fiber cable within the splice enclosure, using the OIT-provided splice trays. OIT will develop and implement fiber labeling at the terminating patch panels at each endpoint. The Vendor shall be responsible for documenting and providing a complete fiber splice map to OIT immediately upon completion of all splice work.
The OSP cable plant will be delivered in accordance with all applicable telecommunications industry standards and best practices, and in accordance with all applicable laws, regulations, codes and ordinances.
Once the cable build is complete and spliced, the Vendor will test all terminated fibers, bidirectionally, at the endpoint patch panels and correct all deficiencies in that portion of the cable plant installed by the Vendor. Once satisfactory test results on all terminated fibers have been completed, they will be submitted to OIT for review and determination of acceptance. Acceptable test results will be based upon industry recognized tolerances for cable, splice and connector losses. Typically, this will be no more than 0.1 dB per splice point, no more than 0.5 dB per connector mating point, and cable loss within manufacturer material specifications. Testing will be conducted using both calibrated optical power meter/light source and a calibrated OTDR at wavelengths of 1310 nm and 1550 nm. Final test results, including power meter and OTDR traces will be provided to the Customer in both individual .pdf and trace (*.trc/*.sor) files for each fiber.
The specific OIT provided and installed hardware and materials shall include:
· Rack-mounted optical fiber patch panel fitted with LC-APC connectors.
· Indoor-rated 9/125 micron single-mode optical fiber, tight-buffered, pre-terminated in the patch panel, dressed into the backboard-mounted splice enclosure and ready for final splice preparation and splicing by the Vendor. Backboard-mounted optical fiber splice enclosure will be a Corning #WSH-11SPT-F. Splice trays will be Corning #M67-076-C.
· Bidders may utilize existing facilities in at termination point is already in place or chose to install a new termination point.
· If facilities are already in place the bidder will test and label delivery fibers and termination points.
· If bidder must build the bidder will utilize the following materials:
· Rack-mounted optical fiber patch panel fitted with LC-APC connectors.
· Indoor-rated 9/125 micron single-mode optical fiber, tight-buffered, pre-terminated in the patch panel, dressed into the backboard-mounted splice enclosure and ready for final splice preparation and splicing by the Vendor. Backboard-mounted optical fiber splice enclosure will be a Corning #WSH-11SPT-F. Splice trays will be Corning #M67-076-C.
· The end of the cable will then be dressed into the OIT-provided backboard-mounted splice enclosure and fusion-spliced to the OIT-installed interior optical fiber cable within the splice enclosure, using the OIT-provided splice trays. OIT will develop and implement fiber labeling at the terminating patch panels at each endpoint. The Vendor shall be responsible for documenting and providing a complete fiber splice map to OIT immediately upon completion of all splice work.
It is anticipated that all non-disruptive preliminary construction and preparatory work will be completed prior to service initiation. The cable cut and splice date/time will be determined by OIT and coordinated with the Vendor.
Schedule:
Project must be completed within 5 weeks of agreement signature and approval. Bidder shall supply State of Maine project status reports.
Payment:
Vendor to identify any one-time start-up fees. Level annual (or quarterly/monthly) payments to vendor at beginning of each service-year. Initiation of service and first payment(s) will occur after fiber service is tested and accepted by the Department.
Bid Submission:
| Requirement |
| Bidder Agrees to Requirement (Yes or No) |
Dark fiber 4 Strand (two-pair) service with support provided per specifications
5-year level-cost dark fiber service with renewal options
Project statement of work and install timetable with any project assumptions/dependencies document attached
Install/service ready within 45-business days
SLA for maintenance/support/repair service attached
Cost table fully completed
Cost: Option 1: 4 Strand (2 Pair)
| One-time Fee, if-any: | ______________ | ||
| Year-1 Service Fee: | ______________ | ||
| Year-2 Service Fee: | ______________ | ||
| Year-3 Service Fee: | ______________ | ||
| Year-4 Service Fee: | ______________ | ||
| Year-5 Service Fee: | ______________ |
| Total One-time Fee | ___________ (enter value in cost response) | |
| Total All Service Fees: | ____________ (enter value in cost response) |
File details come from the government source that posted it. Updated .