Contract_4723_Pre_Bid_Agenda_20261124.pdf

PDF 5 MB Posted

Attached to
Central Plant - Climate Control System Upgrade
Solicitation number
4723
Issued by
Sacramento County, San Francisco City, California

About this file

This is a pre-bid meeting agenda for a Central Plant Climate Control System Upgrade project in California. The project requires the contractor to furnish all necessary labor, materials, equipment, and incidental work to complete the climate control system upgrade in strict conformance with specifications and applicable regulatory requirements. The agenda document outlines the structure and topics for discussion at the pre-bid conference scheduled for November 24, 2026, which provides an opportunity for potential bidders to clarify project requirements, ask questions, and gain a comprehensive understanding of the scope of work before submitting their bids. The actual quantities of work to be performed may vary at the discretion of the County, with the stated quantities serving as approximations for bid comparison purposes.

The document does not specify pricing terms, contract duration, renewal options, funding sources, or set-asides in the pre-bid agenda itself. No incumbent contractor information or current environment details are provided in this agenda document. Bidders are advised that attendance at the pre-bid conference, while not mandatory, is strongly recommended to obtain clarification on project specifications and requirements prior to preparing and submitting formal bids.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTENTION

Sign-In location for the pre-bid meeting detailed below will be at the North side of 700 H street. Paid public parking is available at the County Parking lot to the North.

Please RSVP on OpenGov 24 hours in advance of the mandatory bid conference to facilitate check-in.

County of Sacramento Mandatory Pre-Bid Meeting Outline

Contract #4723

Central Plant – Climate Control System Upgrade

December 10, 2026 at 9AM

Location: 700 H street, Sacramento CA 95814

County of Sacramento Mandatory Pre-Bid Meeting Agenda

Contract #4723 Central Plant – Climate Control System Upgrade

December 10, 2026 at 9am Location: 700 H Street, Sacramento, CA

• Introductions o County Depts Present and consultants o All contractors present o Sign the Sign-In Sheet (disregard if you have RSVP’d via OpenGov)

• Pictures on this bid walk will be allowed.

• Contract Documents may be downloaded at: http://www.OpenGov.

• All questions shall be in writing and sent to OpenGov.

o The contractor is responsible for submitting any questions in writing so a formal written response can be provided to all bidders. Any questions asked and any responses given during the pre-bid meeting will not be recorded and will not be official.

o A response/answer to written questions will be by addenda. Notifications of an Addendum will be posted on OpenGov.

• Scope of Work o The work to be performed under this contract includes the replacement of the existing climate control system serving the central chilled and hot water plant at

700 H street. This project provides a replacement controls system to service the existing equipment. New Johnson Controls field devices and units are required to pair with the existing County downtown building management network. The scope includes a new electrical panel to service line voltage hydronic valves.

Refer to the bid plans and special provisions for more details.

o The contractor is required to accommodate the use of the chillers during all seasons, and the system will need to be placed in hand while the controls work is under construction.

Reminders *as noted on OpenGov, subject to change if noted via Addenda*

• Bid Questions Deadline o December 16, 2026 at 10am

• Bid Submission Deadline o January 7, 2027 at 2pm

• Engineer’s Estimate o $775,000.00

• Contractor’s License Requirement o The prime contractor shall be required to hold a General Building Contractor License, Class B. In addition, the prime contractor or their hired subcontractors shall hold the following licenses:

• Low Voltage Systems Contractor, C-7 (this work may alternately be completed by a C-10 licensed contractor)

• Electrical Contractor, C-10

• Warm-Air Heating, Ventilating and Air-Conditioning Contractor, Class C-

• Contract time o 180 Calendar Days

• Liquidated Damages o $775 per contract day

• Labor Compliance o This will be a Prevailing Wage Project.

• Bid proposal Forms o The Contractor must use the County Bid Forms provided on OpenGov. Sign and date in the appropriate places.

o The Contractor shall sign the Bid Proposal.

o The Bid Guarantee may be a fully-executed bid bond (whether hardcopy, or via Surety 2000), a certified or cashier’s check, or cash.

o The contractor must have acknowledged all addenda AND applicable Bid Alternates to successfully bid on this work.

o The Contractor is responsible for verifying the license numbers for the General and all Sub-Contractors are accurate, active, and placed on the County bid form(s).

o The Contractor is responsible for verifying the Department of Industrial Relations numbers (DIR#) for the General and all Sub-Contractors are accurate, active, and placed on the County bid form(s).

o Escrow Bid documents are required from the three lowest responsible bidders and must be submitted to Dept. of General Services, 9660 Ecology Lane, Sacramento, CA 95827 before 4:00pm on the Monday after the bids are due.

o Bidders must electronically submit their bid online no later than 2:00 pm on the day of the bid on OpenGov.

o Bids will be publicly opened by electronically unsealing the Bids on the Agency's eProcurement system website as indicated in the Notice to Bidders or a subsequent Addendum. Bidders and the public can view Bids received on the Agency's eProcurement system website after the Bid due date and time.

END

File details come from the government source that posted it. Updated .