Contractor Cost Breakdown.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Solar System Repair Middletown, CT (CT019) Federal contract opportunity
Solicitation number
W15QKN-25-Q-A199
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

The provided file is a Contractor Cost Breakdown spreadsheet for Solicitation W15QKN-25-Q-A199, a solar system repair project for the U.S. Army in Middletown, CT. The spreadsheet is designed to capture detailed cost components including labor, equipment, and material expenses, with fields for tracking quantity, unit measures, labor hours, unit costs, and total costs across different labor categories and crew skill sets.

The associated federal contract opportunity involves a construction requirement (CSS# 96950) for solar system repair, issued by the 99th Readiness Division through the U.S. Army Contracting Command - New Jersey. The project requires a contractor to provide labor, equipment, tools, materials, supervision, and transportation for solar system repairs. The contract is classified under NAICS code 236220 (Maintenance and Construction of Office Buildings) with a size standard of $45,000,000. The period of performance is 90 calendar days after Notice to Proceed, with flexibility for contractors to propose alternative delivery schedules if needed.

View the file

Other files for this federal contract opportunity

Other files attached to Solar System Repair Middletown, CT (CT019), newest first.
File Type Posted
CT019-Middletown-B08-CSS 96950 RFI Answers.docx DOCX document
Solicitation Amendment W15QKN25QA199 0001 Released.pdf PDF
CT019-Middletown-B08-CSS 96950-SOW-Solar System Replace - 20240828.pdf PDF
Solicitation - W15QKN25QA199 - Released.pdf PDF
DBA WD CT20250022 Mod 6 Dated 06 June 2025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IDSortTypeDescription (to include how requirement is going to be completed)QuantityUnit MeasureLabor in ManhoursQuantityUnit MeasureEquipmentQuantityUnit MeasureMaterialTotal Cost
Labor Category (CREW SKILLSET)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Equipment BreakoutUnit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost

Totals

CO-EFFICIENT $ - 0

BONDING (IF APPLICABLE) $ - 0

GRAND TOTAL $ - 0

Unit Cost*Cost for one labor hour of the specified crewCost for one labor hour of the specified crewCost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours""=Unit Cost x Total Hours""=Unit Cost x Total Hours"