About this file

This solicitation package describes a contract opportunity for construction services at the Biloxi National Cemetery in Biloxi, Mississippi. The scope of work includes columbaria burial expansion and road renovation services. The contractor will be responsible for site preparation, demolition, excavation, construction, and project closeout. The period of performance is 181 calendar days from notice to proceed. The contractor must follow all National Cemetery Administration standards for dignity, employee conduct, and operations. Safety data sheets must be provided for any hazardous materials. The selected contractor will be responsible for daily cleanup and off-site disposal of all debris in accordance with environmental regulations.

View the file

Other files

File Type Posted
Road Plans Part 1 _ Rev 1 06092022.pdf PDF
RFI Form.pdf PDF
Specifications _ Rev 1 06092022.pdf PDF
Columbaria Plans Part 4.pdf PDF
36C78622B0013_1.docx DOCX document
Columbaria Plans Part 2R1.pdf PDF
Columbaria Plans Part 3.pdf PDF
DOL DB Wage Determination _ Harrison County.pdf PDF
Columbaria Plans Part 1.pdf PDF
Road Plans Part 2.pdf PDF
Past Performance.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number:

Solicitation Number:

Project Title:

Division Unit of Measure # of Units Unit Cost $ Extended/Total

Cost $ Comments / Remarks Division 0 - Special Sections

General Conditions and Administration

JB 1

Division 01 - General Requirements

Mobilization JB 1

Division 02 - Existing Conditions

Site Investigation JB 1

Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Columbaria Burial Expansion and Road Renovation

Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

IFB Contractor Cost Estimate Worksheet

832CM3035

36C78622B0013

Offeror shall use and edit to fit Task Order Project

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal

General Construction Subtotal

Total Base Construction Cost

Insurance (if applicable)

Bonding (if applicable)

Overhead ________ % $0.00

Profit ________ % $0.00

GRAND TOTALS $

Sheet1