Contractor Cost Breakdown.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Delta Range Grenade Pits Fort Devens MA
Solicitation number
W15QKN26QA138
Issued by

About this file

This is a Contractor Cost Breakdown template in spreadsheet format designed for construction project estimation and pricing. The template provides a structured framework for contractors to itemize and calculate total project costs across multiple cost categories. It includes sections for labor (organized by crew skill sets with manhour calculations), equipment, and materials, with provisions for applying city cost indices to account for regional price variations. The template automatically calculates subtotals for labor, equipment, and material costs, then adds overhead, profit, bonding, and general and administrative (G&A) expenses to arrive at a grand total cost.

The cost breakdown relates to the Delta Range Grenade Pits construction project at Fort Devens, Massachusetts, a firm-fixed-price commercial construction requirement issued by the U.S. Army Contracting Command – New Jersey under solicitation number W15QKN26QA138. The project falls under NAICS code 238110 (Poured Concrete Foundation and Structure Contractors) with a $19 million size standard, and all work must be completed within 365 days of notice to proceed. This acquisition uses lowest-price-technically-acceptable (LPTA) methodology with award resulting in a firm-fixed-price purchase order. Contractors responding to this solicitation would use this cost breakdown template to detail their pricing proposal, including labor rates by crew classification, equipment costs, material costs, and associated indirect costs and profit margins.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost

Totals

GENERAL CONTRACTOR

OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0

G & A $ - 0

GRAND TOTAL $ - 0

Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"