Contract_Price_Schedule_Geotermal_HVAC.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- REPLACE HVAC UNITS - GULF ISLANDS NAT'L SEASHORE Federal contract opportunity
- Solicitation number
- 140P5223Q0041
About this file
This document contains a contract price schedule template for the replacement of multiple HVAC units at Gulf Islands National Seashore. The National Park Service solicitation requests pricing for five line items to replace geothermal HVAC systems at Fort Pickens, Santa Rosa, and Naval Live Oaks areas. Offerors must submit pricing for all line items, with lump sum pricing provided for line items 1 through 3 and unit prices with extended totals for line items 4 and 5. The total base price should be provided to replace HVAC units at multiple locations within the park. The solicitation number is 140P5223Q0041 and responses are required to conform to the documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5223Q0041.pdf | ||
| DOL_WD_FL20230061_01_20_2023.pdf | ||
| SOW-2023-MULTIPLE-HVAC_UNITS.pdf | ||
| 5_SERIES_500A11_SPECIFICATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) | |||||
| Solicitation Number: | 140P5223Q0041 | ||||
| PARK - PMIS: | Gulf Islands National Seashore, PMIS 234402, 254185, 254189 and 290091 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Fort Pickens Area, Naval Live Oaks Area and Santa Rosa Area | ||||
| Project Title: | Replace Multiple HVAC Units in The Florida District | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for all line items | |||||
| Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, | |||||
| provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. | |||||
| In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Replace Three 6-Ton Geothermal HVAC Systems in Fort Pickens Building 5 | 1 | Lump Sum | ||
| 2 | Replace ONE 3-Ton Geothermal HVAC System in Santa Rosa Maint/Ranger Station | 1 | Lump Sum | ||
| 3 | Replace ONE 2-Ton Geothermal HVAC Unit in FP NLO Fire Cache | 1 | Lump Sum | ||
| 4 | Replace ASHP with ONE 2-Ton Geothermal HVAC System and Well Field/Piping in Cottage A | 1 | Lump Sum | ||
| 5 | Replace ASHP with ONE 2-Ton Geothermal HVAC System and Well Field/Piping in Cottage B | 1 | Lump Sum | ||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 5) --------------------------------------------------------------------------------- |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |