Cost Breakdown Form.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- Orrs Mill IRA Walkway Replacement
- Solicitation number
- 2098853
- Issued by
- Orange County, New York
About this file
This document is a Cost Breakdown Form related to a state and local contract opportunity for the Orrs Mill IRA Walkway Replacement project in Salisbury Mills, New York. The project is being managed by the New York State Office for People With Developmental Disabilities (OPWDD). The cost breakdown form requires vendors to provide detailed pricing information for materials, labor, equipment, and overhead and profit. The project will be awarded to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. A mandatory site visit is scheduled for June 12th or June 14th, 2023, and quotes must be submitted by June 23rd, 2023 at 12:30 PM. The awarded vendor must adhere to the project timeline and provide a 1-year warranty on materials and labor. Prevailing wage rates apply, and certified payroll records must be submitted with invoices. Subcontracting is not allowed for this project.
The contract is not designated as a Service-Disabled Veteran-Owned Set Aside. The contract will be awarded to the vendor whose bid was received earliest in the event of a tie. OPWDD reserves the right to reject any and all quotes. Payment is contingent on the submittal of certified payroll records. Vendors must demonstrate 2 years of relevant experience on prior projects of similar magnitude, subject to a vendor responsibility determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OrrsMillWalkwayWageSchedule.pdf | ||
| Prevailing Wage Schedule.pdf | ||
| Substitute W9 form.pdf | ||
| Orrs Mill Walkway Proposal Form.docx | DOCX document | |
| Scope of Work Drawing 1 of 1.pdf | ||
| Orrs mills SPEC-321313-ConcretePaving-MASTER (1).docx | DOCX document | |
| Orrs Mill Cost Breakdown Form.xlsx | XLSX spreadsheet | |
| RFQ Scope Scan.pdf | ||
| Orrs Mills Award Document.pdf | ||
| Lobbying All In One2565.pdf | ||
| Quote Proposal Form.docx | DOCX document | |
| Orrs Mill Walkway sketch.pdf | ||
| Standard Clauses for NYS Contracts.pdf | ||
| Concrete Scope.docx | DOCX document | |
| W9 Form2.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Vendor Cost Breakdown Form | |
| This form will serve as a cost breakdown of your proposed quote. It is broken down into three sections: materials, labor, overhead and profit. Please complete this form in its entirety. When entering the materials, be as descriptive as possible i.e; color, measurements, brand, etc. When entering labor titles and hourly rates, be sure to use the provided NYS DOL prevailing wage schedule to ensure it corresponds. Method of Award: This is an RFQ (request for quotes). This is not an IFB (bid). This project will be awarded to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Only quotes judged to be responsive to the submission requirements set forth in the invitation will be evaluated. OPWDD reserves the right to reject any and all quotes. |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Read carefully.
Project Title: Orrs Mill IRA Walkway Replacement Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the CR list number and project name.
Project Location: 127 Orrs Mill Rd, Salisbury Mills, NY 12577 Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the address where the project is located.
| Vendor Name: | FEIN ID: |
| Name of person submitting quote: |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter the first and last name of the person submitting the quote. | Contact email: | ||||||
| DWG. # | Description | Quantity | Calc. | Unit | Cost of Material | Total Cost of Materials |
| Materials |
| 1 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter materials here. | 1 | $ - 0 | $ - 0 | |||
| 2 | 1 | $ - 0 | $ - 0 | |||
| 3 | 1 | $ - 0 | $ - 0 | |||
| 4 | 1 | $ - 0 | $ - 0 | |||
| 5 | 1 | $ - 0 | $ - 0 | |||
| 6 | $ - 0 | $ - 0 | ||||
| 7 | $ - 0 | $ - 0 | ||||
| 8 | $ - 0 | $ - 0 | ||||
| 9 | $ - 0 | $ - 0 | ||||
| Subtotal Materials | $ - 0 |
| Description | Quantity | Cost of Equipment | Total Cost of Equipment | |
| Equipment | ||||
| 2,5/A301, 1/A302 | 1 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter equipment here. | $ - 0 | $ - 0 | ||||
| 2,5/A301, 1/A302 | 2 | $ - 0 | $ - 0 | |||
| 2,5/A301, 1/A302 | 3 | $ - 0 | $ - 0 | |||
| 2,5/A301, 1/A302 | 4 | $ - 0 | $ - 0 | |||
| Subtotal Equipment | $ - 0 |
| Description | Number of Hours | Base Pay Rate Per Hour | Total Pay | |
| Labor | ||||
| 7/A301 | 1 |
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter labor title/s as per NYS DOL prevailing wage schedule provided.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Read carefully.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the CR list number and project name.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the address where the project is located.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your company name.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter the first and last name of the person submitting the quote.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter equipment here.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your FEIN ID number.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
Enter your email address.
Jones, Katrina (OPWDD): Jones, Katrina (OPWDD):
| Enter materials here. | $ - 0 | $ - 0 | ||||
| 7/A301 | 2 | $ - 0 | $ - 0 | |||
| 7/A301 | 3 | $ - 0 | $ - 0 | |||
| 3,6, 7/A301 | 4 | $ - 0 | $ - 0 | |||
| 5 | $ - 0 | $ - 0 | ||||
| 6 | $ - 0 | $ - 0 | ||||
| 7 | $ - 0 | $ - 0 | ||||
| 2/A301, 1/A302 | 8 | $ - 0 | $ - 0 | |||
| 7/A301 | 9 | $ - 0 | $ - 0 | |||
| 6, 8/A301 | 10 | $ - 0 | $ - 0 | |||
| Subtotal Labor | $ - 0 |
| Description | Cost of OH & P | Total OH & P |
| Overhead & Profit | ||
| 1 Overhead/Profit | $ - 0 | $ - 0 |
| 2 | $ - 0 | $ - 0 |
Subtotal OH & P $ - 0
TOTAL $ - 0
File details come from the government source that posted it. Updated .