Copy of D.1 Locations - Qty - Pricing Breakdown.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- NIHCS Floor Mat Services Federal contract opportunity
- Solicitation number
- 36C25026Q0016
About this file
This document is a detailed pricing breakdown spreadsheet for floor mat services across multiple Veterans Affairs (VA) medical facilities in Northern Indiana. The solicitation (36C25026Q0016) covers floor mat services for seven different locations: Fort Wayne, Marion, Muncie, Peru, Huntington, Jackie Walorski VA Clinic, and Defiance VA Clinic. The contract is structured with a base year (11/1/2025 - 10/31/2026) and four option years, with each location having specific mat requirements such as size (ranging from 3x5 to 4x10), mat types (Slate Gray, Logo Mat, Water Hog, Rubber Slip Resistant), and placement at various entrances, lobbies, and building access points.
The pricing template shows consistent parameters across all locations, with each mat to be exchanged 26 times per year. Interestingly, all current unit costs and total costs are listed as $0, which suggests this is a pricing template awaiting actual cost input. The contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10, covering floor mat services for multiple healthcare facilities. The comprehensive spreadsheet provides granular details on mat quantities, locations, and exchange frequencies for each facility, indicating a structured approach to maintaining cleanliness and safety at VA medical centers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25026Q0016 0001.pdf | ||
| 36C25026Q0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Totals Tab Northern Indiana Health Care System - Floor Mat - Totals
| Base Year | |
| CLIN 0001 - Fort Wayne | $ - 0 |
| CLIN 0002 - Marion | $ - 0 |
| CLIN 0003 - Muncie | $ - 0 |
| CLIN 0004 - Peru | $ - 0 |
| CLIN 0005 - Huntington | $ - 0 |
| CLIN 0006 - Jackie Walorski VA Clinic | $ - 0 |
| CLIN 0007 - Defiance | $ - 0 |
| Total Estimated Base Year | $ - 0 |
| Option Year 1 | |
| CLIN 1001 - Fort Wayne | $ - 0 |
| CLIN 1002 - Marion | $ - 0 |
| CLIN 1003 - Muncie | $ - 0 |
| CLIN 1004 - Peru | $ - 0 |
| CLIN 1005 - Huntington | $ - 0 |
| CLIN 1006 - Jackie Walorski VA Clinic | $ - 0 |
| CLIN 1007 - Defiance | $ - 0 |
| Total Estimated Option Year 1 | $ - 0 |
| Option Year 2 | |
| CLIN 2001 - Fort Wayne | $ - 0 |
| CLIN 2002 - Marion | $ - 0 |
| CLIN 2003 - Muncie | $ - 0 |
| CLIN 2004 - Peru | $ - 0 |
| CLIN 2005 - Huntington | $ - 0 |
| CLIN 2006 - Jackie Walorski VA Clinic | $ - 0 |
| CLIN 2007 - Defiance | $ - 0 |
| Total Estimated Option Year 2 | $ - 0 |
| Option Year 3 | |
| CLIN 3001 - Fort Wayne | $ - 0 |
| CLIN 3002 - Marion | $ - 0 |
| CLIN 3003 - Muncie | $ - 0 |
| CLIN 3004 - Peru | $ - 0 |
| CLIN 3005 - Huntington | $ - 0 |
| CLIN 3006 - Jackie Walorski VA Clinic | $ - 0 |
| CLIN 3007 - Defiance | $ - 0 |
| Total Estimated Option Year 3 | $ - 0 |
| Option Year 4 | |
| CLIN 4001 - Fort Wayne | $ - 0 |
| CLIN 4002 - Marion | $ - 0 |
| CLIN 4003 - Muncie | $ - 0 |
| CLIN 4004 - Peru | $ - 0 |
| CLIN 4005 - Huntington | $ - 0 |
| CLIN 4006 - Jackie Walorski VA Clinic | $ - 0 |
| CLIN 4007 - Defiance | $ - 0 |
| Total Estimated Option Year 4 | $ - 0 |
| Total Estimated Base Year | $ - 0 |
| Total Estimated Option Year 1 | $ - 0 |
| Total Estimated Option Year 2 | $ - 0 |
| Total Estimated Option Year 3 | $ - 0 |
| Total Estimated Option Year 4 | $ - 0 |
| Aggregate Estimated Contract Total | $ - 0 |
FT Wayne Campus
| Fort Wayne Campus - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0001 | 1 Basement | West End outside of EMS | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 Basement | Stair 2 South Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | next to ramp by stair 4 | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Dock | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 -1st Floor | Stair 21 | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 -1st Floor | West Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 -1st Floor | West Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | West North | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | West North | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Lobby Check In | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 North | By Auditorium | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 North | By Auditorium | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 North | By Auditorium | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Main Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Main Entrance | 4x6 Logo Mat | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Main Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Ambulance Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Ambulance Entrance | 4x6 Slate Gray Suction Cup | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 6 | Front/Back Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 3 | Lobby | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 3 | Hallway | 4x6 Slate Gray | 6 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | T4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | T5 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | T6 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 17 | MRI | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | Kitchen Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 2 | Boiler Plant | 4x6 Slate Gray | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 8 | Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 8 | Rear Entrance | 3x10 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 5 | Front Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 5 | Back Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0001 | 1 | PACT | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1001 | 1 Basement | West End outside of EMS | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 Basement | Stair 2 South Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | next to ramp by stair 4 | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Dock | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 -1st Floor | Stair 21 | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 -1st Floor | West Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 -1st Floor | West Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | West North | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | West North | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Lobby Check In | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 North | By Auditorium | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 North | By Auditorium | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 North | By Auditorium | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Main Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Main Entrance | 4x6 Logo Mat | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Main Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Ambulance Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Ambulance Entrance | 4x6 Slate Gray Suction Cup | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 6 | Front/Back Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 3 | Lobby | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 3 | Hallway | 4x6 Slate Gray | 6 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | T4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | T5 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | T6 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 17 | MRI | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | Kitchen Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 2 | Boiler Plant | 4x6 Slate Gray | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 8 | Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 8 | Rear Entrance | 3x10 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 5 | Front Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 5 | Back Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1001 | 1 | PACT | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 | ||||||||
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2001 | 1 Basement | West End outside of EMS | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 Basement | Stair 2 South Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | next to ramp by stair 4 | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Dock | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 -1st Floor | Stair 21 | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 -1st Floor | West Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 -1st Floor | West Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | West North | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | West North | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Lobby Check In | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 North | By Auditorium | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 North | By Auditorium | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 North | By Auditorium | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Main Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Main Entrance | 4x6 Logo Mat | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Main Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Ambulance Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Ambulance Entrance | 4x6 Slate Gray Suction Cup | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 6 | Front/Back Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 3 | Lobby | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 3 | Hallway | 4x6 Slate Gray | 6 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | T4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | T5 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | T6 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 17 | MRI | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | Kitchen Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 2 | Boiler Plant | 4x6 Slate Gray | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 8 | Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 8 | Rear Entrance | 3x10 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 5 | Front Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 5 | Back Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2001 | 1 | PACT | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 | ||||||||
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3001 | 1 Basement | West End outside of EMS | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 Basement | Stair 2 South Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | next to ramp by stair 4 | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Dock | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 -1st Floor | Stair 21 | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 -1st Floor | West Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 -1st Floor | West Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | West North | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | West North | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Lobby Check In | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 North | By Auditorium | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 North | By Auditorium | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 North | By Auditorium | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Main Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Main Entrance | 4x6 Logo Mat | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Main Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Ambulance Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Ambulance Entrance | 4x6 Slate Gray Suction Cup | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 6 | Front/Back Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 3 | Lobby | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 3 | Hallway | 4x6 Slate Gray | 6 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | T4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | T5 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | T6 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 17 | MRI | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | Kitchen Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 2 | Boiler Plant | 4x6 Slate Gray | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 8 | Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 8 | Rear Entrance | 3x10 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 5 | Front Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 5 | Back Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3001 | 1 | PACT | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 | ||||||||
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4001 | 1 Basement | West End outside of EMS | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 Basement | Stair 2 South Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 Basement | East Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | next to ramp by stair 4 | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Dock | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 -1st Floor | Stair 21 | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 -1st Floor | West Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 -1st Floor | West Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | West North | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | West North | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Lobby Check In | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 North | By Auditorium | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 North | By Auditorium | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 North | By Auditorium | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Main Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Main Entrance | 4x6 Logo Mat | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Main Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Ambulance Entrance | 4x6 Water Hog | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Ambulance Entrance | 4x6 Slate Gray Suction Cup | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 6 | Front/Back Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 3 | Lobby | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 3 | Hallway | 4x6 Slate Gray | 6 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | T4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | T5 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | T6 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 17 | MRI | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 4 | Entrances | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | Kitchen Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 2 | Boiler Plant | 4x6 Slate Gray | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 8 | Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 8 | Rear Entrance | 3x10 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 5 | Front Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 5 | Back Entrance | 3x5 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4001 | 1 | PACT | 4x6 Slate Gray | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
Marion Campus
| Marion Campus - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0002 | 2 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 2 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 2 | Handy Cap Ramp | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 2 | North Stairwell | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 5 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 5 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 6 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 6 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 15 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 16 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 17 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 17 | Handicap Ramp | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 52 | Front Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 52 | East Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 52 | South Door | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 52 | South Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 65 | Front Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 65 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 65 | Catholic Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 65 | West Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 65 | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 79 | North Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 79 | South Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 124 | Front Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 124 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 138 | Front Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 138 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 138 | By Service Elevators | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 170 | Front Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 170 | East Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 170 | West Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 170 | Garage Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172 | South Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172 | South Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172 | North Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172 | North Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172 | South Long Hall | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 172-174 | Long Hall | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 174 | Dock Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 174 | West Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 174 | East Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 174 | N&FS Kitchen Enterance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 185 | Front Enterance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 185 | Front Enterance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 185 | Canteen | 3x10 B Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 185 | Canteen Pop Machine | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0002 | 185 | Back Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1002 | 2 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 2 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 2 | Handy Cap Ramp | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 2 | North Stairwell | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 5 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 5 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 6 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 6 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 15 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 16 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 17 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 17 | Handicap Ramp | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 52 | Front Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 52 | East Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 52 | South Door | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 52 | South Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 65 | Front Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 65 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 65 | Catholic Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 65 | West Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 65 | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 79 | North Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 79 | South Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 124 | Front Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 124 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 138 | Front Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 138 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 138 | By Service Elevators | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 170 | Front Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 170 | East Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 170 | West Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 170 | Garage Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172 | South Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172 | South Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172 | North Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172 | North Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172 | South Long Hall | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 172-174 | Long Hall | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 174 | Dock Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 174 | West Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 174 | East Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 174 | N&FS Kitchen Enterance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 185 | Front Enterance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 185 | Front Enterance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 185 | Canteen | 3x10 B Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 185 | Canteen Pop Machine | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1002 | 185 | Back Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
tc={E39F972E-AB2D-4450-B1B3-1E45DEB82BE6}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| by Main Enterance | Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year | |
| 2002 | 2 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 2 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 2 | Handy Cap Ramp | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 2 | North Stairwell | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 5 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 5 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 6 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 6 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 15 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 16 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 17 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 17 | Handicap Ramp | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 52 | Front Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 52 | East Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 52 | South Door | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 52 | South Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 65 | Front Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 65 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 65 | Catholic Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 65 | West Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 65 | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 79 | North Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 79 | South Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 124 | Front Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 124 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 138 | Front Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 138 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 138 | By Service Elevators | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 170 | Front Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 170 | East Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 170 | West Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 170 | Garage Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172 | South Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172 | South Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172 | North Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172 | North Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172 | South Long Hall | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 172-174 | Long Hall | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 174 | Dock Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 174 | West Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 174 | East Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 174 | N&FS Kitchen Enterance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 185 | Front Enterance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 185 | Front Enterance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 185 | Canteen | 3x10 B Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 185 | Canteen Pop Machine | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| 2002 | 185 | Back Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 | |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3002 | 2 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 2 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 2 | Handy Cap Ramp | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 2 | North Stairwell | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 5 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 5 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 6 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 6 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 15 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 16 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 17 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 17 | Handicap Ramp | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 52 | Front Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 52 | East Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 52 | South Door | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 52 | South Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 65 | Front Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 65 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 65 | Catholic Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 65 | West Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 65 | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 79 | North Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 79 | South Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 124 | Front Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 124 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 138 | Front Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 138 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 138 | By Service Elevators | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 170 | Front Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 170 | East Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 170 | West Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 170 | Garage Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172 | South Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172 | South Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172 | North Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172 | North Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172 | South Long Hall | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 172-174 | Long Hall | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 174 | Dock Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 174 | West Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 174 | East Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 174 | N&FS Kitchen Enterance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 185 | Front Enterance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 185 | Front Enterance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 185 | Canteen | 3x10 B Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 185 | Canteen Pop Machine | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3002 | 185 | Back Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4002 | 2 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 2 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 2 | Handy Cap Ramp | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 2 | North Stairwell | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 5 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 5 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 6 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 6 | Back Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 15 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 16 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 17 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 17 | Handicap Ramp | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 52 | Front Entrance | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 52 | East Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 52 | South Door | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 52 | South Door | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 65 | Front Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 65 | Front Entrance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 65 | Catholic Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 65 | West Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 65 | East Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 79 | North Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 79 | South Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 124 | Front Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 124 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 138 | Front Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 138 | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 138 | By Service Elevators | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 170 | Front Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 170 | East Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 170 | West Back Entrance | 3x5 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 170 | Garage Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172 | South Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172 | South Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172 | North Attrium Entrance | 4x10 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172 | North Attrium Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172 | South Long Hall | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 172-174 | Long Hall | 4x6 Slate Gray Suction Cup | 4 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 174 | Dock Entrance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 174 | West Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 174 | East Lobby Entrance | 4x6 Slate Gray Suction Cup | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 174 | N&FS Kitchen Enterance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 185 | Front Enterance | 3x10 A Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 185 | Front Enterance | 4x6 Slate Gray Suction Cup | 2 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 185 | Canteen | 3x10 B Style Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 185 | Canteen Pop Machine | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4002 | 185 | Back Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
by Main Enterance
Muncie VA Clinic
| Muncie VA Clinic - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0003 | Muncie CBOC | Out Side Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0003 | Muncie CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0003 | Muncie CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1003 | Muncie CBOC | Out Side Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1003 | Muncie CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1003 | Muncie CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 |
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2003 | Muncie CBOC | Out Side Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2003 | Muncie CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2003 | Muncie CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3003 | Muncie CBOC | Out Side Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3003 | Muncie CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3003 | Muncie CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4003 | Muncie CBOC | Out Side Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4003 | Muncie CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4003 | Muncie CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
Peru VA Clinic
| Peru VA Clinic - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0004 | Peru CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0004 | Peru CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0004 | Peru CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1004 | Peru CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1004 | Peru CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1004 | Peru CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 |
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2004 | Peru CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2004 | Peru CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2004 | Peru CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3004 | Peru CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3004 | Peru CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3004 | Peru CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4004 | Peru CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4004 | Peru CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4004 | Peru CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
Huntington VA Clinic
| Huntington VA Clinic - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0005 | Huntington CBOC | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1005 | Huntington CBOC | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 |
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2005 | Huntington CBOC | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3005 | Huntington CBOC | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4005 | Huntington CBOC | Front Entrance | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
Jackie Walorski VA Clinic
| Jackie Walorski VA Clinic - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0006 | JWC CBOC | East Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0006 | JWC CBOC | North Entrance (Radiology) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0006 | JWC CBOC | North Entrance (Employee) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0006 | JWC CBOC | North Entrance (Employee) | 3x10 Slate Gray | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0006 | JWC CBOC | Warehouse Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1006 | JWC CBOC | East Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1006 | JWC CBOC | North Entrance (Radiology) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1006 | JWC CBOC | North Entrance (Employee) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1006 | JWC CBOC | North Entrance (Employee) | 3x10 Slate Gray | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1006 | JWC CBOC | Warehouse Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 |
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2006 | JWC CBOC | East Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2006 | JWC CBOC | North Entrance (Radiology) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2006 | JWC CBOC | North Entrance (Employee) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2006 | JWC CBOC | North Entrance (Employee) | 3x10 Slate Gray | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2006 | JWC CBOC | Warehouse Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3006 | JWC CBOC | East Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3006 | JWC CBOC | North Entrance (Radiology) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3006 | JWC CBOC | North Entrance (Employee) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3006 | JWC CBOC | North Entrance (Employee) | 3x10 Slate Gray | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3006 | JWC CBOC | Warehouse Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4006 | JWC CBOC | East Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4006 | JWC CBOC | North Entrance (Radiology) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4006 | JWC CBOC | North Entrance (Employee) | 4x6 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4006 | JWC CBOC | North Entrance (Employee) | 3x10 Slate Gray | 3 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4006 | JWC CBOC | Warehouse Entrance | 3x10 Slate Gray | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
Defiance VA Clinic
| Defiance VA Clinic - Price Schedule Breakdown & Pricing | |||||||||
| Base Year POP: 11/1/2025 - 10/31/2026 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 0007 | Defiance CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0007 | Defiance CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 0007 | Defiance CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Base Year Total | $ - 0 |
| Option Year 1 POP: 11/1/2026 - 10/31/2027 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 1007 | Defiance CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1007 | Defiance CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 1007 | Defiance CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 1 Total | $ - 0 |
| Option Year 2 POP: 11/1/2027 - 10/31/2028 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 2007 | Defiance CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2007 | Defiance CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 2007 | Defiance CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 2 Total | $ - 0 |
| Option Year 3 POP: 11/1/2028 - 10/31/2029 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 3007 | Defiance CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3007 | Defiance CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 3007 | Defiance CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 3 Total | $ - 0 |
| Option Year 4 POP: 11/1/2029 - 10/31/2030 | |||||||||
| CLIN | Building # | Location | Mat Description | Quantity | Unit | Cost Per Unit | Total Cost Per Exchange | Estimated Number of Exchanges Per Year | Estimated Cost Per Year |
| 4007 | Defiance CBOC | Outside Front Entrance | 3x5 Rubber Slip Resistant | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4007 | Defiance CBOC | Front Entrance Breeze Way | 4x6 Logo Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| 4007 | Defiance CBOC | Front Entrance | 3x5 Slate Gray Mat | 1 | Each | $ - 0 | $ - 0 | 26 | $ - 0 |
| Estimated Option Year 4 Total | $ - 0 |
File details come from the government source that posted it. Updated .