Cost Breakdown.pdf

PDF 145 KB Posted

Attached to
Menlo Park Replace Nurse Call Bldg. 331 and 360
Solicitation number
36C26123Q1239
Issued by

About this file

This document provides a cost breakdown template for a project to replace nurse call systems in Buildings 331 and 360 at the Menlo Park Veterans Affairs Medical Center. The cost breakdown template includes line items for general requirements, drawings, schedules, shop drawings, safety requirements, temporary environmental controls, construction waste management, demolition, painting, electrical and communications installation requirements, grounding and bonding, raceways and boxes, commissioning, control and signal wiring, and the nurse call systems. It also includes lines for overhead costs, profit, and the total project bid amount. The related federal contract opportunity is solicitation number 36C26123Q1239 from the Department of Veterans Affairs Veterans Health Administration VISN 21 to replace the nurse call systems at the specified buildings at the Menlo Park location.

View the file

Other files

File Type Posted
Wage Determination San Mateo.pdf PDF
36C26124R0009.pdf PDF
ICRA MPD Nurse Call Replacement_ complete.pdf PDF
000000 Specs Merged NEW.pdf PDF
S02 - RFI FORM.docx DOCX document
NURSE CALL_MERGED SET.pdf PDF
PER VHA DIRECTIVE 7715 EMR.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISIONAL COST BREAK-OUT

Menlo Park Nurse Call System

CLIN 0001

Provide complete Divisional Cost Break-Out for complete project. If necessary, add additional lines for each Division applicable to this project.

REF DESCRIPTION TOTAL

01 01 15 List of Drawing Sheets $ 01 00 00 General Requirements $

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build

01 33 23 Shop Drawings, Product Data, and Samples $ 01 35 26 Safety Requirements 01 57 19 Temporary Environmental Controls 01 74 19 Construction Waste Management 02 41 00 Demolition 09 91 00 Painting 26 05 11 Requirements for Electrical Installations 26 05 19 Low-Voltage Electrical Power Conductors and

Cables

26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications

Systems

27 05 33 Raceways and Boxes for Communications Systems

27 08 00 Commissioning of Communications Systems 27 10 00 Control, Communication and Signal Wiring 27 52 23 Nurse Call and Code Blue Systems

OTHER

OTHER $

SUB TOTAL:

OVERHEAD

PROFIT

TOTAL PROJECT BID AMOUNT:

DIVISIONAL COST BREAK-OUT

File details come from the government source that posted it. Updated .