This contract documents package is for the City of Weatherford, Texas, prepared by Teague Nall & Perkins, Inc., for the Northeast Water Line Improvements project. The project consists of constructing approximately 5,385 linear feet of 8-inch PVC water pipe and 675 linear feet of 24-inch PVC water pipe, along with associated appurtenances including water service lines, gate valves, fire hydrant assemblies, and related infrastructure. The bid package includes 40 pay items covering pipe installation, fittings, valve installation, service connections, pavement repair, trench safety, traffic control, and surface restoration. Sealed bids must be submitted to the Purchasing Department at 303 Palo Pinto Street, Weatherford, Texas 76086, prior to 2:00 PM on June 2, 2026, with public opening at the City of Weatherford Council Chambers. Contract documents have been available for download beginning May 11, 2026, without charge through Civcast (www.civcastusa.com) or physical examination at Teague Nall & Perkins' office. No pre-bid conference will be held. The contract period requires substantial completion within 210 calendar days and final completion within 240 calendar days from the Notice to Proceed, with an anticipated project schedule showing contract award at June 25, 2026, execution by July 27, 2026, preconstruction meeting August 3, 2026, and Notice to Proceed on August 10, 2026.
Bidders must submit a five percent bid security via certified check, money order, or bid bond. The contract is awarded on a unit price basis, with the total contract price calculated as the sum of unit prices multiplied by estimated quantities. Progress payments are made monthly at 90 percent of completed work with 10 percent retainage held until final completion. Liquidated damages are assessed at $1,000 per calendar day for failure to achieve substantial completion, continuing until final completion. The Successful Bidder must execute the Agreement within 15 days of Notice of Award and provide performance, payment, and two-year maintenance bonds. Contractor must obtain all necessary lands and access for temporary facilities, while the Owner obtains easements for permanent structures. The contract documents include General Conditions, Supplementary Conditions, Technical Specifications, and construction plans (bound separately), along with required forms including Certificate of Interested Parties (Form 1295) and Texas Government Code Verifications. The City reserves the right to reject any and all bids and waive all informalities not involving price, time, or changes to the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-011 HVAC - JC.JCA.Courthouse.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
Northeast Water Line Improvements
OWNER:
City of Weatherford
Matt Leppla, P.E., Director of Public Works
Prepared By:
5237 N. Riverside Drive, Suite 100 Fort Worth, Texas 76137
817.336.5773 phone www.tnpinc.com TNP Firm Registrations
TX-PELS: ENGR F-230; SURV 1001 1600, 1001 1601, 10194381
TX-AE: BR 2673
MAY 2026
http://www.tnpinc.com/
THIS PAGE WAS INTENTIONALLY LEFT BLANK
Table of Contents Page 1 of 1
TABLE OF CONTENTS
DIVISION 00 CONTRACTUAL DOCUMENTS
Section
00000 Notice to Bidders
00010 Instructions to Bidders
00020 Bid Form
00030 Agreement
00040 Authorized Agent Affidavit
00050 Certificate of Interested Parties-Form 1295
00060 Texas Government Code Verifications
00070 Certificate of Insurance
00080 Performance Bond
00090 Payment Bond
00100 Maintenance Bond
00110 Notice of Award
00120 Notice to Proceed
00130 Certificate of Substantial Completion
00140 Contractor’s Affidavit of Final Payment
00150 Change Order
00160 Description of Pay Items
DIVISION 01 GENERAL CONDITIONS
DIVISION 02 SUPPLEMENTARY CONDITIONS
DIVISION 03 TECHNICAL SPECIFICATIONS
DIVISION 04 CONSTRUCTION PLANS
(Bound Separately)
NOTICE TO BIDDERS
CITY OF WEATHERFORD
Notice is hereby given that the City of Weatherford is now accepting bids for the construction of water line improvements. All bids must be sealed and clearly marked “SEALED BID 2026-011 Northeast Water Line
Improvements” and returned to the Purchasing Department, 303 Palo Pinto Street, Weatherford, Texas 76086 prior to
2:00 PM, June 2, 2026 at which time they will be publicly opened and read aloud at the City of Weatherford Council
Chambers, 303 Palo Pinto, Weatherford, Texas. The City reserves the right to reject any and all bids received.
The project generally consists of constructing approximately 5,385 linear feet of 8” and 675 linear feet of 24” water line.
The contract documents, including plans, for this project will be available beginning at 8:00 AM on Monday May 11, 2026. The plans and contract documents may be examined without charge at the office of Teague Nall & Perkins, Inc.
at 5237 N. Riverside Drive, Suite 100, Fort Worth, TX 76137. Contact Zach Graves, P.E., (817)-665-7185. The plans, contract documents and other information may also be obtained at no charge from Civcast at www.civcastusa.com. It is the downloader’s responsibility to determine that a complete set of documents, as defined in the Instructions to
Bidders, are received.
A bid bond in the amount of five percent (5%) of the bid, issued by an acceptable surety, shall be submitted with each bid.
http://www.civcastusa.com/
Instructions to Bidders 00010-1
INSTRUCTIONS TO BIDDERS
DEFINED TERMS
Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and
Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office-The office from which the Bidding Documents are to be issued and where the bidding procedures are to be administered.
COPIES OF BIDDING DOCUMENTS
Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the
Advertisement or Invitation to Bid may be obtained from the Issuing Office. No refunds shall be made.
Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding
Documents.
Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
QUALIFICATIONS OF BIDDERS
To demonstrate Bidder’s qualifications to perform the Work, within five days of Owner’s request, Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be requested.
EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE
Subsurface and Physical Conditions
A. The Supplementary Conditions identify:
Those reports of explorations and tests, if any, of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.
Those drawings of physical conditions in or relating to existing surface and subsurface structures at or contiguous to the Site (except Underground Facilities) that Engineer has used in preparing the Bidding
Documents.
Underground Facilities
A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground
Facilities at or contiguous to the Site is based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.
Hazardous Environmental Condition
A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental
Condition identified at the Site, if any, that Engineer has used in preparing the Bidding Documents.
Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the
Bidding Documents due to differing or unanticipated conditions appear in Paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed
Instructions to Bidders 00010-2 at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract
Documents to be within the scope of the Work appear in Paragraph 4.06 of the General Conditions.
On request, Owner will provide Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. Bidder shall comply with all applicable Laws and Regulations relative to excavation and utility locates.
Reference is made to Article 7 of the General Conditions for the identification of the general nature of other work that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) that relates to the Work contemplated by these Bidding Documents. On request, Owner will provide to each
Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.
It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, the other related data identified in the Bidding
Documents, and any Addenda;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests, if any, of subsurface conditions at or contiguous to the Site and all drawings, if any, of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the
Supplementary Conditions as provided in Paragraph 4.02 of the General Conditions, and (2) reports and drawings, if any, of Hazardous Environmental Conditions at the Site which have been identified in the
Supplementary Conditions as provided in Paragraph 4.06 of the General Conditions;
E. obtain and carefully study (or accept consequences of not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;
I. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work.
The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and
Instructions to Bidders 00010-3 furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
PRE-BID CONFERENCE
No pre Bid conference will be held.
SITE AND OTHER AREAS
The Site is identified in the Bidding Documents. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by Owner unless otherwise provided in the Bidding
Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor.
INTERPRETATIONS AND ADDENDA
All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding
Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered.
Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed advisable by Owner or Engineer.
BID SECURITY
A Bid must be accompanied by Bid security made payable to Owner in an amount of FIVE percent (5%) of
Bidder’s maximum Bid price and in the form of a certified check or bank money order or a Bid bond issued by a surety meeting the requirements of Paragraphs 5.01 and 5.02 of the General Conditions.
The Bid security of the Successful Bidder will be retained until such Bidder has executed the Contract
Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract
Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other
Bidders whom Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
Bid security of other Bidders whom Owner believes do not have a reasonable chance of receiving the award will be returned within seven days after the Bid opening.
CONTRACT TIMES
The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Agreement.
LIQUIDATED DAMAGES
Provisions for liquidated damages, if any, are set forth in the Agreement.
Instructions to Bidders 00010-4
SUBSTITUTE AND “OR-EQUAL” ITEMS
The Contract, if awarded, will be on the basis of materials and equipment specified or described in the
Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement.
SUBCONTRACTORS, SUPPLIERS, AND OTHERS
If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, individuals, or entities to be submitted to Owner in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by Owner. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.
If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities.
Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any
Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to revocation of such acceptance after the Effective Date of the Agreement as provided in Paragraph 6.06 of the General Conditions.
Contractor shall not be required to employ any Subcontractor, Supplier, individual, or entity against whom
Contractor has reasonable objection.
PREPARATION OF BID
The Bid Form is included with the Bidding Documents. Additional copies may be obtained from Engineer.
All blanks on the Bid Form shall be completed by printing in ink or by typewriter and the Bid signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each unit price item, listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.
A Bid by a corporation shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.
A Bid by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown below the signature.
A Bid by an individual shall show the Bidder’s name and official address.
A Bid by a joint venture shall be executed by each joint venturer in the manner indicated on the Bid Form.
The official address of the joint venture shall be shown below the signature.
All names shall be typed or printed in ink below the signatures.
Instructions to Bidders 00010-5
The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
The address and telephone number for communications regarding the Bid shall be shown.
The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the
Project is located or covenant to obtain such qualification prior to award of the Contract. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
BASIS OF BID; COMPARISON OF BIDS
Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid schedule.
B. The total of all estimated prices will be the sum of the products of the estimated quantity of each item and the corresponding unit price. The final quantities and Contract Price will be determined in accordance with
Paragraph 11.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words.
The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in Paragraph 11.02 of the General
Conditions.
SUBMITTAL OF BID
With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the following data:
A. List of Proposed Suppliers
B. List of Project References
C. Completed Texas Government Code Verifications
D. Completed Certificate of Interested Parties Form 1295
E. Any of these forms not provided with the Bid Form shall be provided within three (3) days from the bid opening or the bid may be considered unresponsive.
A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the
Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” All mailed bids must be received by the bid opening time specified in the Advertisement for Bidders. All mailed bids received after the bid opening time will be rejected. A mailed Bid shall be addressed to:
Purchasing Department
City of Weatherford
303 Palo Pinto Street
Weatherford, TX 76086
Instructions to Bidders 00010-6
MODIFICATION AND WITHDRAWAL OF BID
A Bid may be modified or withdrawn by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.
If within 24 hours after Bids are opened, any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the
Work.
OPENING OF BIDS
Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
BIDS TO REMAIN SUBJECT TO ACCEPTANCE
All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
EVALUATION OF BIDS AND AWARD OF CONTRACT
Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner further reserves the right to reject the Bid of any
Bidder whom it finds, after reasonable inquiry and evaluation, to not be responsible. Owner may also reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder. Owner also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that
Bidder has an interest.
In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of
Award.
In evaluating Bidders, Owner will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.
If the Contract is to be awarded, Owner will award the Contract to the Bidder whose Bid is in the best interests of the Project.
CONTRACT SECURITY AND INSURANCE
Article 5 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it shall be accompanied by such bonds.
Instructions to Bidders 00010-7
SIGNING OF AGREEMENT
When Owner gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to Owner. Within ten days thereafter, Owner shall deliver one fully signed counterpart to Successful Bidder with a complete set of the
Drawings with appropriate identification.
SALES AND USE TAXES
Owner is exempt from local and state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-6.10 of the Supplementary
Conditions for additional information.
RETAINAGE
Provisions concerning retainage are set forth in the Agreement.
Bid Form 00020-1
BID FORM
For construction of
TABLE OF ARTICLES
Article Article No.
Bid Recipient
Bidder’s Acknowledgements
Bidder’s Representations
Further Representations
Basis of Bid
Time of Completion
Attachments to this Bid
Defined Terms
Bid Submittal
Bid Form 00020-2
BID RECIPIENT
This Bid is submitted to:
Purchasing Department
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City of
Weatherford in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
BIDDER’S ACKNOWLEDGEMENTS
Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of
Owner.
BIDDER’S REPRESENTATIONS
In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the
Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No. Addendum Date
B. Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in SC-
4.02, and (2) reports and drawings of Hazardous Environmental Conditions that have been identified in
SC-4.06.
Bid Form 00020-3
E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding
Documents to be employed by Bidder, and safety precautions and programs incident thereto.
F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
I. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to
Bidder.
J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
K. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.
FURTHER REPRESENTATIONS
Bidder further represents that:
A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
BASIS OF BID
Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
1 1 LS Mobilization, Insurance, and Bonds
DOLLARS AND
CENTS PER LS
2 1 LS Site Preparation
DOLLARS AND
CENTS PER LS
3 5,385 LF 8" PVC Water Pipe by Open Cut
DOLLARS AND
CENTS PER LF
4 675 LF 24" PVC Water Pipe by Open Cut
DOLLARS AND
CENTS PER LF
5 240 LF 16" Pressure Rated PVC Casing Pipe (>150 psi) (for 8" PVC Carrier
Pipe)
DOLLARS AND
CENTS PER LF
6 5.5 TON Ductile Iron Water Fittings
DOLLARS AND
CENTS PER TON
7 36 EA 1" Long Water Service (by Open Cut) with Meter Box and
Connection to Existing Meter
DOLLARS AND
CENTS PER EA
8 2 EA 1" Long Water Service (by Open Cut) with Traffic Rated Meter Box and Connection to Existing Meter
DOLLARS AND
CENTS PER EA
9 2 EA 1" Long Water Service (by Open Cut) with Traffic Rated Meter Box and Connection to Proposed Meter
DOLLARS AND
CENTS PER EA
10 2 EA 1" Long Water Service (by Open Cut) with Meter Box and
Connection to Proposed Meter
DOLLARS AND
CENTS PER EA
11 31 EA 1" Short Water Service (by Open Cut) with Meter Box and
Connection to Existing Meter
DOLLARS AND
CENTS PER EA
Northeast Water Line Improvements
UNIT PRICE BID FORM
ITEM NO.
ITEM DESCRIPTION
PRICES TO BE WRITTEN IN WORDS
UNIT PRICE TOTAL PRICEESTIMATED QUANTITY
Bid Form 00020-4
Unit Price Bid Form
ITEM NO.
ITEM DESCRIPTION
PRICES TO BE WRITTEN IN WORDS
UNIT PRICE TOTAL PRICEESTIMATED QUANTITY
12 1 EA 1" Short Water Service (by Open Cut) with Traffic Rated Meter Box and Connection to Existing Meter
DOLLARS AND
CENTS PER EA
13 1 EA 1" Short Water Service (by Open Cut) with Meter Box and
Connection to Existing Double Meter
DOLLARS AND
CENTS PER EA
14 1 EA 1" Short Water Service (by Open Cut) with Meter Box and
Connection to Proposed Meter
DOLLARS AND
CENTS PER EA
15 6 EA Fire Hydrant Assembly (Incl. 6" Gate Valve and 6" lead)
DOLLARS AND
CENTS PER EA
16 24 EA 8" Gate Valve & Box
DOLLARS AND
CENTS PER EA
17 2 EA 24" Gate Valve & Box
DOLLARS AND
CENTS PER EA
18 13 EA Connect to Existing Water Line
DOLLARS AND
CENTS PER EA
19 2 EA Connect to Existing Concrete Pressurized Pipe
DOLLARS AND
CENTS PER EA
20 1 EA 3" Air Release Valve
DOLLARS AND
CENTS PER EA
21 28 EA Cut, Plug, & Abandon Existing Water Line
DOLLARS AND
CENTS PER EA
22 2 EA Cut, Plug, & Abandon Existing Sanitary Sewer Line
DOLLARS AND
CENTS PER EA
23 144 LF Remove Existing Sanitary Sewer Line
DOLLARS AND
CENTS PER LF
PRICES TO BE WRITTEN IN WORDS
UNIT PRICE TOTAL PRICEESTIMATED QUANTITY
24 901 LF Remove Existing Water Line
DOLLARS AND
CENTS PER LF
25 2 EA Remove Existing 8"x6" Reducer
DOLLARS AND
CENTS PER EA
26 1 EA Remove Existing 12"x6" Reducer
DOLLARS AND
CENTS PER EA
27 6 EA Remove Existing Fire Hydrant Assemby
DOLLARS AND
CENTS PER EA
28 1 EA Remove Existing Sanitary Sewer Manhole
DOLLARS AND
CENTS PER EA
29 21 EA Abandon/Remove Existing Valve
DOLLARS AND
CENTS PER EA
30 3,917 SY Asphalt Pavement Repair
DOLLARS AND
CENTS PER SY
31 3,917 SY Temporary Asphalt Pavement Repair
DOLLARS AND
CENTS PER SY
32 5 EA Cement Stabilized Sand Around Existing Manhole
DOLLARS AND
CENTS PER EA
33 401 LF Remove & Replace Existing Curb & Gutter
DOLLARS AND
CENTS PER LF
34 6,060 LF Trench Safety
DOLLARS AND
CENTS PER LF
35 1 LS Traffic Control
DOLLARS AND
CENTS PER LS
PRICES TO BE WRITTEN IN WORDS
UNIT PRICE TOTAL PRICEESTIMATED QUANTITY
36 1 LS Surface Restoration and Sodding
DOLLARS AND
CENTS PER LS
37 1 LS Erosion Control
DOLLARS AND
CENTS PER LS
38 68 EA Removal and Replacement of Existing Standard Meter Boxes
DOLLARS AND
CENTS PER EA
39 1 LS Temporary Water Line Allowance
TWENTY THOUSAND
DOLLARS AND
ZERO
CENTS PER LS
20,000$ 20,000$
40 1 LS Construction Allowance
FIFTY THOUSAND
DOLLARS AND
ZERO
50,000$ 50,000$
Total Bid $_________________________
Submitted on ____________________, 20__.
Individual
Partnership
Corporation Firm Name
By: ______________________________________________
Typed or Printed
SIGNATURE______________________________________
TITLE___________________________________________
ADDRESS________________________________________
TELEPHONE______________________________________
Bid Form 00020-5
TIME OF COMPLETION
Bidder agrees that the Work will be substantially complete within 210 calendar days after the date when the
Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions and will be completed and ready for final payment in accordance with Paragraph 14.07.B of the General Conditions within 240 calendar days after the date when the Contract Times commence to run.
The City intends for the Contractor to begin work on the Northeast Water Lines Improvements project as soon as possible. The City’s anticipated project schedule is provided below:
- June 25, 2026 – Contract Awarded at Utility Board Meeting
- July 27, 2026 – Construction Contract Fully Executed
- August 3, 2026 – Anticipated Preconstruction Meeting with the City
- August 10, 2026 – Notice to Proceed Delivered
- April 7, 2027 – Final Completion
Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.
ATTACHMENTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of .
B. List of Proposed Suppliers
C. List of Project References
D. Bidder Qualification Statement with Supporting Data
DEFINED TERMS
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
BID SUBMITTAL
This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed): .
By: . (SEAL)
(Individual’s signature)
Doing business as: .
Bid Form 00020-6
A Partnership
Partnership Name: . (SEAL)
By: .
(Signature of general partner -- attach evidence of authority to sign)
A Corporation
Corporation Name: . (SEAL)
State of Incorporation: .
Type (General Business, Professional, Service, Limited Liability):
(Signature -- attach evidence of authority to sign)
Title: . (CORPORATE
SEAL)
Attest
Date of Authorization to do business in Texas is .
A Joint Venture
Name of Joint Venture: .
First Joint Venturer Name: . (SEAL)
(Signature of first joint venture partner -- attach evidence of authority to sign)
Title: .
Second Joint Venturer Name: . (SEAL)
(Signature of second joint venture partner -- attach evidence of authority to sign)
Bid Form 00020-7
Title: .
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
Bidder's Business Address
Phone No. Fax No.
SUBMITTED on , 2026
Agreement 00030-1
Agreement Between Owner and Contractor
This Agreement is by and between City of Weatherford (Owner) and (Contractor).
Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows:
WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:
The project generally consists of constructing approximately 5,385 linear feet of 8” and 675 linear feet of 24” water line.
THE PROJECT
The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:
Northeast Water Line Improvements
ENGINEER
The Project has been designed by: Teague Nall & Perkins, Inc.
CONTRACT TIMES
Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
Days to Achieve Substantial Completion and Final Payment
A. The Work will be substantially completed within 210 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 240 calendar days after the date when the Contract Times commence to run.
Liquidated Damages
A. The times for Substantial Completion and Final Completion of the Work described herein are reasonable times for the completion of each, taking into consideration all conditions, including but not limited to, the average climatic change and conditions, including differing site conditions, and usual industrial conditions prevailing in this locality.
B. Time is of the essence in this Contract and the deadlines for achieving Substantial Completion and Final Completion will be strictly enforced. Liquidated damages will be assessed against the Contractor for failure to achieve
Substantial Completion by the date established by this Contract and shall continue to be assessed until the Contractor achieves total (100%) Final Completion as required by this Contract. The Contractor and its surety agree that the liquidated damages provisions in this Contract are reasonable, facially valid, are not a penalty, and do not otherwise operate as a penalty.
C. For each and every calendar day that any work remains incomplete after the expiration of the deadline for Substantial
Completion of the Work, including any time extension authorized in writing by the Owner in accordance with Article
12 of the General Conditions, the sum of one thousand Dollars ($1,000) per calendar day may be deducted from the moneys due to the Contractor, or may be charged against the Contractor, not as a penalty, but as liquidated damages, until the date the Work is finally (100%) complete, as determined by the Owner. The Contractor agrees that for
Agreement 00030-2 purposes of Texas Gov’t Code Ch. 2252, a bona fide dispute exists if liquidated damages are assessed under this Contract and the Owner may withhold retainage to satisfy liquidated damages owed to the Owner hereunder.
D. The sum of money thus deducted or charged as liquidated damages is not to be considered as a penalty, but shall be deemed, taken, and treated as reasonable liquidated damages, representing a reasonable estimate of damages, or a reasonable forecast of just compensation, because the harm caused by the breach is incapable or extremely difficult of estimation due to the public nature of the work and the likely loss to be sustained by the Owner and the general public, estimated at or before the time of executing this Contract.
E. Further, the parties acknowledge the Owner’s paramount purposes and duty to protect the “public fisc” and the general health, safety, and welfare of the public, and the parties agree that any alleged disparity between actual and liquidated damages shall be construed as bridgeable and acceptable as a matter of law and public policy and shall be calculated and construed in favor of the Owner.
CONTRACT PRICE
Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts established by unit price for each separately identified item of Unit Price Work times the estimated quantity of that item as indicated in the Bid.
As provided in Paragraph 11.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer as provided in Paragraph 9.07 of the General Conditions. Unit prices have been computed as provided in Paragraph 11.03 of the General Conditions.
PAYMENT PROCEDURES
Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 14 of the General Conditions.
Applications for Payment will be processed by Engineer as provided in the General Conditions.
Progress Payments; Retainage
A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor’s Applications for Payment on or about the 10th day of each month during performance of the Work as provided in Paragraphs 6.02.A.1 and 6.02.A.2 below. All such payments will be measured by the schedule of values established as provided in Paragraph 2.07.A of the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements:
Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Engineer may determine or Owner may withhold, including but not limited to liquidated damages, in accordance with Paragraph 14.02 of the General Conditions:
a) 90 percent of Work completed (with the balance being retainage).
b) 90 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage).
B. “Retainage” means the percentage of the payment withheld in this Contract by the Owner to secure performance of the Contract. The Owner may withhold Retainage in the amount of TEN percent (10%) of the total Contract Price, and the rate of Retainage may not exceed TEN percent (10%) for any item in a bid schedule or schedule of values for the Project, including materials and equipment delivered on site to be installed. The percentage of retainage held on Subcontracts by the Contractor shall not be greater than the percentage withheld from the Contractor by the Owner in accordance with Texas Gov’t Code Ch. 2252.
Until the conditions set forth for final payment have been satisfied by the Contractor, the amount of each monthly Application for Payment must include the value of each line item as indicated on the approved schedule of values, to the extent completed, less Retainage of TEN percent (10%). Retainage will not be released to the Contractor before Substantial Completion, but may be withheld by the Owner until Final Completion. If no bona fide dispute exists and no liquidated damages or other amounts are owed to the Owner, then Retainage will be released to the
Agreement 00030-3
Contractor with final payment after all of the following conditions relating to final payment have been satisfied: (1) the Contractor has fully performed the Contract; (2) the Contractor has completed all Punch List items to the satisfaction of the Owner and the Engineer; (3) the Contractor has delivered to the Owner all Project close-out documents in duplicate, including (a) all maintenance and operating manuals; (b) marked sets of as-built drawings;
(c) all guarantees and warranties required under the Contract Documents; (d) a list of names, addresses, and telephone numbers for all subcontractors and others providing guarantees and warranties; (e) an electronic (PDF) bookmarked single file containing the information required in 3 (a-d) above, that is indexed and searchable; and (4) the applicable governmental authorities have issued to the Owner the final use and certificate of occupancy for the Project.
Final Payment
A. Upon final completion and acceptance of the Work in accordance with Paragraph 14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineer as provided in said Paragraph 14.07.
INTEREST
Not applicable.
CONTRACTOR’S REPRESENTATIONS
In order to induce Owner to enter into this Agreement Contractor makes the following representations:
A. Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.
B. Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Contractor has obtained and carefully studied (or assumes responsibility for doing so) all examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, including any specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto.
E. Contractor does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
F. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
G. Contractor has correlated the information known to Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
Agreement 00030-4
CONTRACT DOCUMENTS
Contents
A. The Contract Documents consist of the following:
This Agreement (pages 00030-1 to 00030-7, inclusive).
Performance bond (pages 00080-1 to 0080-2, inclusive).
Payment bond (pages 00090-1 to 00090-2, inclusive).
Maintenance bond (pages 00100-1 to 00100-2, inclusive).
General Conditions (pages 01000-1 to 01000-40, inclusive).
Supplementary Conditions (pages 02000-1 to 02000-2, inclusive).
Technical Specifications (page 03000-1, inclusive).
Specifications bearing the following general title: Northeast Water Line Improvements
Addenda (number __).
Exhibits to this Agreement (enumerated as follows):
a) Contractor’s Bid (pages 00020-1 to 00020-10, inclusive).
b) Documentation submitted by Contractor prior to Notice of Award (pages ___ to ___, inclusive).
c) .
The following which may be delivered or issued on or after the Effective Date of the Agreement and are not attached hereto:
a) Notice to Proceed (pages 00120-1).
b) Contractor’s Affidavit of Final Payment (pages 00140-1)
c) Work Change Directives.
d) Change Order(s).
B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as provided in Paragraph 3.04 of the General Conditions.
Agreement 00030-5
MISCELLANEOUS
Terms
A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions.
Assignment of Contract
A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
Successors and Assigns
A. Owner and Contractor each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.
Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.
Certificate of Interested Parties
A. Contractor must complete and submit a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .