This document contains a performance work statement and related federal contract opportunity for propane supply and delivery services. The performance work statement outlines the requirements for the contractor to provide propane and propane oil to multiple government locations in Vermont, including maintaining minimum tank levels between 35-45% and filling tanks to 100% capacity prior to severe weather. The contractor must submit proof of delivery via email within two business days and monthly reports. Pricing will be comprised of the current index rate plus a fixed contractor margin. Offerors must submit proposals by May 31, 2022 to the General Services Administration for propane supply and delivery services to locations in Vermont on a total small business set-aside under solicitation 47PB0022Q0010.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Document 1: Performance Work Statement

Date: April 19, 2022

Contract Document 1-

PERFORMANCE WORK STATEMENT (PWS)

1 Introduction

This is a Performance Work Statement (PWS) for a performance-based service contract.

Performance-based acquisition (PBA), as defined in FAR 2.101, “means an acquisition structured around the results to be achieved as opposed to the manner by which the work is performed.

As defined in FAR 2.101, PWS is “a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes.

Rather than a mere list of activities, this PWS is a written expression of the GSA’s expectation of the services to be performed by the Contractor. A higher level of effective communication between the Government and Contractor is essential for partnering and for the performance-based service contract to succeed. The success of this Contract is shared between the

Government and the Contractor. The PWS details the work requirement and can be referred to as the specification

2 Scope of Work

The contractor shall provide all management, supervision, labor, materials, supplies, and equipment; and shall plan, schedule, coordinate and ensure effective supply and delivery of propane and/or Propane oil in accordance with requirements described herein. See Contract

Document 2 - Building Specifications (Microsoft Excel file).

The contractor shall automatically (i.e., without a separate request or order from the

Government) deliver the appropriate fuel to each location in order to maintain a minimum of

35% of the tank(s) capacity at all times at each location. The sole exception is the Cargo

Building propane tank at Highgate Springs, Vermont, which shall be maintained at a minimum level of 45%. In addition, prior to anticipated severe weather and ice storms, at the Government’s request, the contractor shall fill the tank to 100% capacity levels.

Most locations operate 24 hours per day, 365 days per year, including all holidays. However, regardless of the building hours, the contractor shall deliver to all locations at all hours, including weekends and holidays, as necessary to maintain the stated minimum required levels at each location.

2.1 Proof of Delivery

The Contractor shall provide a metered delivery ticket, via email, to wendy.thompson@gsa.gov within two (2) business days upon receipt from the supplier. The delivery ticket shall include the following information:

• Date of delivery;

• Total gallons delivered;

• Price per gallon. The ticket shall clearly indicate each of the following prices o Index Rate o Contractor Margin o Total Unit Price

The Contractor shall keep record of deliveries and provide to the government’s designated point of contact monthly reports of deliveries indicating the above information and final totals for deliveries for each building made during the previous month.

2.2 Government Surveillance.

The COR shall verify that the correct pricing is indicated on each delivery ticket in accordance with Section 2.1 above and that the correct index price for the date of delivery is utilized. The

COR shall also verify Propane level and delivery tickets match. All deliveries shall be tracked, including gallons and price, to ensure that the Contractor does not incur costs above the funded value for each location.

2.3 Contract Line-Item Pricing

The contract unit price per gallon of propane will consist of two components – the current index rate and a margin rate inclusive of all contractor markup. The unit price is expressed as follows:

Price per Gallon = Current Index Rate + Contractor Margin.

The Government requests pricing for each gallon of Propane to be broken down into an “Index

Rate” and a Margin Rate. Based on the subcomponents of “Materials”, the Government intends for the Index Rate to consist of Direct Material and Subcontract costs, and for the “Margin Rate” to consist of Other Direct Costs and Indirect Costs. Pricing terms are defined below and under

FAR 16.601.

Materials means-

(1) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;

(2) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract ;

(3) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract , travel, computer usage charges, etc.); and

(4) Applicable indirect costs.

Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

2.3.1 Index Rate

Contractor shall propose the current index rate(s) to be used for this contract and provide supporting documentation and website to verify the current index rate.

The total unit price per gallon of Propane will depend upon the individual delivery date, as the index rate fluctuates. The applicable index rate will be the rate in effect on the delivery date.

2.3.2 Contractor Margin

The Contractor Margin is fixed and includes all markup above the index rate. This includes, but is not limited to: delivery charge (including labor and transportation), overhead, profit, applicable taxes and duties, etc. The margin is fixed and will not fluctuate with changes to the index rate.

2.3.3 Contract funding

The contract line items will be funded based on the awarded fixed margin rate and the estimated quantities of Propane for each location. Estimated quantities are based on average historical annual expenditure for all Propane types at each location. The exact quantities which are required through-out the Period of Performance of this contract cannot be reasonably determined in advance and the estimated values may be increased or decreased according to the actual needs and with the understanding that the Government is only obligated and/or required to pay for the actual products/services rendered, ordered, received, and accepted.

If additional funding is required, a bilateral modification will be executed to increase the funding on an as needed basis in accordance with FAR 52.212-4 (c) Changes.

2.4 Spill Plan

The Contractor shall provide a Spill Plan with its proposal which will be incorporated upon award that demonstrates that they can effectively prevent and contain any Propane spills and prevent contamination to the surrounding ground, storm drains or downhill contamination to local waterways. The contractor must certify that their drivers have been trained on spill prevention. The plan must identify the process to contact key personnel and agencies, the materials of concern, spill prevention measures, and spill response procedures. Spill Response

Plans should clearly state how to stop the source of the spill, how to contain and clean up the spill, how to dispose of contaminated materials, and how to train personnel to prevent and control future spills. The Spill Plan shall be updated as applicable throughout the contract’s performance period.

2.5 The Contractor Shall

• The Contractor shall comply with current state and local regulations regarding sulfur content of heating oil.

• The contractor is responsible for adherence to all Occupational Safety and Health

Administration (OSHA) Regulations, specifically Section 1910.110 – Storage and Handling of Liquefied Petroleum Gases.

• The Contractor shall furnish all the necessary supervision, management, personnel, transportation, material, tools, and equipment to satisfy the work as defined in this

Performance Work Statement (PWS). Evaluations of the Contractors work shall be based on the standards in this Section and conducted in accordance with the Government’s Quality

Assurance Surveillance Plan (QASP).

3 Government Contract Quality Assurance

The Quality Assurance Surveillance Plan (QASP) is the Government’s surveillance method of monitoring and evaluating the Contractor's performance under a PWS. This QASP provides a standard of surveillance for monitoring the requirements of the Contract and a systematic approach for conducting surveillance over the performance aspects of the effort. The QASP is for the use of Government Quality Assurance (QA) personnel to ensure standards of the contract are being met.

The QASP provides a systematic method to evaluate the services the Contractor is required to furnish, but not the details of how the Contractor accomplishes the work. This plan uses inspections and customer feedback as the primary evaluation criteria. This surveillance assures the Government that the contractor’s performance is acceptable.

The QASP is based upon the premise that the Contractor, not the Government, is responsible for management and quality control actions to meet the terms and conditions of the Contract.

The methods of surveillance recognize that unforeseen and uncontrollable problems do occur.

Effective management and use of a Quality Control Plan will allow the Contractor to operate within the specified surveillance requirements. QA’s are expected to be objective, fair, and consistent in evaluating Contractor performance against the standards.

1) Inspections. Periodic inspections will occur on a predetermined basis (e.g., daily, weekly, monthly) as determined by the QA at award. The results of periodic inspections may be used as the basis for sub-par reports to be filed in the Contract. Random inspections may occur at any time and location.

The QA is the Government’s point of contact for the QASP and shall collect all customer feedback. The QA will be the COR, as identified at award.

All complaints and resultant resolutions shall be documented. Customer feedback reports become a permanent part of the QA surveillance records. Valid, documented customer complaints may be used as the basis for penalties against the Contractor. Positive feedback may be used to encourage the Contractor to continue performing above expectations

Quality Assurance Surveillance Plan:

Outcome Required

Services

Method of

Surveillance

Performance

Standard &

Acceptable

Quality Level

Incentives

Positive/Negative

Timeliness Tank Fill Inspections Minimum

Propane levels

Positive: Positive report in CPARS

Negative: Contract remedy as prescribed in

52.212-4 (a)

Quality Spill Cleanup Inspection 100% Positive: Positive report in CPARS

Negative: Contract remedy as prescribed in

52.212-4 (a)