This document is a Sources Sought notice for a Design Build project to construct a Parachute Maintenance Facility with Paraloft, and a Supply Warehouse for the 2nd Radio Battalion at Camp Lejeune, North Carolina. The total construction cost is estimated between $10-$25 million. The Naval Facilities Engineering Command (NAVFAC), Mid-Atlantic is seeking eligible small businesses, including SBA certified 8(a) firms, HUBZone, service-disabled veteran-owned, veteran-owned, women-owned, and economically disadvantaged women-owned small businesses. Interested firms must submit a contractor information form, project information form, and project matrix demonstrating relevant experience on similar construction projects over $5 million and 10,000 SF within the past 10 years. Responses are due by December 2, 2024. Based on the industry response, the government will determine if a set-aside acquisition is in its best interest. If set-aside, the contract will include the limitation on subcontracting requirement.

View the file

Other files

File Type Posted
Project_Information_Form.docx DOCX document
Sources Sought Notice P-1458 Parachute and Supply Facilities 20241028 (002).docx DOCX document
Project Matrix Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – CONTRACTOR INFORMATION FORM

Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.

1. Contractor Information:
DUNS:
CAGE Code:
Firm Name:
Address:
Name of POC for firm:
Phone Number of POC:
Email of POC:

2. Type of Business: (check all that apply)

|_| SBA certified 8(a) firm
|_| SBA certified HUBZone Small Business

|_| Service-Disabled Veteran-Owned Small Business

|_| Veteran Owned Small Business

|_| Woman Owned Small Business

|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business

3. Bonding Capacity:

Surety Name:
Maximum bonding capacity per project:
$
Aggregate maximum bonding capacity:
$

4. This space may be used to provide any additional information to clarify the above items only: