Contractor Cost Breakdown.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Vinyl Floor Tile Replacement Bldg 623 Fort Devens MA
Solicitation number
W15QKN26QA134
Issued by

About this file

This is a Contractor Cost Breakdown template in spreadsheet format designed for construction pricing submissions. The template provides a structured framework for contractors to itemize and calculate total project costs for the vinyl floor tile replacement project at Building 623, Fort Devens, Massachusetts. The spreadsheet includes columns for labor (broken down by manhours and crew skill sets with applicable city cost indices), equipment, and material costs, with designated rows for calculating general contractor overhead, profit, bonding costs, and general and administrative (G&A) expenses leading to a grand total.

The cost breakdown template is tailored for submission under solicitation W15QKN26QA134, a small business set-aside for commercial construction services. The project involves vinyl floor tile replacement at Building 623 (Hall of Flags) on the main cantonment of Fort Devens and must be completed within 90 days of the notice to proceed. The requirement falls under NAICS code 236220 (Commercial and Institutional Construction) with a $45,000,000 size standard, and the Government will award a firm-fixed-price purchase order to the lowest price technically acceptable quoter. Contractors must populate the template with detailed cost information including labor rates by crew classification, equipment expenses, material costs with unit pricing, and all overhead and profit allocations to enable Government evaluation of submitted pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost

Totals

GENERAL CONTRACTOR

OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0

G & A $ - 0

GRAND TOTAL $ - 0

Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"

File details come from the government source that posted it. Updated .