CONTRACT DOCUMENTS - l Drawings COMBINED -reduced_Part7.pdf

PDF 5 MB Posted

Attached to
Y1DZ--659-20-202 B2 Elevator Construction
Solicitation number
36C24622B0050
Issued by

About this file

This document package includes construction drawings and specifications for elevator modernization work at the Salisbury VA Medical Center in North Carolina. The drawings cover new work plans for mechanical systems on floors from the ground level through the roof. Relatedly, solicitation 36C24622B0050 seeks bids for the B2 Elevator Construction project at the site. A pre-bid site visit is scheduled for October 26th and questions are due by November 3rd. Bids must be submitted electronically to sean.cosby@va.gov by November 22nd and will be opened virtually at 10:00 AM EST on that date. The work involves modernizing elevators within Building 2 of the Salisbury VAMC, which is part of Veterans Integrated Service Network 6 of the Department of Veterans Affairs.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

SCHEDULES, CONTROLS, LEGEND AND

GENERAL NOTES - MECHANICAL

M001

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

PARTIAL GROUND FLOOR NEW WORK PLANS -

MECHANICAL

M101

PARTIAL GROUND FLOOR PIPING NEW WORK PLAN -

MECHANICAL

PARTIAL GROUND FLOOR DUCTWORK NEW WORK PLAN -

MECHANICAL

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

PARTIAL FIRST AND SECOND FLOOR NEW WORK

PLANS - MECHANICAL

M102

PARTIAL FIRST FLOOR NEW WORK PLAN - MECHANICAL PARTIAL SECOND FLOOR NEW WORK PLAN - MECHANICAL

S S

S S

S S

SSSS

S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

PARTIAL THIRD AND FOURTH FLOOR NEW WORK

PLANS - MECHANICAL

M103

PARTIAL THIRD FLOOR NEW WORK PLAN - MECHANICAL PARTIAL FOURTH FLOOR NEW WORK PLAN - MECHANICAL

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

PARTIAL FIFTH FLOOR AND ROOF NEW WORK

PLANS - MECHANICAL

M104

PARTIAL FIFTH FLOOR NEW WORK PLAN - MECHANICAL PARTIAL ROOF NEW WORK PLAN - MECHANICAL

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

JMK JSW

659-20-202

06-10-2022

SALISBURY, NC 28144

CONTRACT DOCUMENTS W. G. (BILL) HEFNER VAMC

BUILDING 2 ELEVATOR

INSTALLATION SPS/ SURGERY

DETAILS AND SCHEDULES - MECHANICAL

M501

05 CONTRACT DOCUMENTS - Mechancial.pdf
M001
M001
M101
M101
M102
M102

File details come from the government source that posted it. Updated .