This solicitation notice is for an elevator construction project at the Salisbury Veterans Affairs Medical Center in Salisbury, North Carolina. The project involves installing elevators in Building 2. A mandatory site visit will be held on October 26, 2022 at 10:00 AM at the building entrance. Questions regarding the solicitation are due by November 3, 2022 at 3:30 PM Eastern Time. Sealed bids must be submitted electronically to sean.cosby@va.gov and will be opened virtually on November 22, 2022 at 10:00 AM Eastern Time. The solicitation is being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STRUCTURAL NOTES W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S002
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
A4
B
A8 A9
A.D
B
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
REF
12' - 8"
REF
3' - 3"
REF
7' - 9"
REF
1' - 10"
REF
9 1/2" REF
9 1/2" REF
9' - 6"
REF
1' - 0" REF
3' - 7"
REF
4' - 7"
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
E-W12 E-W12
E-W10
E-W10
E-W10
E-W10
E-W14
E-W14
E-W14
E-W14
E-W14
E-W14
E-W14
E-W18
E-M8
E-M8
E-M8 E-M10
E-W14
E -W
E
-W
E -W
E -W
E -W
E -W
E-W
E-M12
E-M12
E-M12
E -W
E-W
E -W
E
-W
E -W
E
-W
E -W
E-W8E-W8
E-M8
E-M8
E-M8
E-M8
E-M8
E -W
E
-W
E -W
E
-W
E -W
E
-W
E-W10
E-W10 E
-W
E-M8
E-W10
E -W
E-W10
E -W
F.3
NEW 8" CMU W/ #5@48"O.C.
AND #9 HORIZONTAL LADDER
REINFORCING @ 16"O.C.
S401
TYP.
REF
8' - 1"
S505
S401
S401
S401
PLAN
NORTH
TRUE
NORTH
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.3
REF
12' - 8"
REF
3' - 3"
REF
7' - 9"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
E-M10 E-M10
E -W
E-M8
E-M10
E-W10E-M8
E-M8
E-M8
E -W
E-W10
E-W10
E-W
E-M10 E-W14
E -W
E-W10 E-M10 E-W14 E-W
E-W
E-M12
E-W10
E-W10
E-W10 E-M12
E -W
E -W
E-M10
E-M10
E-M10
E-M10
E -W
E-W14
E-W14
E-W14
E-W14
E-W16E-W10E-W14E-W12
E-W10
E-M12
DEMO EXISTING M12
BEAM BETWEEN
GRID F.2 AND F.9
DEMO EXIST W10 BEAM
BETWEEN GRID F.2 AND F.9
DEMO EXISTING
COMPOSITE DECK WITH
CONCRETE FILL.
E- HSS7X7X5/8
E- HSS7X7X1/2
E- HSS7X7X3/8
E- HSS7X7X3/8
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
SEE NOTE 3
SHORE ENDS OF BEAM
AS REQUIRED. SHORING
CONSTRUCTION AND
DESIGN BY CONTRACTOR
INDICATES EXISTING FLOOR / ROOF SLAB TO BE
DEMOLISHED
INDICATES STEEL BEAM TO BE DEMOLISHED
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. PROVIDE NON-DESTRUCTIVE TEST OF EXISTING COLUMNS TO VERIFY
THAT NO CROSS SECTIONAL LOSS DUE TO EXISTING CORROSION OF
INTERIOR TUBE WALLS.
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. PROVIDE NON-DESTRUCTIVE TEST OF EXISTING COLUMNS TO VERIFY
THAT NO CROSS SECTIONAL LOSS DUE TO EXISTING CORROSION OF
INTERIOR TUBE WALLS.
4. DO NOT DAMAGE EXISTING STRUCTURE TO REMAIN
INDICATES NEW CMU WALL
E-WXX DENOTES EXISTING BEAM
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
GROUND AND FIRST FLOOR
PLANS
W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S101
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S101
1 GROUND FLOOR FRAMING PLAN
Scale: 1/4"=1'-0"
1' 4' 8' 12'
Scale: 1/4"=1'-0"
1' 4' 8' 12' 1/4" = 1'-0"S101
2 FIRST FLOOR DEMOLITION PLAN
FLOOR DEMO FRAMING PLAN LEGEND
GROUND FLOOR FRAMING PLAN NOTES
FIRST FLOOR DEMOLITION PLAN NOTES
GROUND FLOOR FRAMING PLAN LEGEND
ROOF
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
REF
12' - 8"
REF
3' - 3"
REF
9' - 7"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
E-W10
E-W10
E-W10
E-W10
E-W10
E-M10
E-M10
E-M10
E-M10
E-M10
E-M10
E-M8
E-M8
E-M10 E-M10
E-M8E-M8
E-M10
E-M8
E -W
E-W14
E-W14
E-W14
E-W14
E-W14
E-W14
E-W14E-M12
E-M12
E-W10
E-M12
E-W10
E-W10
E -W
E -W
E
-W
E -W
E -W
E-W
E-W
E-W
E-HSS7x7x3/8
E-HSS7x7x1/2E-HSS7x7x5/8
E-HSS7x7x3/8
S201
S201
2S201
S201
W8X10
W10X22
W
X
W10X22
W
X
SEE NOTE 7
SEE NOTE 7
SEE NOTE 7
SEE NOTE 7
NEW 1.5 VLI18 DECK WITH 2 1/2" CONCRETE
COVER. REINFORCE WITH WWR 6x6-W1.4xW1.4.
ALIGN FLUTES WITH EXISTING DECKING AND
PROVIDE POUR STOPS AS REQUIRED TO
PREVENT SPILLAGE. PROVIDE MINIMUM 2"
BEARING ON EXISTING STEEL SUPPORTS.
E O
S
9"
EOS
9"
OPENING
8' - 1"
O P
E N
IN
G
/2
E O
S
9"
EOS
9"
S505
REFER TO 7/S505
FOR BEAM SUPPORT
REFER TO 7/S505
FOR BEAM SUPPORT
REMOVE EXISTING SHORING
AFTER NEW BEAM SUPPORTS
HAVE BEEN INSTALLED
REMOVE EXISTING SHORING
AFTER NEW BEAM SUPPORTS
HAVE BEEN INSTALLED
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
REF
12' - 8"
REF
3' - 3"
REF
9' - 7"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
W
X
W10X22
W
X
W14X22
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W14X22
HSS8X4X3/8
W
X
W14X22
W 16X40
S201
S201
2S201
S201
S201
W12X19
W16X40
W 16X40
W16X40
2VLI20+3 1/4" LIGHT WEIGHT
CONCRETE. THE SLAB SHALL BE
REINFORCED WITH WWR6x6-W2.9XW2.9
S504
S503
S504
S503
S504
W14X22
S503
4SIM. OPP.
HAND
TYP
S503
S504
S504
S504
S505
S505
S505
EOD
4"
E O
D
2"
EO
D
2"
EOD
2" 1'
EOD
2"
E Q
E Q
E Q
E Q
S505
EO
D
4"
S501
EOD
8"
V=4K
M=14KFT
V=4K
M=14KFT
V=14K
M=34KFT
V=10K
M=19KFT
V=7K
M
=22KFT
V=5K
M=22KFT V=12K
M=13KFT
V=12K
M=21KFT
S504
S501
1' - 0" 2' - 10"
1' - 10 1/2"
S505
TYP.
S503
S503
E O
S
9"
EOS
9"
E O
S
9"
EOS
9"
TYP.
PLAN
NORTH
TRUE
NORTH
BRACED FRAME
BEAM
DENOTES DECK SPAN DIRECTION & DECK DESCRIPTION
DENOTES MOMENT CONNECTION
DENOTED CONNECTION TO EXISTING CONCRETE BEAM,
SEE 2/S504
DENOTES MASONRY WALL BELOW
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/SLAB ELEVATION = 731.55' UNO
4. T/STL. X'-X" TYP. UNO
5. (-X'-X") INDICATES T/STL ELEVATION RELATIVE TO TYP. T/STL.
6. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/SLAB ELEVATION = 720.55' UNO
4. T/STL. X'-X" TYP. UNO
5. (-X'-X") INDICATES T/STL ELEVATION RELATIVE TO TYP. T/STL.
6. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
7. CONTRACTOR SHALL PROVIDE NON-DESTRUCTIVE TESTING OF EXISTING
COLUMNS TO DETERMINE AMOUNT OF SECTION LOSS WHICH HAS
OCCURRED DUE TO CORROSION. IF MORE THAN 10% HAS BEEN LOST,
REPLACE COLUMN IN KIND.
8. E-WXX DENOTES EXISTING MEMBER
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
FIRST AND SECOND FLOOR
FRAMING PLANS
W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S102
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S102
1 FIRST FLOOR FRAMING PLAN
1/4" = 1'-0"S102
2 SECOND FLOOR FRAMING PLAN
Scale: 1/4"=1'-0"
1' 4' 8' 12'
Scale: 1/4"=1'-0"
1' 4' 8' 12'
FLOOR FRAMING PLAN LEGEND
FLOOR FRAMING PLAN NOTES 2nd FLOOR
FLOOR FRAMING PLAN NOTES 1st FLOOR
PLAN
NORTH
TRUE
NORTH
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
W
X
W10X22 W
X
W14X22
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W14X22
HSS8X4X3/8
F.3
S201
S201
2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
7' - 9"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
W16X40
W 16X40
W 16X40
W16X40
W12X19
W
X
W14X22
2VLI20+3 1/4" LIGHT WEIGHT
CONCRETE. THE SLAB
SHALL BE REINFORCED
WITH WWR6x6-W2.9XW2.9
S503
S503
S504
S503
S504
W14X22
S503
4SIM. OPP.
HAND
TYP.
S503
S504
S504
S505
E O
D
2"
EOD
2"
EOD
4"
EO
D
4"
EO
D
2"
EOD
2"
S505
E Q
E Q
E Q
E Q
S505
S501
EOD
8"
S504
S505
V=4K
M=14KFT
V=4K
M=14KFT
V=14K
M=34KFT
V=10K
M=19KFT
V=7K
M=22KFT
V=5K
M=22KFT
V=12K
M=13KFT
V=12K
M=21KFT
S504
S501
1' - 0" 2' - 10 1/2"
1' - 11"
S505
TYP.
1'
" 1'
/2
S503
S503
E O
S
9"
EOS
9"
E O
S
9"
EOS
9"
TYP.
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.8.1
W
X
W10X22
W
X
W14X22
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W14X22
HSS8X4X3/8
F.3
S201
S201
2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
2' - 7"
REF
5' - 2"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
W12X19
W16X40
W 16X40
W 16X40
W14X22
W
X
W16X40
2VLI20+3 1/4" LIGHT WEIGHT
CONCRETE. THE SLAB SHALL
BE REINFORCED WITH
WWR6x6-W2.9XW2.9
S504
S503
S504
S503
S504
W14X22
S503
4SIM. OPP.
HAND
TYP.
S503
S504
S504
S505
S505
EO
D
4"
EOD
4"
EOD
2"
E O
D
2"
EOD
2"
EO
D
2"
E Q
E Q
E Q
E Q
S505
S501
EOD
8"
S504
S505
V=4K
M=14KFT
V=4K
M=14KFT
V=14K
M=34KFT
V=10K
M=19KFT
V=7K
M=22KFT
V=5K
M=22KFT
V=12K
M=13KFT
V=12K
M=21KFT
S504
S501
1' - 0" 2' - 10 1/2"
1' - 11"
S505
TYP.
1'
S503
S503
E O
S
9"
EOS
9"
E O
S
9"
EOS
9"
TYP.
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/SLAB ELEVATION 3rd FLOOR = 742.55' UNO
4. T/SLAB ELEVATION 4th FLOOR = 753.55' UNO
5. T/STL. X'-X" TYP. UNO
6. (-X'-X") INDICTAES T/STL ELEVATION RELATIVE TO TYP. T/STL.
7. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
BRACED FRAME
BEAM
DENOTES DECK SPAN DIRECTION & DECK
DESCRIPTION
DENOTES MOMENT CONNECTION
DENOTED CONNECTION TO EXISTING CONCRETE
BEAM, SEE 2/S504
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
THIRD AND FOURTH FLOOR
FRAMING PLANS
W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S103
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S103
1 THIRD FLOOR FRAMING PLAN
Scale: 1/4"=1'-0"
1' 4' 8' 12'
Scale: 1/4"=1'-0"
1' 4' 8' 12' 1/4" = 1'-0"S103
2 FOURTH FLOOR FRAMING PLAN
FLOOR FRAMING PLAN NOTES 3rd & 4th FLOOR
FLOOR FRAMING PLAN LEGEND
A8 A9
A.D
B
B
A4
A8 A9
A.D
B
A4
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.8.1
W
X
W10X22
W
X
W14X22
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W14X22
W14X22
HSS8X4X3/8
W16X40
F.3
S201
S201
2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
2' - 7"
REF
5' - 2"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
W12X19
W
X
W 16X40
W 16X40
W14X22
W16X40
2VLI20+3 1/4" LIGHT WEIGHT
CONCRETE. THE SLAB SHALL
BE REINFORCED WITH
WWR6x6-W2.9XW2.9
W10X30
S504
S503
S504
S503
S504
S503
SIM. OPP.
HAND
TYP.
S503
S504
S504
S505
EOD
4"
EOD
2"
E O
D
2"
EOD
2"
EO
D
2" E Q
E Q
S505
EO
D
4"
S501
S505
S501
EOD
8"
S504
S505
E Q
E Q
V=4K
M=12KFT
V=4K
M=12KFT
V=11K
M=27KFT
V=9K
M=18KFT
V=6K
M=17KFT
V=4K
M=17KFT
V=9K
M=13KFT
V=10K
M=16KFT
S504
S501
1' - 0" 2' - 10 1/2"
1' - 11"
S505
TYP.
W
X
W
X
W 8X
10 W8X10W8X10
1'
S503
S503
E O
S
9"
EOS
9"
E O
S
9"
EOS
9"
TYP.
PLAN
NORTH
TRUE
NORTH
EFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.8.1
W
X
W10X22
W
X
W14X22
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W14X22
W14X22
HSS8X4X3/8
F.3
S201
S201 2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
2' - 7"
REF
5' - 2"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
W 16X40
W 16X40
W16X40
W12X19
W
X
W14X22
2VLI20+3 1/4" LIGHT WEIGHT CONCRETE.
THE SLAB SHALL BE REINFORCED WITH
WWR6x6-W2.9XW2.9
S504
S503
S504
S503
S504
S503
SIM. OPP.
HAND
TYP.
S503 W16X40
S504
S504
S505
EO
D
4"
EOD
4"
EOD
2"
E O
D
2"
EOD
2"
EO
D
2"
S505
S505
S501
EOD
8"
S504
E Q
E Q
E Q
E Q
S505
V=4K
M=15KFT
V=4K
M=15KFT
V=15K
M=36KFT
V=10K
M=20KFT
V=7K
M=24KFT
V=5K
M=23KFT
V=8K
M=15KFT
V=13K
M=22KFT
S504
S501
1' - 0" 2' - 10 1/2"
1' - 11"
S505
TYP.
1'
S503
S503
E O
S
9"
EOS
9"
E O
S
9"
EOS
9"
TYP.
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/SLAB ELEVATION 5th FLOOR = 764.55' UNO
4. T/SLAB ELEVATION 6th FLOOR = 777.05' UNO
5. T/STL. X'-X" TYP. UNO
6. (-X'-X") INDICTAES T/STL ELEVATION RELATIVE TO TYP. T/STL.
7. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
BRACED FRAME
BEAM
DENOTES DECK SPAN DIRECTION & DECK
DESCRIPTION
DENOTES MOMENT CONNECTION
DENOTED CONNECTION TO EXISTING CONCRETE
BEAM, SEE 2/S504
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
FIFTH AND SIXTH FLOOR
FRAMING PLANS
W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S104
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S104
2 SIXTH FLOOR FRAMING PLAN
Scale: 1/4"=1'-0"
1' 4' 8' 12' 1/4" = 1'-0"S104
1 FIFTH FLOOR FRAMING PLAN
Scale: 1/4"=1'-0"
1' 4' 8' 12'
FLOOR FRAMING PLAN NOTES 5th & 6th FLOOR
M M
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.8.1
W
X
W18X35
W
X
W18X35
H S
S 8X
4X 3/
HSS8X4X3/8
H S
S 8X
4X 3/
W8X10
W18X35
HSS8X4X3/8
W16X40
W12X14
W 16X40
F.3
W18X35
S201
S201 2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
2' - 7"
REF
5' - 2"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
W14X22
W16X40
W
X
W10X30
2VLI20+3 1/4" LIGHT WEIGHT
CONCRETE. THE SLAB SHALL
BE REINFORCED WITH
WWR6x6-W2.9XW2.9
S504
S503
S503
S503
W12X14
W
X
W
X
W12X14
S503
4SIM. OPP.
HAND
TYP.
S503
S504
S504
W18X35
W18X35
S505
W18X35
EO
D
4"
EOD
4"
EOD
2"
E O
D
2"
EOD
2"
EO
D
2"
EOD
8"
S505
E Q
E Q
E Q
E Q
E Q
E Q
V=8K
M=27KFT
V=8K
M=27KFT V=14K
M=32KFT
V=9K
M=15KFT
V=6K
M=6KFT
V=11K
M=20KFT
R72' - 5"
R1
R3
R5
1' - 4"
R8
R4
R6
R2
6"
R9
S503
SIM
W
X
W8X10
W 8X
10 W8X10
S504
1' - 0"
2' - 10 1/2"
1' - 11"
S505
TYP.
W16x40
S505
1'
S503
TYP.
DEFGH
D.5D.9F.1F.2F.9
3.9
3.6
3.1
1.7
F.8.1 F.3
S201
S201 2S201
S201
S201
R E
F
1"
R E
F
7'
R E
F
2'
R E
F
2'
/2
R E
F
R E
F
8'
/2
R E
F
1'
R E
F
4'
R E
F
3'
REF
12' - 8"
REF
3' - 3"
REF
2' - 7"
REF
5' - 2"
REF
1' - 10"
REF
9 1/2"
REF
9 1/2"
REF
9' - 6"
REF
1' - 0"
REF
3' - 7"
REF
4' - 7"
W
X
W14X22
W16X40
W 14X22
W14X22
W
X
W8X10
W10X22
W
X
W
X
W16X26 W8X10
W
X
W12X14
1.5B16 METAL
ROOF DECK
E Q
E Q
S504
S504
S505
S504
S504
EOD
4 1/2"
E O
D
8"
EOD
8"
EO
D
3"
EOD
3"
E Q
E Q
S504
S504
S504
W12x22 HOIST BEAM
CENTERED ON
OPENING BELOW
W8X10
W 8X
S504
2' - 2"
1' - 4 1/2"
S504
W8X10
W 8X
W12X22
S503
6SIM
EO
D 4 1/2"
PLAN
NORTH
TRUE
NORTH
BRACED FRAME
BEAM
EDGE OF DECK
DENOTES DECK SPAN DIRECTION & DECK DESCRIPTION
DENOTES MOMENT CONNECTION
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/STL ELEVATION = 792.38' UNO
4. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
1. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
SUBMISSION OF SHOP DRAWINGS FOR REVIEW
2. REF. DENOTES FOR REFERENCE ONLY. FIELD VERIFY
3. T/SLAB ELEVATOR MACHINE ROOM ELEVATION = 783.05' UNO
4. T/STL. MACHINE ROOM ROOF 792.38 FT TYP. UNO
5. (-X'-X") INDICTAES T/STL ELEVATION RELATIVE TO TYP. T/STL.
6. DO NOT PRIME STEEL THAT WILL RECEIVE SPRAY-ON FIRE PROOFING
ELEVATOR MACHINE LOADING SCHEDULE
MARK LOADS (lbs)
R1 8,754
R2 10,609
R3 2,809
R4 8,604
R5 2,589
MARK LOADS (lbs)
R6 10,967
R7 5,735
R8 3,769
R9 530
BRACED FRAME
BEAM
DENOTES DECK SPAN DIRECTION & DECK
DESCRIPTION
DENOTES MOMENT CONNECTION
DENOTED CONNECTION TO EXISTING CONCRETE
BEAM, SEE 2/S504
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
MACHINE ROOM FLOOR
AND ROOF FRAMING PLANS
W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S105
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S105
1 MACHINE ROOM FLOOR FRAMING PLAN
1/4" = 1'-0"S105
2 MACHINE ROOM ROOF
Scale: 1/4"=1'-0"
1' 4' 8' 12'
Scale: 1/4"=1'-0"
1' 4' 8' 12'
ROOF FRAMING PLAN LEGEND
MACHINE ROOF FRAMING PLAN NOTES
MACHINE ROOM FRAMING PLAN NOTES
GROUND FLOOR
0"
2ND FLOOR
23' - 0"
1ST FLOOR
12' - 0"
F F.2 F.9
3RD FLOOR
34' - 0"
4TH FLOOR
45' - 0"
5TH FLOOR
56' - 0"
MAIN ROOF
68' - 6"
MACHINE ROOM
FLOOR FRAMING
PLAN
74' - 6"
MACHINE ROOM
ROOF
83' - 10"
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
H S
S 7X
7X 3/
H S
S 7X
7X 3/
HSS4X4X1/4
E
H S
S 7X
7X 3/
E
H S
S 7X
7X 3/
H
S S
7X 7X
3/
H S
S 7X
7X 3/
H
S S
7X 7X
3/
H S
S 7X
7X 3/
9' - 7"1' - 7"
S501
TYP.
SIM.
S502
3 TYP
S501
TYP.
OPP HAND
S502
1 TYP
S505
T=C=10.0 K
T=C=8.0 K
T=C=6.5 K
T=C=5.0 K
T=C=3.5 K
T=C=2.5 K
T=C=1.0 K
NOTE:
ALL LOADS SHOWN
ARE SERVICE LEVEL
GROUND FLOOR
0"
2ND FLOOR
23' - 0"
1ST FLOOR
12' - 0"
3.1 1.7
3RD FLOOR
34' - 0"
4TH FLOOR
45' - 0"
5TH FLOOR
56' - 0"
MAIN ROOF
68' - 6"
MACHINE ROOM
FLOOR FRAMING
PLAN
74' - 6"
MACHINE ROOM
ROOF
83' - 10"
H S
S 7X
7X 1/
H S
S 7X
7X 3/
H
S S
7X 7X
3/
H S
S 7X
7X 1/
H
S S
7X 7X
1/
H S
S 7X
7X 3/
E
H S
S 7X
7X 1/
E
H S
S 7X
7X 3/
12' - 0 1/2"
S502
3 TYP.
HSS4X
4X 1/4
HSS4X
4X
1/4
HSS4X
4X
1/4
HSS4X
4X
1/4
HSS4X
4X
1/4
HSS4X
4X1/4
HSS4X4X1/4
S501
5TYP.
S501
SIM.
OPP HAND
S502
1 TYP.
T=C=1.0 K
T=C=2.0 K
T=C =2
.5 K
T=C=3.0 K
T=C=4.0 K
T=C=4.5 K
T=C=6.0 K
NOTE:
ALL LOADS SHOWN
ARE SERVICE LEVEL
GROUND FLOOR
0"
2ND FLOOR
23' - 0"
1ST FLOOR
12' - 0"
3.11.7
3RD FLOOR
34' - 0"
4TH FLOOR
45' - 0"
5TH FLOOR
56' - 0"
MAIN ROOF
68' - 6"
MACHINE ROOM
FLOOR FRAMING
PLAN
74' - 6"
MACHINE ROOM
ROOF
83' - 10"
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
H S
S 7X
7X 3/
H S
S 7X
7X 5/
H
S S
7X 7X
5/
H S
S 7X
7X 3/
H
S S
7X 7X
3/
H S
S 7X
7X 5/
E
H S
S 7X
7X 3/
E
H S
S 7X
7X 5/
12' - 0 1/2"
S501
SIM.
TYP.
S502
TYP.
S501
TYP.
OPP
HAND
S502
1 TYP.
T=C=6.0 K
T=C=5.0 K
T=C=3.5 K
T=C=3.0 K
T=C=2.0 K
T=C=2.0 K
T=C=1.0 K
NOTE:
ALL LOADS SHOWN
ARE SERVICE LEVEL
GROUND FLOOR
0"
2ND FLOOR
23' - 0"
1ST FLOOR
12' - 0"
F F.1
3RD FLOOR
34' - 0"
4TH FLOOR
45' - 0"
5TH FLOOR
56' - 0"
MAIN ROOF
68' - 6"
MACHINE ROOM
FLOOR FRAMING
PLAN
74' - 6"
MACHINE ROOM
ROOF
83' - 10"
F.8.1
E
W
X
W
X
W
X
W
X
W
X
HSS4X4X1/4
7' - 9 1/2"
9 1/2"
HSS
4X
4X 1/
S502
2TYP.
S505
6TYP.
S501
SIM.
TYP.
OPP
HAND
S502
T= C=1
.5
K
T=C=3.50 K
NOTE:
ALL LOADS SHOWN
ARE SERVICE LEVEL
GROUND FLOOR
0"
2ND FLOOR
23' - 0"
1ST FLOOR
12' - 0"
FG F.2F.9
3RD FLOOR
34' - 0"
4TH FLOOR
45' - 0"
5TH FLOOR
56' - 0"
MAIN ROOF
68' - 6"
MACHINE ROOM
FLOOR FRAMING
PLAN
74' - 6"
MACHINE ROOM
ROOF
83' - 10"
2L3-1/2X3-1/2X1/4 2L3-1/2X3-1/2X1/4
3' - 3" 9' - 7"
H S
S4 X4
X1 /4
H S
S 4X4X1/4
S501
S505
9TYP.
S502
1TYP.
S501
S502
1 TYP.
S502
3 TYP.
H S
S 7X
7X 5/
H S
S 7X
7X 1/
H
S S
7X 7X
1/
H S
S 7X
7X 5/
E
H S
S 7X
7X 1/
E
H S
S 7X
7X 5/
H S
S 7X
7X 1/
H S
S 7X
7X 5/
T= C
=1 .5
K T=C
=1.50 K
T=C=3.50 KT=C=3.50 K
NOTE:
ALL LOADS SHOWN
ARE SERVICE LEVEL
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
FRAMING ELEVATIONS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S201
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1/4" = 1'-0"S201
1 Elevation 1 - a 1/4" = 1'-0"S201
2 Elevation 2 - a 1/4" = 1'-0"S201
3 Elevation 3 - a 1/4" = 1'-0"S201
4 Elevation 4 - a
Scale: 1/4"=1'-0"
1' 4' 8' 12' 1/4" = 1'-0"S201
5 Elevation 5 - a
2" 2"
1"
(2) 3/8" DIA. x 2 3/8" EMBED
ADHESIVE ANCHORS
L6x4x5/16 x 1'-0" LONG
AT 4'-0" O.C.
(2) 1/2" DIA. x4" EMBED
MASONRY ADHESIVE ANCHORS
ONE ANCHOR PER CELL
8" CMU WALL WITH #5@48"O.C.
VERTICAL AND #9 LADDER
REINFORCING AT 16" O.C.
L6x4x5/16 x 0'-8" LONG AT 4'-0" O.C. WITH (2) 3/8" DIA. x 2 3/8"
EMBED ADHESIVE ANCHORS
(EACH SIDE OF WALL)
EXISTING SLAB
EXISTING CONCRETE
FILLED METAL DECK
R E
F
0"
1 1/2" 5"
1 1/2"
A - A
A
A
STANDARD HOOK, BOND
BEAM NOT SHOWN FOR
CLARITY.
CMU WALL, SEE PLAN.
HORIZONTAL JOINT
REINFORCING AT 16" O.C.
CONTINUOUS VERTICAL
WALL REINFORCEMENT (NO
SPLICES), SEE SCHEDULE.
FILL ALL REINFORCED CELLS SOLID
WITH GROUT. DELAY APPROX. (5)
MINUTES (TO ALLOW EXCESS
WATER TO BE ABSORBED BY THE
CMU UNITS) AND THEN
CONSOLIDATE BY
MECHANICALLY VIBRATING.
PROVIDE FULL MORTAR
BED AT REINFORCED CELLS
MATCHING DOWELS
S E
E S
C H
E D
U L E
L A
P S
P L
IC
E
TOP OF FDN.
(OR PREVIOUS
WALL LIFT)
M A
X L
IF
T H
E
IG
H T
STOP LINE FOR
4'-8" LIFT
BAR DIA. "D"
EQUALEQUAL
S E
E S
C H
E D
U L E
L A
P S
P L
IC
E
A F
T E
R G
R O
U T
I N
L O
W E
R L
IF
T
I S
S
E T
L
A Y
-U P
R
E
IN
F O
R C
E
G R
O U
T N
E X
T
L
IF
T
0"
BLOCK OUTLINE NOT
SHOWN FOR CLARITY
VERT. BARS WITHIN
8" OF ALL CJ
(2)#5 SILLS
CONTROL JOINT (CJ)
LINTEL REINFORCING
#9 LADDER JOINT REINF.
@ 16" O.C. U.N.O.
SEE SCHEDULE
VERT. WALL REINF.
SEE SCHEDULE
VERT. WALL REINF.
TOP OF WALL
(3) LAYERS,
(2)#5 BAR MIN. @
TOP OF WALL U.N.O.
DISCONTINUE THRU C.J. U.N.O.
BAR DIAMETERS
24" OR 40
JAMB REINF.,
SEE JAMB DETAILS
4"
REINFORCING
SOLID GROUT FILL
SEE PLAN
TYPICAL
PLAN AT CORNER
PLAN AT
INTERSECTION
SECTION
48 BAR DIA.
TYPICAL
CONTINUOUS REINF., SEE
SECTIONS & DETAILS
SINGLE BAR
IN
C
E L L
C E
N T
E R
SOLID
GROUT TYP.
3/8"
MANUFACTURER CONTROL
JOINT INSTALLED PER
SUPPLIER'S REQUIREMENTS
VERTICAL REINFORCEMENT EACH
SIDE OF JOINT SAME SIZE AS TYP.
REINFORCING
CONTROL JOINT ON TRUE VERTICAL
PLACE, CAULKED EACH SIDE
NOTE: SEE ARCHITECTURAL
DRAWINGS FOR WALL
CONTROL JOINT LOCATIONS
LINTEL
SILL
(2)#5
16" BOND BEAM
HORIZ. REINF
@ 16" O.C.
SOLID GROUT FILL
(2)#5 EXTEND
2'-0" BEYOND
OPENING MIN.
BOND BEAM
@ SILL
(2)#5 EXTEND
2'-0" BEYOND
OPENING MIN.
HORIZ. REINF.
@ 16" O.C.
L
IN
T E
L H
E
IG
H T
S E
E S
C H
E D
B
O N
D B
E A
M
T O
P
FILL SOLID W//
GROUT
VERT. WALL
REINFORCING W/
STD. HK. SEE
SCHEDULE
T Y
P
4" TYP.
S E
E S
C H
E D
U L E
D
WALL WIDTH
SEE PLAN
NOTES:
1. SEE THE ARCHITECTURAL DWGS. FOR SIZE
AND LOCATION OF ALL OPENINGS.
2. PROVIDE 8" MINIMUM BEARING EACH END.
3. SCHEDULE APPLIES ONLY TO LINTELS NOT
OTHERWISE SHOWN.
4. CONTRACTOR TO PROVIDE TEMPORARY
SHORING UNTIL MASONRY HAS PROPERLY
SET (3 DAY MINIMUM).
LINTEL SCHEDULE
CLEAR SPAN "D" REINFORCING
LESS THAN 3'-0" 8" (2)#5
3'-0" TO 8'-0" 24"
(2)#5 TOP &
BOT
JAMB 1
WALL OPENING
8"x16" PILASTER
W/ (2)#5 BAR
TYPICAL WALL
REINFORCEMENT,
SEE PLAN
G A
P
1/ 2"
SLAB, SEE
PLAN
BEAM, SEE
PLAN
L8x4x7/16x1'-0" LSV AT 4'-0" O.C. WITH
(2) 1/2" DIA. x4" EMBED HILTI HY270
ANCHORS (1) PER CELL. CENTER
ANCHORS IN LONG SLOTTED
VERTICAL HOLES IN ANGLE LEG
3/16
HOIST WAY
(2) 3/8" DIA. x 2 3/8" EMBED
ADHESIVE ANCHORS
L6x4x5/16 x 1'-0" LONG
AT 4'-0" O.C.
(2) 1/2" DIA. x4" EMBED
MASONRY ADHESIVE ANCHORS
ONE ANCHOR PER CELL
8" CMU WALL WITH #5@48"O.C.
VERTICAL AND #9 LADDER
REINFORCING AT 16" O.C.
EXISTING SLAB
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
MASONRY DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S401
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
3/4" = 1'-0"S401
9 CMU WALL BRACING DETAIL
3/4" = 1'-0"S401
1 TYPICAL LOW-LIFT WALL CONSTRUCTION
3/8" = 1'-0"S401
2 TYPICAL WALL REINFORCING ELEVATION
3/4" = 1'-0"S401
3 TYPICAL BOND BEAM REINF. DETAILS
3/4" = 1'-0"S401
4 CMU BAR PLACEMENT DETAIL
3/4" = 1'-0"S401
5 TYPICAL CMU CONTROL JOINT DETAIL
3/4" = 1'-0"S401
7 TYPICAL BOND BEAM DETAIL
3/4" = 1'-0"S401
8 TYPICAL CMU LINTEL DETAIL
1 1/2" = 1'-0"S401
6 TYP. CMU JAMB DETAIL
3/4" = 1'-0"S401
10 CMU CONNECTION AT STEEL BEAM
R 1/ 2" T
YP
1/2" TYP
T O
N E
A R
E S
T
/4 k R
O U
N D
E D
U P bf
T O
N E
A R
E S
T
/4 k
R O
U N
D E
D U
P
ROUND UP TO NEAREST 1/4"
(b /2) + 1/2" f
STEEL BEAM,
SEE PLAN
L4x3x5/16 LENGTH AS
REQUIRED BY BOLT
QUANTITY
NOTE:
QTY OF FASTENERS TO BE
BASED ON THE BEAM SIZE.
C BEAML
BEAM SIZE
W8
W10
W12
W16
# OF 3/4" A325
BOLTS
W14
3" MAX.
S P
A C
E S
M A
X
M
IN
1/ 2"
M
IN
W18 5
1/4" CAP PLATE AT TOP OF
COLUMN
3/4" DIA ASTM
A-325 BOLTS
3/8" PLATE MIN.
NOTES:
1. QTY. OF FASTENERS, AS REQUIRED
FOR BEAM SIZE.
/2
/2
3/16
TYP.
1/8
AT TOP OF
COLUMN
HSS COLUMN,
SEE PLAN
4"
1 1/2"
1/2"
BEAM, SEE
PLAN
BEAM, SEE PLAN
BEAM SIZE
# OF 3/4"
A325 BOLTS
W12
W16 5
W14
W8, W10 2
62K
43K
43K
43K
Ф R n
W18 5 81K
BEAM, SEE PLAN
HSS COLUMN, SEE
PLAN
BEAM
BRACE
W.P.
1/2" GUSSET PL.
ERECTION BOLT (AT
CONTRACTOR'S OPTION)
SLOT TUBE FOR CONNECTION
TO GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
5/16 6
EA. SIDE
1/4 6 MIN
TYP
T/ STL
SEE PLAN
CL
1/4 6" MIN
1/81/4" CAP PLATE AT
TOP OF COLUMN
SEE TYPICAL
CONNECTION
DETAILS
1/4 3" MIN
EA. SIDE
1/4 6" MIN
TYP
T/ STL
SEE PLAN
CL
BEAM,SEE PLAN
BEAM
BRACE
W.P.
1/2" GUSSET PL.
ERECTION BOLT
SLOT TUBE FOR CONNECTION
TO GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
SEE TYPICAL CONNECTION DETAILS.
BEAM
1/4 6" MIN
1/2" 3/16 3/16
TYP
3/8" STIFFENER
PLATE EA. SIDE
COLUMN, SEE PLAN
BEAM, SEE PLAN
1/2"x0'-10"x0'-10"
BASE PLATE
3/16
C MIDSPAN OF BAY
COLD JOINT,
EXTEND REINFORCING
THRU JOINT
LC BEAML C BEAML
T/SLAB
SEE PLAN
EQUAL EQUAL
P L A
N
S E
E
CLEAN AND ROUGHEN SURFACE,
APPLY EPOXY BONDING AGENT
PRIOR TO PLACEMENT OF FRESH
CONCRETE ACCORDANCE WITH
MANUFACTURERS
RECOMMENDATIONS
EXISTING
CONCRETE BEAM
L6x6x3/8
DECK,
SEE PLAN
(6) 1/2" DIA. x 2 3/4"
EMBED. ADHESIVE
ANCHORS
BEAM
SEE PLAN
1 1/2"
1/
2"
NOTE:
1. DO NOT DAMAGE EXISTING REINFORCING DURING ANCHOR
INSTALLATION. LOCATE EXISTING REINFORCING THROUGH
NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP
DRAWINGS FOR REVIEW.
3/8" STIFF. PL.
EA. SIDE
WORK POINT
STEEL BEAM, SEE PLAN
BEAM
BRACEBRACE
1/2" GUSSET PL.
ERECTION BOLT
SLOT TUBE FOR
CONNECTION TO
GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
1/4 6
EA. SIDE
1/4 18 MIN.
TYP.
T/ STL
SEE PLAN
CENTER BETWEEN COLUMNS U.N.O.
CENTERED ON
STIFF PL LOCATION
3/16
TYP
1/2"
1 1/2"3"
1 1/2"
1/2"
1 1/2"3"
1 1/2"
3/8"x4 1/2"x1'- 4 1/2"
PLATE
BACK TO BACK
ANGLE BRACE,
SEE ELEVATIONS
3/4"DIA. ASTM
A325 BOLTS
1/2
2"
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STEEL DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S501
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
3" = 1'-0"S501
1 TYPICAL COPE DETAIL
3/4" = 1'-0"S501
2 TYPICAL BEAM TO BEAM CONNECTION
1 1/2" = 1'-0"S501
3 TYPICAL BEAM TO HSS COLUMN DETAIL AT ROOF
1 1/2" = 1'-0"S501
TYPICAL SINGLE BRACE
CONNECTION DETAIL BELOW BEAM
1 1/2" = 1'-0"S501
TYPICAL SINGLE BRACE
CONNECTION DETAIL ABOVE BEAM
3/4" = 1'-0"S501
7 POST TO BEAM SECTION
3/4" = 1'-0"S501
8 TYPICAL SECTION THRU COMPOSITE SLAB
1 1/2" = 1'-0"S501
9 WIDE FLANGE TO CONCRETE BEAM CONNECTION
1 1/2" = 1'-0"S501
10 CHEVRON BRACE CONNECTION DETAIL
1 1/2" = 1'-0"S501
6 BACK TO BACK ANGEL BRACE CONNECTION
4' -0
N
E W
W O
R K
E X
IS
T
IN
G
E L E V A T O R T O W E R C O L U M N & F O U N D A T I O N S C H E D U L E
COLUMN MARK F.1-3.6 F.2-1.7 F.9-3.1F.2-3.1 F.9-1.7
H S
S x7 x3
/8
MACHINE ROOM FLOOR
EL. 783.05'
5th FLOOR
EL. 764.55'
4th FLOOR
EL. 753.55'
3rd FLOOR
EL. 742.55'
2nd FLOOR
EL. 731.55'
GROUND FLOOR
EL. 708.55'
FOUNDATION
W
X
MACHINE ROOM
ROOF EL. 792.38'
PC-4B
H S
S x7 x1
/2
H S
S x7 x3
/8
H S
S x7 x5
/8
S.P.D. ROOF & 1st FLOOR
EL. 720.55'
ELEVATION
16"x 16"
CONC. PIER
TOP EL.
709.17'
16"x 16"
CONC. PIER
TOP EL.
709.17'
16"x 16"
CONC. PIER
TOP EL.
709.17'
16"x 16"
CONC. PIER
TOP EL.
709.17'TOP OF FOUNDATION
EL. 777.05'
6th FLOOR
PC-16 PC-16 PC-16 PC-16
704.55' 703.38' 703.38' 703.38' 703.38'
TOP OF COLUMN
EL. 724.55' FIELD VERIFY
H S
S x7 x3
/8
H S
S x7 x1
/2
H S
S x7 x3
/8
H S
S x7 x5
/8
H S
S x7 x3
/8
H S
S x7 x1
/2
W
X
W
X
H S
S x7 x3
/8
H S
S x7 x5
/8
H S
S x7 x3
/8
H S
S x7 x1
/2
W
X
H S
S x7 x3
/8
H S
S x7 x5
/8
EXISTINGEXISTINGEXISTINGEXISTINGEXISTING
E X
IS
T
E X
IS
T
E X
IS
T
E X
IS
T
E X
IS
T
EXIST. EXIST. EXIST. EXIST.
F
IE
LD
V
E R
IF
Y
7"
11/2" 2" 2" 11/2"
1'- 01 / 2"
11 / 2" 3" 13 / 4"
13 / 4"3" 11 / 2"
11 / 2" 11 / 2"
11 / 2" 3"
3" 11 / 2"
11/4"
23/4" 23/4"
11/4"
1'- 01 / 2"
FIN
IS
H
TO
B
EA
R
FIN
IS
H
TO
B
EA
R
PL.-8"x 3/8"x 12 1/2" W/ 8
3/4"∅ A325 SC BOLTS (EA. SIDE )
PL.-7"x 3/8"x 6" W/ 4
3/4"∅ A325 SC BOLTS
6"
FIN
IS
H
TO
B
EA
R
FIN
IS
H
TO
B
EA
R
WIDE FLANGE COLUMN
S502
TYP. @ WIDE
FLANGE
S502
TYP AT
TUBE
S502
S502
TYP
E X
IS
T
IN
G
H S
S C
O
LU
M N
CJP
1" x COLUMN WIDTH x
COLUMN DEPTH PLATE
NEW COLUMN
CJP
CJP
1" x COLUMN WIDTH x
COLUMN DEPTH PLATE
NEW COLUMN
CJP
NEW COLUMN
E X
IS
T
IN
G
C O
LU
M
N
CJP
1" x COLUMN WIDTH x
COLUMN DEPTH PLATE
NEW COLUMN
CJP
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STEEL DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S502
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
NTSS502
1 HSS COLUMN SPLICE DETAIL
1 1/2" = 1'-0"S502
2 WIDE FLANGE COLUMN SPLICE DETAIL
3/16" = 1'-0"S502
3 HSS COLUMN SPLICE DETAIL
3/16" = 1'-0"S502
4 COLUMN SPLICE DETAIL
1'- 0" 7"
21 / 4"
5/8" 7"
51 / 2"
2"
3"
TO FOB
3/16
3/16
3/16
1.7
SEE ARCH. FOR
BRICK -
SEE ARCH.
TOP PL.-6 1/2"x 5/16"x 5 1/2" W/
2-M20 BLIND BOLTS @ 3" O/C
SEAT PL.-6 1/2"x 3/8"x 5 1/2" W/
2-M20 BLIND BOLTS @ 3" O/C
L6x6x3/8
STIFF. PL.-7 1/2"x 3/8"x 12"
DOUBLER PL.-16 1/2"x 5/8"x 5 1/2"
METAL STUD WALL
CENTERED ON SEAT PLATE &
CENTERED ON COLUMN
SLAB, SEE PLAN
CENTERED ON STIFF. PLATE
DOUBLER PLATE
DOUBLER PL.
SEAT PL.
STIFF. PL.
BEAMS NOT SHOWN
MACHINE ROOM FLOOR
SLAB PLAN
SEE PLAN
HSS COL,
SEE PLAN
BEAM,
SEE PLANBEAM,
SEE PLAN
NOTE:
STUDS NOT SHOWN FOR CLARITY
2'-10 1/2"7"
SEE PLAN
TO FOB
3/16 2-12
CL
SEE ARCH. FOR
METAL STUD WALL
SLAB, SEE PLAN
DECK, SEE PLAN
SLAB PLAN
MACHINE ROOM
HSS8x4x3/8 (LSV)
STUB,
SEE PLAN
COLUMN,
SEE PLAN
BEAM,
SEE PLAN
3/8" GUSSET
1/4
L6x6x3/8
SEE 2/S505
FOR
CONNECTION
DETAILS
9"7"
1'- 0"2"
C L R
3/4"
1'-2"
TO FOB 2-12
3/16 2-12
3/16 2-12
1/4
CJP
/4
F.9
SEE ARCH. FOR
METAL STUD WALL
BRICK -
SEE ARCH.
BEAM, SEE PLAN
HSS, SEE PLAN
HSS , SEE PLAN
L6x6x3/8
HOISTWAY
2-#4 CONT.
HSS COL., SEE PLAN
PL. 1'-9"x 1/4" CONT.
POUR STOP BY
DECK FABRICATOR
LAP 2'-0"
3/4" DIA X 4" HEADED STUDS
AT 1'-0" O.C. UNIFORMLY SPACED
1' -9
1' -2
7"
1'- 7" 2'-0"
1'-5" 7"
4"
4"
9"
9" 2'-10"
TO FOB
T O
F O
B
3/16"
3/16 T&B
3/16
3/16
3/16
F
1.7
F.2
L6x6x3/8
L6x6x3/8
PL.5/16"x 3"x 0'-7" T&B
BRICK -
SEE ARCH.
L6x6x1/4x0'-6" LONG
TOP TIE-BACK: 6-1/2x3x1/4 x
5" BENT PLATE SLV. TOP OF
TIE-BACK = TOP OF HSS
8x4. HERE & AT COL. F.9.
HSS COL,
SEE PLAN
BEAM,
SEE PLAN
BEAM,
SEE PLAN
BEAM,
SEE PLAN
BEAM,
SEE PLAN
BEAM, SEE
PLAN
HSS8x4
(LSV)
3/8" GUSSET A
A
A - A
3/16
1/4
S504
BEAM,
SEE PLAN
BEAM,
SEE PLAN
3/16
3/16
3 SIDES
TYP.
COPE AS
REQUIRED
L4x4x1/4x0'-6"
LONG
BEAM, SEE
PLAN
BEAM, SEE
PLAN
4"x4"x1/4x0'-6" LONG
BENT PLATE
3/16
TYP
3/16
TYP.
NOTE:
SIM CONDITION OCCURS AT
WIDE FLANGE
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STEEL DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S503
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1 1/2" = 1'-0"S503
1 SECTION
1 1/2" = 1'-0"S503
2 SECTION
1 1/2" = 1'-0"S503
3 SECTION
1 1/2" = 1'-0"S503
4 PLAN DETAIL
1" = 1'-0"S503
5 CONNECTION DETAIL
1" = 1'-0"S503
6 CONNECTION DETAIL
1'-0"7" 9"
21 / 4"
5/8"10"
51 / 2"
2"
5"
8"
51 / 4"2"
TO FOB
3/16
3/16
3/16
3/16 3-12
3/16
ANGLE TO COL.
PLATE TO TUBE
1/4 3
1" END RETURN
TOP & BOT.
2-12
1/4 3
1" END RETURN
TOP & BOT.
3/16 3-12
1.7
SEE ARCH. FOR
BRICK - SEE ARCH.
SEAT PL.-10"x 3/8"x 5 1/2" W/
2-M20 BLIND BOLTS @ 3" O/C
L6x6x3/8
METAL STUD WALL
CENTERED ON STIFF. PLATE
DOUBLER PL.
SEAT PL.
STIFF. PL.
2-#4 CONT.
LAP 2'-0"
TOP TIE-BACK ANGLE: 6 1/2x3x1/4 x 5" SLV BENT PLATE
TOP OF BENT PLATE = TOP OF HSS
DOUBLER PL.-16 1/2"x 5/8"x 5 1/2"
CENTERED ON COLUMN
STIFF. PL.-10"x 3/8"x 12"
CENTERED ON SEAT PLATE &
DOUBLER PLATE
COORD. ELEV.
WITH ARCH.
3/4" DIA X 4" HEADED STUDS
AT 1'-0" O.C. UNIFORMLY SPACED
NOTE:
1. FIREPROOFING SHOWN FOR REFERENCE, REFER TO
ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR
REQUIREMENTS
2. STUDS NOT SHOWN FOR CLARITY.
SEE PLAN
HSS COL,
SEE PLAN
BEAM,
SEE
PLAN
BEAM,
SEE
PLAN
3/8"x1'-9"x CONT. A36 PLATE
BRICK -
SEE ARCH.
2'-10"7"
TO FOB
3/16 2-12
F.2
SEE ARCH. FOR
METAL STUD WALL
SLAB, SEE PLAN
DECK, SEE PLAN
SLAB PLAN
MACHINE ROOM
BEAM, SEE
PLAN
BEAM,
SEE PLAN
COLUMN,
SEE PLAN
3/8" GUSSET
SEE PLAN
L6x6x3/8
1/4 T&B
1/4
S E
E A
R C
H
SEE 3/S505 FOR
CONNECTION DETAILS
NOTE:
1. STUDS NOT SHOWN FOR CLARITY.
1"
SEE PLAN
DECK, SEE PLAN
WWF 6x6-W2.9xW2.9
3/8" STIFFENER PLATE,
PROVIDE VERTICAL LONG
SLOTTED HOLES ON
CONNECTION SIDE
W16
EXISTING STRUCTURE
REMOVE
EXISTING BRICK
2L8x6x3/8x1'-0"
LONG
1/
2"
9"
1/
2"
1 1/2" 1 1/2"
4 1/2" 4 1/2"A
A
A - A
1/
2"
9"
1/
2"
2"
2"
(2) 3/4" DIA. ASTM
A325 BOLTS
(4) 1/2" x 2 3/4"
EMBED HILTI HY200
ANCHORS
2L8X6x3/8x1'-0" LONG
EXISTING
CONCRETE BEAM
SADFASDF
NOTE:
1. DO NOT DAMAGE EXISTING REINFORCING DURING ANCHOR
INSTALLATION. LOCATE EXISTING REINFORCING THROUGH
NON-DESTRUCTIVE MEANS PRIOR TO SUBMISSION OF SHOP
DRAWINGS FOR REVIEW.
BEAM, SEE
PLAN
HSS8x4
3/8" GUSSET
A
A
A - A
3/16 T Y
P
1/ 2"
3/8" GUSSET
3/16
TYP.
BEAM,
SEE PLAN
BEAM,
SEE PLAN
3/8" GUSSET
3/16
TYP.
BEAM,
SEE PLAN
BEAM,
SEE PLAN
1/4"x3"TALLxCONT BENT PLATE.
LEG LENGTH VARIES BASED ON
DECK, SEE PLAN
3/16 2@12''
ROOF DECK
SEE PLAN
S E
E A
R C
H
SEE ARCH FOR
METAL STUD WALL
STUD CONNECTION
TO STEEL , ALLOW
FOR ±1" MOVEMENT
3/16 2@12''
ROOF DECK
1/4"x3"TALLxCONT BENT PLATE.
LEG LENGTH VARIES BASED ON
DECK, SEE PLAN
SEE PLAN
S E
E A
R C
H
SEE ARCH FOR
METAL STUD WALL
STUD CONNECTION
TO STEEL , ALLOW
FOR ±1" MOVEMENT
BRICK,
SEE ARCH
BEAM, SEE PLAN
BEAM,
SEE PLAN
5 1/4"x9"x1/4"
BENT PLATE
5 1/4"x3"x1/4"
BENT PLATE
3/16
L5x5x3/8
3/16 2@12
3/16 2@12
9"
SLAB, SEE
PLAN
A R
C H
S E
E
COLUMN,
SEE PLAN
BEAM,
SEE PLAN
3/4"x9"x1'-0" COLUMN
CAP PLATE1/4
3/16
1' - 0"
3/16
3/8" STIFFENER
PLATES EA. SIDE
COLUMN,
SEE PLAN
BEAM,
SEE PLAN
3/4"x7"x0'-9" COLUMN
CAP PLATE
1/4
3/16
9"
3/8" STIFFENER
PLATES EA. SIDE
3/16
BEAM,
SEE PLAN
SLAB,
SEE PLAN
1/4"x5/14" TALLxCONT
BENT PLATE.
3/16
PLAN
SEE
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STEEL DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S504
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1 1/2" = 1'-0"S504
1 SECTION
1 1/2" = 1'-0"S504
2 SECTION
1 1/2" = 1'-0"S504
3 SECTION
1 1/2" = 1'-0"S504
5 CONNECTION DETAIL
1 1/2" = 1'-0"S504
6 CONNECTION DETAIL
1 1/2" = 1'-0"S504
7 PERPENDICULAR ROOF DECK EDGE DETAIL
1 1/2" = 1'-0"S504
8 PARALLEL ROOF DECK EDGE DETAIL
1" = 1'-0"S504
9 SECTION
1" = 1'-0"S504
10 SECTION AT TOP OF COLUMN
1" = 1'-0"S504
11 SECTION AT TOP OF COLUMN
1 1/2" = 1'-0"S504
4 SECTION
SEE PLAN
E.O.D.
3/8" GUSSET EA SIDE
OF BEAM AT 4'-0" O.C.
L6x6x3/8xCONT
2L3x3x3/8 AT 4'-0" O.C.
3/16
EA SIDE
3/16
TYP
3/16
TYP
S E
E A
R C
H
BEAM,
SEE PLAN
COLUMN
SEE PLAN
NOTE:
1. CONNECTION DESIGN BY CONTRACTORS CONNECTION DESIGN
ENGINEER. SEE PLANS FOR CONNECTION FORCES.
2. BOLTED MOMENT CONNECTION CAN BE USED AT CONTRACTORS OPTION.
TYP.
SINGLE PLATE
CONNECTION
STIFFENER PLATE
AS REQUIRED
PLATE
W S
FP WELD. OPTIONAL IF
SINGLE PLATE NOT
PROVIDED
HSS COLUMN,
SEE PLAN
TYP
SINGLE PLATE
CONNECTION
PLATE WITH CUT-OUT
FOR HSS
B Y
D E
S
IG
N A
S R
E Q
U
IR
E D
M
IN3"
NOTE:
1. CONNECTION DESIGN BY CONTRACTORS CONNECTION DESIGN ENGINEER.
SEE PLANS FOR CONNECTION FORCES.
2. BOLTED MOMENT CONNECTION CAN BE USED AT CONTRACTORS OPTION.
A A
A-A
BEAM,SEE PLANBEAM,SEE PLAN
L8"x6"x7/16"xCONT
AT ELEVATOR DOOR
BEAM,
SEE PLAN
3.1
SLAB,
SEE PLAN
SEE PLAN
3/16
COORDINATE WITH
ELEVATOR MANUF.
1/2" DIA.x 2'-0" LONG
DEFORMED BAR
ANCHOR AT 1'-0" O.C.
3/16 3/16 2@12
BEAM, SEE PLAN
HSS COLUMN,
SEE PLAN
BEAM
BRACE
W.P.
1/2" GUSSET PL.
ERECTION BOLT (AT
CONTRACTOR'S OPTION)
SLOT TUBE FOR CONNECTION
TO GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
5/16 6
EA. SIDE
1/4 6 MIN
TYP
T/ STL
SEE PLAN
CL
1/4 6" MIN
1/4
3/4" CAP PLATE AT
TOP OF COLUMN
3/8" STIFFENER
PLATES EA. SIDE
3/16
3/16
1/4 3" MIN
EA. SIDE
1/4 6" MIN
TYP
T/ STL
SEE PLAN
CL
BEAM,SEE PLAN
BEAM
BRACE
W.P.
1/2" GUSSET PL.
ERECTION
BOLT
SLOT TUBE FOR CONNECTION
TO GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
BEAM
1/4 6" MIN
EXISTING BEAM
EXISTING COLUMN
EXISTING BEAM
HSS8x8x3/8x1'-8" LONG
1/4" CAP PLATE TYP.
1/8
TYP.
1/4
TYP.
1/4
TYP.
1/8
1/4" CAP
PLATE TYP.
HSS8x8x3/8"x1'-0" LONG
3/16
TYP.
3/16
TYP.
F.9
3.1
TYP
BACKING
BAR, TYP.BEAMS, SAME DEPTH
3/8" PLATE
NOTE:
1. CONNECTION DESIGN BY CONTRACTORS CONNECTION DESIGN
ENGINEER. SEE PLANS FOR CONNECTION FORCES.
2. BOLTED MOMENT CONNECTION CAN BE USED AT CONTRACTORS OPTION.
1/4 3" MIN
EA. SIDE
1/4 6" MIN
TYP
T/ STL
SEE PLAN
CL
BEAM,SEE PLAN
BEAM
BRACE
W.P.
1/2" GUSSET PL.
ERECTION
BOLT
SLOT TUBE FOR CONNECTION
TO GUSSET PL.
HSS BRACE,
SEE BRACED FRAME
ELEVATIONS
BEAM
1/4 6" MIN
COLUMN,
SEE PLAN
DECK SEE PLAN
BEAM SEE PLAN
PARAPET STUD SAME
AS WALL STUD BELOW.
TRACK TOP AND BOTTOM
3/16
L3x3x1/4xCONTS E
E A
R C
H
E.O.D SEE PLAN
BEAM SEE PLAN
3380 Trickum Road
Woodstock, GA. 30188 770-517-5507 voice 770-517-5508 fax
Bldg. 500, Ste. 100 www.ieiusa.com
INCORPORATED
INNOVATIVE
ENGINEERING
Veterans Affairs
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
Date:
Drawing Title:
Approved: Project Director
Project Title:
1 2 3 4 5 6 7 8 9
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT
F ile
P a th
A
B
C
D
E
F
U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
Drawn
Revisions:
STEEL DETAILS W.G. (BILL) HEFNER VAMC
BUILDING 2 ELEVATOR
INSTALLATION SPS/ SURGERY
SALISBURY, NC 28144
S505
659-20-202
06-10-2022
CONTRACT DOCUMENTS
DCASLW
1" = 1'-0"S505
1 SECTION AT RELIEF ANGLE
1 1/2" = 1'-0"S505
CONCEPTUAL MOMENT
CONNECTION DETAIL AT FLOOR
1" = 1'-0"S505
CONCEPTUAL MOMENT
CONNECTION AT HSS COLUMN
1 1/2" = 1'-0"S505
4 SECTION
1 1/2" = 1'-0"S505
TYPICAL SINGLE BRACE
CONNECTION DETAIL BELOW BEAM
1 1/2" = 1'-0"S505
SINGLE BRACE MOMENT
CONNECTION DETAIL ABOVE BEAM
1" = 1'-0"S505
7 ENLARGED PLAN AT EXIST COLUMN
1" = 1'-0"S505
CONCEPTUAL WELDED
BEAM MOMENT CONNECTION
1 1/2" = 1'-0"S505
SINGLE BRACE MOMENT
CONNECTION DETAIL ABOVE BEAM
1" = 1'-0"S505
10 SECTION
| 02 CONTRACT DOCUMENTS - Structural.pdf |
| Sheets |
| S002 - STRUCTURAL NOTES |
| S101 - GROUND AND FIRST FLOOR PLANS |
| S102 - FIRST AND SECOND FLOOR FRAMING PLANS |
| S103 - THIRD AND FOURTH FLOOR FRAMING PLANS |
| S104 - FIFTH AND SIXTH FLOOR FRAMING PLANS |
File details come from the government source that posted it. Updated .