Cost_and_Price_Analysis_Form.pdf
PDF 52 KB Posted
- Attached to
- Water Quality Surveillance and Response System
- Solicitation number
- 114580
- Issued by
- Prince George's County, Maryland
About this file
This is a Cost and Price Analysis Form document issued by the Washington Suburban Sanitary Commission (WSSC) in Maryland, designed to standardize contractor cost submissions for work performed under WSSC contracts. The form is completed by contractors submitting estimates or final/partial costs for completed projects and must be submitted in accordance with specific WSSC contracting procedures. The form requires detailed breakdowns of labor rates, materials costs, and equipment costs, with all rates designated as all-inclusive. Contractors must provide general descriptions of materials and equipment with itemized invoices and receipts attached as supporting documentation. The form includes fields for project identification information, facility details, calendar days for project completion, and signature lines for contractor authorization, inspector verification, and supervisor approval.
The Cost and Price Analysis Form functions as a standardized template with designated sections for calculating total costs across three primary categories (labor, materials, and equipment) that aggregate to a grand total. Contractors must indicate whether the submission represents a maximum estimate, partial cost, or final cost for the project. The form requires completion of all applicable fields and includes approval sections with space for inspector and supervisor initials and an approval date. While this particular document is a blank template rather than a completed submission, it establishes the documentation and pricing transparency requirements that WSSC contractors must follow when bidding on projects such as the Water Quality Surveillance and Response System, a consulting contract related to drinking water contamination preparedness and response programs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASHINGTON SUBURBAN SANITARY COMMISSION
COST AND PRICE ANALYSIS
This form is to be completed by contractors providing an estimate on work in accordance with a WSSC contract and when submitting final or partial costs for a completed project. Questions on the use of this form should be referred to the Procurement Director.
Facility Name:
Building Name:
Hours: Cost:
A = -$
B= -$
C= -$
4. Total Costs: A + B + C = -$
Complete the following using additional pages, it necessary. Rates all Inclusive.
Inspector’s Initials: Supervisor's Initials: 5. GRAND TOTAL
(Total Costs) -$ Approval Date: Date:
Rate/Hours:
3. Equipment Cost (provide general description and attach itemized invoice and receipts):
1. Labor Rate
Service Rate
2. Materials Cost (provide general description here and attach itemized invoice):
WSSC
Project No.:
Name and Address of Contractor:
PO#:
Account No.:
No. of Calendar Days for Completion after No. of Calendar Days for
Completion afterProject Description:
Circle One: Max. Estimate or Partial Cost or Final Cost
Contractor’s Signature and Date:
File details come from the government source that posted it. Updated .