Contract Discrepancy Report.pdf

PDF 243 KB Posted

Attached to
Military Free Fall Training Support Services
Solicitation number
N0018926RL005
Issued by

About this file

This is a Contract Discrepancy Report (CDR) template used by federal contracting officers to document and address contractor performance deficiencies. The CDR serves as a formal notification mechanism requiring the contractor to acknowledge receipt and, when specified, submit a written corrective action plan within a designated timeframe (typically specified in days following CDR receipt). The template includes fields for the contract number, identification of the Contractor Task Manager or on-site representative, the Contracting Officer's Representative (COR) name, the date and time the discrepancy was observed, and a detailed description of the discrepancy or problem with any supporting attachments.

The CDR requires signature acknowledgment from both the COR and the contractor's representative, establishing a formal record of the notification. A written corrective action plan may or may not be required depending on the severity of the discrepancy. The COR has discretion to initiate a CDR whenever monthly recorded defects for a performance standard exceed allowable thresholds, when performance is deemed critical and unacceptable requiring formal corrective action, or when an unfavorable trend is detected in contractor performance. This document functions as a compliance and performance management tool within federal contracting to ensure contractors maintain contractual obligations and performance standards.

View the file

Other files

File Type Posted
MFF PWS Amend 0002.pdf PDF
Solicitation Amendment N0018926RL0050002.pdf PDF
Solicitation Amendment N0018926RL0050001 SF 30.pdf PDF
MFF PWS Amend 0001..pdf PDF
Contract Administration..pdf PDF
MFF JA REDACTED.pdf PDF
Solicitation - N0018926RL005.pdf PDF
MFF Pricing Spreadsheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: <insert number>

2. TO: (Contractor Task Manager or on-site representative) <insert name>

3. FROM: (Name of COR) <insert name>

4. Date and time observed discrepancy:

5. DISCREPANCY OR PROBLEM:

<Describe in detail. Identify any attachments.>

5. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: <Enter COR’s name>

Signature – Contracting Officer’s Representative Date

Received by:

Signature - Contractor Task Manager or on-site representative Date

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.