Contractor Information Form.docx
DOCX document 25 KB Posted
- Solicitation number
- N4008521R2516
About this file
This sources sought notice requests capability statements from small businesses for the construction of a two-story aircraft maintenance hangar at Marine Corps Air Station Cherry Point in North Carolina. The project includes construction of a high bay space, crew and equipment space, and administrative space built with concrete masonry, structural steel, and an insulated metal roof. Relevant experience must include new construction of an aircraft maintenance hangar with a final cost over $150 million and experience with parking garages, sequencing, and phasing. Interested firms should submit capability statements and past project descriptions using the provided forms by 15:00 EST on 10 November 2020. The Navy will review responses to determine if a small business set-aside is appropriate prior to soliciting proposals for award of a construction contract in December 2018.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought P197.docx | DOCX document | |
| Project Matrix.xlsx | XLSX spreadsheet | |
| Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – CONTRACTOR INFORMATION FORM
Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.
| 1. Contractor Information: |
| DUNS: |
| CAGE Code: |
| Firm Name: |
| Address: |
| Name of POC for firm: |
| Phone Number of POC: |
| Email of POC: |
2. Type of Business: (check all that apply)
| |_| SBA certified 8(a) firm |
| |_| SBA certified HUBZone Small Business |
|_| Service-Disabled Veteran-Owned Small Business
|_| Veteran Owned Small Business
|_| Woman Owned Small Business
|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business
3. Bonding Capacity:
| Surety Name: |
| Maximum bonding capacity per project: |
| $ |
| Aggregate maximum bonding capacity: |
| $ |
4. This space may be used to provide any additional information to clarify the above items only:
Please DO NOT change content of the form
File details come from the government source that posted it. Updated .