Contract Discrepancy Report.pdf

PDF 243 KB Posted

Attached to
Underwater Training Targets Support Services Federal contract opportunity
Solicitation number
N0018924Q0224
Issued by
Department of the Navy Naval Supply Systems Command

About this file

The Contract Discrepancy Report (CDR) is a formal document used to document and track performance issues or problems during contract execution. The template provides a structured approach for the Contracting Officer's Representative (COR) to report discrepancies, including sections for detailing the specific problem, identifying the contract number, and outlining a corrective action plan. The form allows the COR to initiate a report whenever performance standards are not met, critical performance issues are detected, or unfavorable trends in contractor performance are observed. The document requires signatures from both the COR and the contractor's task manager or on-site representative, and may mandate a written corrective action plan within a specified number of days after receipt of the CDR.

View the file

Other files for this federal contract opportunity

Other files attached to Underwater Training Targets Support Services, newest first.
File Type Posted
N0018924Q0224P0002.pdf PDF
N0018924Q0224P0001.pdf PDF
Past Performance Report Form.docx DOCX document
Past Performance Information Form.docx DOCX document
Contract Pricing Spreadsheet.xlsx XLSX spreadsheet
N0018924Q0224.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: <insert number>

2. TO: (Contractor Task Manager or on-site representative) <insert name>

3. FROM: (Name of COR) <insert name>

4. Date and time observed discrepancy:

5. DISCREPANCY OR PROBLEM:

<Describe in detail. Identify any attachments.>

5. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: <Enter COR’s name>

Signature – Contracting Officer’s Representative Date

Received by:

Signature - Contractor Task Manager or on-site representative Date

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.