Contractor_Information_Form.docx
DOCX document 21 KB Posted
- Solicitation number
- N40085-19-R-9146
About this file
This document provides details on a sources sought notice for road construction and repair services. The Naval Facilities Engineering Command, Mid-Atlantic is seeking small businesses capable of performing design-bid-build services for Birch Street and Duncan Street road improvements at Marine Corps Base Camp Lejeune in North Carolina. Work includes road widening, turn lane construction, roadbed rebuilding, milling and paving, utility and drainage installation, and demolition of existing infrastructure. Interested contractors should submit capabilities statements and past project descriptions using the included templates by March 13, 2020. The response will be evaluated to determine if the procurement should be set aside for small businesses prior to solicitation of the project, which is estimated to be awarded in May 2020 with a construction cost between $5 million to $10 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Matrix 19R9146.xlsx | XLSX spreadsheet | |
| Sources_Sought_Project_Information_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – CONTRACTOR INFORMATION FORM
Use this form to provide contractor’s general information. Please limit response to one page. The box at the bottom of this form may be used to clarify any requested information.
| 1. Contractor Information: |
| DUNS: |
| CAGE Code: |
| Firm Name: |
| Address: |
| Name of POC for firm: |
| Phone Number of POC: |
| Email of POC: |
2. Type of Business: (check all that apply)
| |_| SBA certified 8(a) firm |
| |_| SBA certified HUBZone Small Business |
|_| Service-Disabled Veteran-Owned Small Business
|_| Veteran Owned Small Business
|_| Woman Owned Small Business
|_| Economically Disadvantaged Women-Owned |_| Small Business Small Business
3. Bonding Capacity:
| Surety Name: |
| Maximum bonding capacity per project: |
| $ |
| Aggregate maximum bonding capacity: |
| $ |
4. This space may be used to provide any additional information to clarify the above items only:
Please DO NOT change content of the form
File details come from the government source that posted it. Updated .