About this file

Solicitation, Offer, and Award Summary

Document Type: This is a Solicitation, Offer, and Award document (Standard Form 1442) issued by the U.S. Air Force for a construction contract at Misawa Air Base, Japan.

Contract Overview: The solicitation is for Roads/Pavements and Miscellaneous Civil Work (IDIQ) Contract at Misawa Air Base, Japan. The contract number is FA520526D0004, with a solicitation number of FA520526B0001. The work includes roads, pavements, and miscellaneous civil work on an Indefinite Delivery/Indefinite Quantity (IDIQ) basis, where individual task orders (To) will be issued as needed. The contracting officer is Kazuaki Kawahara, and the contract specialist is Mayumi Ozawa, both located at FA5205 35 CONS PK, APO, AP 96319-5201.

Pricing and Performance Terms: The guaranteed minimum amount (GMA) is JPY300,000, and the un-guaranteed maximum amount is JPY1,500,000,000 for the entire contract life. The Basic Year price is JPY626,000,000 (August 27, 2026 to August 26, 2027), with an Option Year One price of JPY658,000,000 (August 27, 2027 to August 26, 2028). The product service code is Z2LB (Construction Services) with a firm fixed-price arrangement. The contractor must begin performance within 14 calendar days and complete within 365 calendar days after receiving the task order notice to proceed. Performance and payment bonds are required. Sealed offers are due by 11:00 AM local time on March 12, 2026. The contract was awarded on August 27, 2026, to NIPPO Corporation with a firm price of JPY626,000,000 for the basic year and JPY658,000,000 for the option year. The apparent successful offeror is authorized to operate and conduct business in Japan under the applicable federal authorization clauses (DFARS 252,225-7042). Key deliverables require inspection and acceptance by the authorized accepting official at FA5205 35 CONS PK. Liquidated damages apply at JPY80,871 for the first day of delay and JPY37,779 for each subsequent day. An option to extend services for up to six months is available, and the total contract duration cannot exceed two years and six months.

View the file

Other files

File Type Posted
Atch 4 Material Submittal.pdf PDF
Atch 2 Specifications.pdf PDF
Atch 1 Other Cont Requirements.pdf PDF
Atch 5 Addendum No. 1.pdf PDF
Atch 3 Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07 May 2026

14 May 2026 Tsuneya Takami, General Manager, Aomori District Management Office

2026-08-25T15:13:52+0900
TAKAMI. TSUNEYA
2026-08-25T15:15:30+0900
TAKAMI. TSUNEYA
2026-08-27T07:44:46+0900
OCAMPO.ROBERT PAULO.BALBOA.1410978985
Text4: Tsuneya Takami, General Manager, Aomori District Management Office
Text5: ROBERT PAULO OCAMPO
Date6_af_date: 27-Aug-26
Date7_af_date: 27-Aug-26