Contractor Information Form.docx
DOCX document 25 KB Posted
- Solicitation number
- N4008523R2529
About this file
This document contains a sources sought notice from the Department of the Navy Naval Facilities Engineering Command for design-bid-build construction services. The notice seeks information from small businesses capable of performing construction of five new Type-D earth-covered high explosive magazines at the Naval Weapons Station Yorktown in Virginia. The total estimated value of construction is between $25-100 million, with an anticipated award date of August 2023. Interested contractors must submit capability statements by November 17th, 2022 including a Contractor Information Form, construction experience on relevant magazine, roadway, and demolition projects, and evidence of a minimum $25 million aggregate bonding capacity. The primary NAICS code is 237990 for heavy and civil engineering construction. Responses will be used to determine if the requirement can be set aside for small businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008523R2529 P170 Source Sought Notice.pdf | ||
| Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – CONTRACTOR INFORMATION FORM
Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.
| 1. Contractor Information: |
| DUNS: |
| CAGE Code: |
| Firm Name: |
| Address: |
| Name of POC for firm: |
| Phone Number of POC: |
| Email of POC: |
2. Type of Business: (check all that apply)
| |_| SBA certified 8(a) firm |
| |_| SBA certified HUBZone Small Business |
|_| Service-Disabled Veteran-Owned Small Business
|_| Veteran Owned Small Business
|_| Woman Owned Small Business
|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business
3. Bonding Capacity:
| Surety Name: |
| Maximum bonding capacity per project: |
| $ |
| Aggregate maximum bonding capacity: |
| $ |
4. This space may be used to provide any additional information to clarify the above items only:
Please DO NOT change content of the form
File details come from the government source that posted it. Updated .