Contract Hauling Grand Teton National Park

RFQ # 140P1421Q0044

REQUIREMENT

Grand Teton National Park needs ta minimum of four (4) trucks for material hauling for the 2021 construction season. The park anticipates ordering 600 hours and possibly up to 800 hours of hauling.

The hauling will be required between May 24, 2021 and September 24, 2021. Hot mix asphalt is expected to be picked up July 6, 2021 – July 22, 2021.

The Hot Mix Asphalt will be picked‐up at the asphalt vendor’s plant (within 25 miles of the Park boundary), transported to Grand Teton National Park, and unloaded in the Park’s paving machine. Gravel and sand picked up at the location specified in the contract (likely within 25 miles of the Park boundary).

This is a 100% Total Small Business Set Aside. The North American Industry Classification System (NAICS) code is 484110. The small business size standard is $30.00 million.

Specifications:

A. A minimum of four, 12‐15 yard triple axle end dump trucks, fully operated, are required.

B. The Contractor’s dump trucks must be compatible with the Park’s paving machine.

i. The Park’s paving machine is a LeeBoy 7000 conveyor paving machine.

ii. The paving machine’s hopper is 8’ 6” wide, 32” high off the ground and has a depth of 55”.

iii. The hopper capacity is 6 tons.

iv. Due to the variability of dump truck box dimensions, the Contractor must assure that all trucks used in conjunction with this requirement are compatible with this type of paver.

C. No payment will be made for trucks unable to dump into the paver.

D. No pintle hitches will be allowed on the dump trucks.

E. All dump trucks shall have and use tarps.

F. Contractor shall furnish equipment on a fully operated basis that is in good mechanical and operating condition.

G. Equipment must be operated by competent operators who are experienced in performing similar work to that required by this contract. The operators will be experienced in safely operating dump trucks and be thoroughly familiar with their capabilities.

H. The Contractor shall provide all equipment, operating supplies, operators, supervision, and support functions necessary to perform the required work on a per hour basis.

I. The hauling must be readily available for pick-up during the period of performance, see above; approximate quantities will range between 6 yards & 300 yards per scheduled hauling. Note: The hauled quantity variation is due in part to uncertainty in weather conditions and availability of equipment (e.g., a change in weather conditions may only allow work for ½ day and/or equipment failures/availability may result in fewer yards of material being transported in a day).

J. The Government will provide a minimum of 24 hours’ notice prior to pick-up. Should the Government give less than 24 hours’ notice, the Vendor may elect to either load the trucks as requested or to schedule an alternate day. Pick-up days will be scheduled when conditions are favorable, and are weather, equipment, and asphalt plant dependent.

K. All vehicles and equipment to be used in Grand Teton National Park shall be thoroughly pressure washed prior to arrival. Equipment shall be inspected at the appropriate Park entrance station by a designated Park employee and only clean equipment shall be permitted into the Park. Particular attention must be shown to the under carriage and any surface where soil containing exotic weed seeds may exist. Equipment inspection will be scheduled by the maintenance office and take place at the Park entrance stations. Equipment found operating in the Park that has not been inspected shall be dead lined and subject to a citation.

L. The contractor shall adhere to all roadway use regulations and posted speed limits within the Park.

M. The use of engine brakes (either compression or exhaust) in a 3-mile radius of housing areas and campgrounds is prohibited.

N. The contractor shall coordinate the exact dates and times of delivery with the NPS in advance.

O. The contractor shall provide daily load tickets (documenting the time the trucks are loaded) to the CO.

Measurement and Payment: Payment will be made on agreed hauling hours completed within the terms of the contract.

The Government will have on an on-site representative in the field while work is being performed to document work completed. The on-site representative’s daily diaries and the supplier’s shift tickets are the forms of documentation that will be used in tracking the hours worked. The on-site representative/CO will compare load tickets provided by the supplier and diaries to confirm the accuracy of the invoices provided by contractor before payment is made.