Construction SOW PSXE242028 Repair MSG and Facilities Electrical System.pdf

PDF 20 MB Posted

Attached to
PSXE242028 - Repair MSG & Facilities Electrical System Federal contract opportunity
Solicitation number
W50S98-24-B-0006
Issued by
Department of the Army Tennessee Army National Guard

About this file

This document is a Statement of Work (SOW) for the solicitation W50S98-24-B-0006, titled "PSXE242028 - Repair MSG & Facilities Electrical System." The SOW outlines the requirements for repairing the electrical system at the Maintenance Support Group (MSG) and other facilities for the Tennessee Army National Guard.

The key details include the scope of work, which involves repairing and upgrading the electrical distribution system, including the replacement of electrical panels, switches, and other components. Drawings and specifications for the project are provided within the SOW. The solicitation requires a site visit on August 30, 2024, at 2 PM, and provides instructions for accessing the site. The contracting agency is the Department of the Army Tennessee Army National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to PSXE242028 - Repair MSG & Facilities Electrical System, newest first.
File Type Posted
OF_1419.pdf PDF
24B0006 Bid Sign In Sheet.pdf PDF
Site Visit Sign In Sheet 24B0006.pdf PDF
Site-Visit Minutes 24B0006.pdf PDF
Pre-Bid Slides 24B0006.pptx PPTX presentation
W50S9824B0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

STATEMENT OF WORK (SOW)

FOR

PSXE242028 REPAIR MSG & FACILITIES ELECTRICAL SYSTEM

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform upgrades, repairs, and new construction to enhance base infrastructure and various facilities, to include all services, as defined in this SOW.

1.2 Background: The Base requires properly maintained and adequate Air Force and Air National Guard compliant facilities and infrastructure to provide mission requirements in support of the 10 PAA KC-135R Air Refueling Wing, 119th Cyber Operations Squadron (COS), 241st Engineering Installations Squadron (EIS), and the Air National Guard Training and Education Center. The maintenance of base infrastructure is vital to preserving a large portion of the Base capital investment. Civil Engineering primarily serves as base sustainment and maintenance. Existing resources and personnel do not exist to perform large scale repair and construction activities, therefore contracted services are required to complete necessary upgrades, repairs, and construction of base infrastructure and various facilities.

1.3 The Period of Performance shall be 365 days after notice to proceed.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700 – 1700 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be located at McGhee Tyson Air National Guard Base. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this SOW when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is not authorized.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary.

The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is how it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR).

The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall coordinate with the COR and comply with AFI 31-101, Integrated Defense, and DODMAN5200.02_AFMAN 16-1405, Air Force Personnel Security Program.

5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1. Reserved

1.4.5.2 For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.4 Reserved

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Advanced Distributed Learning Service (ADLS). All contractor employees and associated sub-contractor employees assigned to work on a Government site and/or requiring access to a DoD network will be required to register with ADLS at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD IAA CyberAwareness, http://jko.jten.mil/

Protecting Sensitive Information, Force Protection, etc.). ADLS website:

https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Protection of Personally Identifiable Information (PII). The contractor shall protect all PII encountered in the performance of services in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 224.103 Personally Identifiable Information and Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program, and DoD 5400.11-R. If a PII breach results from the contractor’s violation of the aforementioned policies, the contractor shall bear all notification costs, call-center support costs, and credit monitoring service costs for all individuals whose PII has been compromised.

1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.

1.4.5.12 OPSEC Plan: Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Key Control: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

https://golearn.csd.disa.mil/kc/rso/login/ADLS_login.asp

1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying.

When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system and will deduct the total cost from the monthly payment due the contractor.

1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for disciplines used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.

The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Contractor Travel: Reserved

1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the SOW.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

A4A Logistics, Engineering and Force Protection A&E Architect and Engineer AEI Army Enterprise Infostructure ANG Air National Guard ANGETL Air National Guard Engineering Technical Letter AR Army Regulation ARW Air Refueling Wing AT/OPSEC Antiterrorism/Operational Security BCE Base Civil Engineer BI Background Investigation CM Contract Manager COR Contracting Officer Representative COS Cyber Operations Squadron DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation FFE Furniture, Fixtures and Equipment FY Fiscal Year GFP/M/E/S Government Furnished Property/Material/Equipment/Services HPSB High Performance and Sustainable HVAC Heating, Ventilation and Air-Conditioning HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IBC International Building Code IS Information System(s) KO Contracting Officer LRS Logistics Readiness Squadron NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RFI Request for information SATAF Site Activation Task Force SCR Service Contract Reporting

SF Square Feet SOW Statement of Work SSN Social Security Number TE Technical Exhibit UFC Unified Facilities Criteria USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace/staging area for the contractor to perform services outlined in this SOW. Contractor is responsible for securing worksite, equipment, and all associated materials.

3.2 Materials: N/A

3.3 Equipment: N/A

3.4 Services: N/A

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Reserved

4.3 Reserved

5.0 Requirements: The contractor shall provide the following in accordance with this SOW and the associated plans and specifications.

5.1 Progress Schedule, Submittals, & Requests for Information (RFIs):

5.1.1 Contractor will provide Progress Schedule by direction of the Contracting Officer not to exceed ten (10) days after contract award.

5.1.2 Contractor shall submit the manufacturer’s products requested as in accordance with this SOW and the provided plans and specifications. Contractor shall wait for approval before purchasing material. The contractor will supply all equipment and material unless otherwise stated in scope of work. A list of all recovered materials and quantities must be submitted by the contractor following project completion. The contractor must submit a list of hazardous materials required for project completion, if any, to the Base Environmental Manager (EM) before project execution begins. All unused product, if any, must be removed from base upon project completion.

5.1.3 Contractor will immediately notify Contracting Officer when conflicts or delays are identified that require additional information from the Government to proceed. Contractor shall submit Requests for Information (RFIs) to the Contracting Officer within 5 calendar days of identification.

5.2 Site Visits / Project Meetings: Civil Engineering will schedule site visits and design meetings between 8:00 A.M. and 4 P.M Monday through Friday. Contact Lt Col J. David Barrett at (865) 336-4213 or jon.barrett@us.af.mil for all scheduling requirements.

5.3 Coordination: All work will require coordination with the Tennessee Air National Guard Civil Engineering. The contractor shall conduct their work in a manner that will not interfere with or stop the operations being conducted in and around the work area.

Contractors are NOT to connect to the base water distribution system without prior approval from Civil Engineering. Once approval is received, the contractor must provide a functional backflow prevention device to ensure cross contamination is prevented.

5.4 PROJECTS: The Contractor shall ensure that all of the following tasks are properly accomplished in strict compliance with this SOW and the associated plans and specifications provided to include but not limited to the following tasks:

5.4.1 Base Bid – Repair Bldg 102 for MSG: Contractor shall renovate existing Mission Support Group office area in Building 102. Scope shall include but is not limited to demolition of demountable walls, ACT ceiling, lighting, carpet, etc. Contractor shall redo area finishes, construct new walls, doors, lighting, ACT ceiling, etc. in accordance with plans and specs titled “Repair Bldg 102 For MSG” dated 07 June 2024.

5.4.2 Option 1 – Repair Bldg 340 Electrical System: Contractor shall provide and install new Generator to include all associated components and modifications required for a complete and usable system in accordance with attached plans titled “Repair Bldg 340 Electrical System” dated 12 April 2024.

5.4.3 Option 2 – Repair Bldg 120 Electrical System: Contractor shall provide and install new Generator and Automatic Transfer Switch to include all associated components and modifications required for a complete and usable system in accordance with attached plans and specs titled “Repair Bldg 120 Electrical System” dated 12 April 2024.

mailto:jon.barrett@us.af.mil

5.4.4 Option 3 – Construct BX Sign Electrical: Contractor to provide and install appropriate conduit from Panel F on the North side of Building 90 to existing BX sign on the South corner of parking lot. Conduit to be Rigid Steel or EMT run exposed along the brick at approximately 18” – 24” above grade from Panel F past the Main Natural Gas Meter, remaining conduit to be PVC Schedule 40 installed underground at a minimum depth of 18”. Contractor shall install hand hole next to F 104 Static Display at the existing light pole location on the Southwest corner of Building 90 to intercept existing conduit across parking lot to existing junction box. Contractor shall provide and install mounting base for existing light and attach to lid of new Quazite Box to allow access for terminations and connection to existing light fixture. All transitions from underground shall be Rigid Steel 90. Contractor to provide (2) 20A, 120 single phase circuits utilizing 4#10 stranded phase conductors and 1#12 stranded equipment ground conductor from Panel F to sign location. Contractor shall replace existing lighting circuit conductors across parking lot with #10 stranded conductors. Contractor to field verify all locations, dimensions, and sizes. Contractor shall provide and install new BX lighting circuit to include all associated components and modifications required for a complete and usable sign in accordance with this Scope of Work and detail shown below.

5.5 Service Contract Reporting:

5.5.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 134th ARW via a secure data collection site.

5.5.2 The contractor shall completely fill in all required data fields using the following web address: https://sam.gov. Log in and select Entity Registrations and then select Service Contract Reporting.

The Contractor shall report the required information annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1- September 30).

Contract Reporting:

The DoD Guidebook for Service Contract Reporting in SAM, available on the DoD Procurement Toolbox at https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr. The General Services Administration (GSA) has also posted additional guidance such as quick start guides, informational videos, and frequently asked questions, that can be accessed by going to https://sam.gov and searching the “HELP” section. The SAM Federal User Guide is also available in the “HELP” section for comprehensive instructions on navigating SAM. Contractors requiring assistance using SAM should contact the Federal Service Desk at https://www.fsd.gov.

6.0 Applicable Publications: Publications applicable to this SOW are listed below:

Publication (Chapter/Page)

Date of Publicatio n

Mandator y or

Advisory Website Federal Acquisition

Regulation https://www.acquisition.gov/?q=browsef ar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarsp gi/current/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation

(JTR)

https://www.defensetravel.dod.mil/site/tr avelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/28/2020 http://www.esd.whs.mil/Directives/issua nces/dodm

Federal Information Processing Standards

(FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9)

August http://nvlpubs.nist.gov/nistpubs/FIPS/NI ST.FIPS.201-2.pdf https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://dodprocurementtoolbox.com/site-pages/service-contract-reporting-scr https://www.fsd.gov/ https://www.acquisition.gov/?q=browsefar https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars https://www.defensetravel.dod.mil/site/travelreg.cfm https://www.defensetravel.dod.mil/site/travelreg.cfm http://www.esd.whs.mil/Directives/issuances/dodm http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

Publication (Chapter/Page)

Date of Publicatio n

Mandator y or

Advisory Website DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issu ances/dodm/

DoDI 5200.46 DoD Investigative and

Adjudicative Guidance for Issuing the Common Access

Card (CAC)

09/09/14 (Change 1:

05/04/2018 https://www.esd.whs.mil/Directives/issu ances/dodi/

Homeland Security Presidential Directive

(HSPD)-12

Policy for a Common

Identification Standard for Federal Employees and

Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense

Privacy and Civil Liberties Programs

01/29/2019 ances/dodi/

DoD 5400.11-R Department of Defense

Privacy Program

05/14/2007 https://www.esd.whs.mil/Directives/issu ances/dodm/ DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 https://www.esd.whs.mil/Directives/issu ances/dodd/

DoD 8570.01-M

Information Assurance Workforce Improvement

Program

12/19/2005 (Change 4:

11/10/2015

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

02/28/2006 (Change 2:

05/18/2016

AFI 10-245

Antiterrorism

03/28/2013 (Certified current

03/30/2017 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131 https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodd/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodm/

Publication (Chapter/Page)

Date of Publicatio n

Mandator y or

Advisory Website

AFPD 17-1

Information Dominance Governance and

Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131

AFMAN 17-1301

Computer Security

(COMPUSEC)

02/12/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catI

D=1&series=- 1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the SOW are listed below:

Form Date Website

DD 1172-2

Application for Identification

Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/for ms/index.htm

I-9 Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/fil es/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/for ms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving

Report

Aug 2000 https://www.esd.whs.mil/Directives/fo rms/dd0001_0499/ http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

SOW Paragraph Task Performance

Standard Acceptable

Quality Levels

(AQL)

Surveillance Method / By Whom

5.4 Repair MSG &

Facilities Electrical System

Complete upgrades, repairs, & construction of facilities & infrastructure basewide In accordance with plans & specifications

Completed within POP

Weekly / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

SOW Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.2 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

1.4.6.1 Personnel Badging /

Visitor Passes

Return within 14 days of employee’s departure from contract performance.

Original(s) Hard Copy COR

5.1.1 Progress Schedule

10 Days after NTP and monthly there after

1 Electronic Submission

COR

Documentation As required per plans and specifications

1 Electronic Submission

KO

5.1.2 Submittals

Provide within 60 calendar days per plans and specifications

1 Electronic Submission

KO

5.1.3 Request for

Information (RFIs)

Provide within 5 calendar days after question or concern is identified

1 Electronic Submission

KO

REPAIR BLDG 102 FOR MSG

PSXE232040

TENNESSEE AIR NATIONAL GUARD

134TH AIR REFUELING WING

7 JUNE 2024

N.T.S.

LOCATION MAP

PROJECT

SITE

DRAWING LIST

D1.1 DEMOLITION PLAN

A1.1 FLOOR PLAN

A1.2 REFLECTED CEILING PLAN

A1.3 FURNITURE PLAN

M1.1 FLOOR PLANS - HVAC

M2.1 FLOOR PLANS - HVAC PIPING

M3.1 SCHEDULES & DETAILS - HVAC

FP1.1 FLOOR PLANS - FIRE PROTECTION

E1.0 FLOOR PLANS - DEMOLITION

E1.1 FLOOR PLANS - ELECTRICAL

E2.1 LEGEND, SCHEDULES & DETAILS

E2.2 SPECIFICATIONS

IT1.1 INFORMATION TECHNOLOGY PLAN

240 West Bessemer St. Alcoa, TN. 37701 Ph. (865) 980-3500

ELECTRICAL MECHANICAL ARCHITECTURAL

AutoCAD SHX Text

AutoCAD SHX Text

PELLISIPPI PKY

AutoCAD SHX Text

TOPSIDE RD

AutoCAD SHX Text

AutoCAD SHX Text

MARYVILLE PIKE

AutoCAD SHX Text

AutoCAD SHX Text

LOUISVILLE

AutoCAD SHX Text

MENTOR

AutoCAD SHX Text

AIR BASE RD

AutoCAD SHX Text

CALLAHAN RD

AutoCAD SHX Text

AutoCAD SHX Text

LOUISVILLE RD

AutoCAD SHX Text

W HUNT RD

AutoCAD SHX Text

W HUNT RD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ALCOA HWY

AutoCAD SHX Text

CUSICK RD

AutoCAD SHX Text

E HUNT RD

AutoCAD SHX Text

E BROADWAY AVE

AutoCAD SHX Text McARTHUR RD

AutoCAD SHX Text

MARYVILLE

AutoCAD SHX Text

METROPOLITAN

AutoCAD SHX Text

KNOXVILLE

AutoCAD SHX Text

AIRPORT AUTHORITY

AutoCAD SHX Text

AutoCAD SHX Text

FORT

AutoCAD SHX Text

LOUDON

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

LIBERTY ST.

AutoCAD SHX Text

TENNESSEE AIR NATIONAL GUARD

AutoCAD SHX Text

BRISCOE DR.

AutoCAD SHX Text

AutoCAD SHX Text

FRONT GATE ENTRANCE TO TANG BASE

6.7.24

R ep ai r

B ld g fo r M

S G

4t h A ir R ef u el in g W in g

P r o j e c t

N o

E n g in e e r in g S e r v ic e s

G r o u p

In c

K n o x v il l e

T e n n e s s e e

(8

-0

E a s t H il l

A v e

S u it e

C o n s u l t in g E n g in e e r s

E1.0

FL

O

O R

P

LA

N S

D

E M

O

LI

TI

O

N

AMA

ECH

VISITOR'S LOUNGE

MANPOWER

BATHROOM

MANPOWER

VISITOR'S LOUNGE

MANPOWER

BATHROOM

MANPOWER

R ep ai r

B ld g fo r M

S G

4t h A ir R ef u el in g W in g

P r o j e c t

N o

E n g in e e r in g S e r v ic e s

G r o u p

In c

K n o x v il l e

T e n n e s s e e

(8

-0

E a s t H il l

A v e

S u it e

C o n s u l t in g E n g in e e r s

RR

E1.1

FL

O

O R

P

LA

N S

E

LE

C

TR

IC

A L

AMA

ECH

RR

RR

R ep ai r

B ld g fo r M

S G

4t h A ir R ef u el in g W in g

P r o j e c t

N o

E n g in e e r in g S e r v ic e s

G r o u p

In c

K n o x v il l e

T e n n e s s e e

(8

-0

E a s t H il l

A v e

S u it e

C o n s u l t in g E n g in e e r s

E2.1

LE

G

E N

D , S

C H

E D

U

LE

S

D E

TA

IL

S

AMA

ECH

R ep ai r

B ld g fo r M

S G

4t h A ir R ef u el in g W in g

P r o j e c t

N o

E n g in e e r in g S e r v ic e s

G r o u p

In c

K n o x v il l e

T e n n e s s e e

(8

-0

E a s t H il l

A v e

S u it e

C o n s u l t in g E n g in e e r s

E2.2

S

PE

C

IF

IC

A

TI

O

N S

AMA

ECH

COMM LEGEND

01 A1-A-1

01 A 1 A 001

A1 PARTIAL FLOOR PLAN - INFORMATION TECHNOLOGIES

SCALE: 1/8" = 1'-0"

A13 TYPICAL COMM OUTLET DETAIL

N.T.S.

A9 TYP. CT FACEPLATE DETAIL

N.T.S.

D13 TYP. TV FACEPLATE DETAIL

N.T.S.

IT1.1

In fo rm at io n

T ec h n ol og y Pl an

CWH

CJS

KEY NOTES:

H1 PARTIAL FLOOR PLAN - INFORMATION TECHNOLOGIES DEMOLITION

SCALE: 1/8" = 1'-0"

GENERAL NOTES:

R ep ai r

B ld g fo r M

S G

4t h A ir R ef u el in g W in g

PSXE232040

06.07.24

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text +48

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text 3"

AutoCAD SHX Text 3"

AutoCAD SHX Text D

AutoCAD SHX Text A

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text

NOTE #3

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text

NOTE #4

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text 01-04

AutoCAD SHX Text 05-08

AutoCAD SHX Text 09-12

AutoCAD SHX Text 17-28

AutoCAD SHX Text

CP9

AutoCAD SHX Text

CP10

AutoCAD SHX Text 17-28

AutoCAD SHX Text 01-04

AutoCAD SHX Text 05-08

AutoCAD SHX Text 09-12

AutoCAD SHX Text

CP11

AutoCAD SHX Text

CP12

AutoCAD SHX Text 13-16

AutoCAD SHX Text 25-28

AutoCAD SHX Text 25-28

AutoCAD SHX Text 13-16

AutoCAD SHX Text 02A1G018

AutoCAD SHX Text 02A1G019

AutoCAD SHX Text 02A1G020

AutoCAD SHX Text 02A1G021

AutoCAD SHX Text 02A1G022

AutoCAD SHX Text 02A1G023

AutoCAD SHX Text 02A1G024

AutoCAD SHX Text 02A1G025

AutoCAD SHX Text 02A1G026

AutoCAD SHX Text 02A1G027

AutoCAD SHX Text 02A1G028

AutoCAD SHX Text 02A1G029

AutoCAD SHX Text 02B1A002

AutoCAD SHX Text 02B1B001

AutoCAD SHX Text 02B1B002

AutoCAD SHX Text 02B1A001

AutoCAD SHX Text 02B1A004

AutoCAD SHX Text 02B1B003

AutoCAD SHX Text 02B1B004

AutoCAD SHX Text 02B1A003

AutoCAD SHX Text 02B1A006

AutoCAD SHX Text 02B1B005

AutoCAD SHX Text 02B1B006

AutoCAD SHX Text 02B1A005

AutoCAD SHX Text 02B1A008

AutoCAD SHX Text 02B1B007

AutoCAD SHX Text 02B1B008

AutoCAD SHX Text 02B1A007

AutoCAD SHX Text 02B1A010

AutoCAD SHX Text 02B1B009

AutoCAD SHX Text 02B1B010

AutoCAD SHX Text 02B1A009

AutoCAD SHX Text 02B1A012

AutoCAD SHX Text 02B1B011

AutoCAD SHX Text 02B1B012

AutoCAD SHX Text 02B1A011

AutoCAD SHX Text 02B1A014

AutoCAD SHX Text 02B1B013

AutoCAD SHX Text 02B1B014

AutoCAD SHX Text 02B1A013

AutoCAD SHX Text 02B1A016

AutoCAD SHX Text 02B1B015

AutoCAD SHX Text 02B1B016

AutoCAD SHX Text 02B1A015

AutoCAD SHX Text 02B1A018

AutoCAD SHX Text 02B1B017

AutoCAD SHX Text 02B1B018

AutoCAD SHX Text 02B1A017

AutoCAD SHX Text 02B1A020

AutoCAD SHX Text 02B1B019

AutoCAD SHX Text 02B1B020

AutoCAD SHX Text 02B1A019

AutoCAD SHX Text 02B1A024

AutoCAD SHX Text 02B1B023

AutoCAD SHX Text 02B1B024

AutoCAD SHX Text 02B1A023

AutoCAD SHX Text 02B1A022

AutoCAD SHX Text 02B1B021

AutoCAD SHX Text 02B1B022

AutoCAD SHX Text 02B1A021

AutoCAD SHX Text 02B1A025

AutoCAD SHX Text 02B1B025

AutoCAD SHX Text 02B1A026

AutoCAD SHX Text 02B1B026

AutoCAD SHX Text 02B1A027

AutoCAD SHX Text 02B1B027

AutoCAD SHX Text 02B1A028

AutoCAD SHX Text 02B1B028

AutoCAD SHX Text 02B1A029

AutoCAD SHX Text 02B1B029

AutoCAD SHX Text 02B1A030

AutoCAD SHX Text 02B1B030

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +72"

AutoCAD SHX Text +80"

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text 01-04

AutoCAD SHX Text 13-16

AutoCAD SHX Text 13-16

AutoCAD SHX Text 17-20

AutoCAD SHX Text 05-08

AutoCAD SHX Text 09-12

AutoCAD SHX Text 01-04

AutoCAD SHX Text 05-08

AutoCAD SHX Text 29-32

AutoCAD SHX Text 09-12

AutoCAD SHX Text 33-36

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text 21-24

AutoCAD SHX Text 17-20

AutoCAD SHX Text 21-24

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text

CP11

AutoCAD SHX Text

CP12

AutoCAD SHX Text 01-12

AutoCAD SHX Text 13-24

AutoCAD SHX Text 13-24

AutoCAD SHX Text 01-12

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TV

AutoCAD SHX Text

CCTV COAX CABLE LABELING NOTE:

AutoCAD SHX Text

(EXAMPLE)

AutoCAD SHX Text

FLOOR NUMBER

AutoCAD SHX Text

CCTVS DESIGNATION

AutoCAD SHX Text

CAT6 CABLE LABELING NOTE:

AutoCAD SHX Text

(EXAMPLE)

AutoCAD SHX Text

PORT NUMBER IN PATCH PANEL (CABLE)

AutoCAD SHX Text

PATCH PANEL DESIGNATION

AutoCAD SHX Text

FLOOR NUMBER

AutoCAD SHX Text

CLOSET DESIGNATION

AutoCAD SHX Text

RACK DESIGNATION

AutoCAD SHX Text

PORT NUMBER

AutoCAD SHX Text

SPLITTER NUMBER

AutoCAD SHX Text

CATV/COMM OUTLET, SEE DETAIL A13 AND D13 THIS SHEET.

AutoCAD SHX Text

CT

AutoCAD SHX Text

CONDUIT ROUTED ABOVE CEILING. TURN DOWN CONCEALED IN WALLS.

AutoCAD SHX Text

INFORMATION OUTLET, SEE DETAIL A9 AND A13 THIS SHEET.

AutoCAD SHX Text EXISTING CONSOLIDATION POINT. 2'X2' METAL PASSIVELY COOLED 5U DROP DOWN RACK PROVIDE WITH 48 PORT PATCH PANEL, SEE SPECS.

AutoCAD SHX Text EXISTING RECESSED CEILING MOUNTED SOUND/PAGING SPEAKER, EXTEND SPEAKER WIRING BETWEEN UP TO EIGHT SPEAKERS AND HOMERUN TO SOUND/PAGING AMPLIFIER IN COMM ROOM.

AutoCAD SHX Text

1. MOUNT 4"X4" JUCNTION BOXES AT SAME HEIGHT AS ELECTICAL

AutoCAD SHX Text

UNLESS NOTED OTHERWISE

AutoCAD SHX Text

2. OUTLET CONFIGURATION SHALL BE AS INDICATED ON PLANS

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

4"X4" DEEP SET

AutoCAD SHX Text

JUNCTION BOX

AutoCAD SHX Text

1" EMT CONDUIT TO CONSOLIDATION POINT AS REQUIRED.

AutoCAD SHX Text

DEVICE RING AS

AutoCAD SHX Text

REQUIRED.

AutoCAD SHX Text

ROUGH-IN ONLY

AutoCAD SHX Text

DEVICE PLATE AND

AutoCAD SHX Text

OUTLETS, SEE DETAILS

AutoCAD SHX Text

THIS SHEET.

AutoCAD SHX Text

TYPICAL WORK AREA OUTLET SHOWN FOR REFERENCE ONLY. PROVIDE

AutoCAD SHX Text

ROUGH-IN ONLY FROM OUTLET BOXES TO CONSOLIDATION POINT.

AutoCAD SHX Text

CLEAN CONDUIT AND PROVIDE PULL STRING FOR USE BY BASE COMM.

AutoCAD SHX Text

TYPICAL NOTE:

AutoCAD SHX Text

IDENTIFICATION

AutoCAD SHX Text

VIA EXTERNAL

AutoCAD SHX Text

AND INTERNAL

AutoCAD SHX Text

LABELS AND (TYP)

AutoCAD SHX Text

8-PIN 8-CONDUCTOR

AutoCAD SHX Text

(8P8C) (RJ-45)

AutoCAD SHX Text

CONNECTORS #1 & #3

AutoCAD SHX Text

FACEPLATE PER

AutoCAD SHX Text

SPECIFICATIONS

AutoCAD SHX Text

CT

AutoCAD SHX Text

SYMBOL:

AutoCAD SHX Text

8-PIN 8-CONDUCTOR

AutoCAD SHX Text

(8P8C) (RJ-45)

AutoCAD SHX Text

CONNECTORS #2 & #4

AutoCAD SHX Text

HD-15

AutoCAD SHX Text

VGA

AutoCAD SHX Text

HDMI

AutoCAD SHX Text

1" TO CABLE TRAY

AutoCAD SHX Text

1" TO "CTS"

AutoCAD SHX Text

AUDIO

AutoCAD SHX Text

HD-15

AutoCAD SHX Text

VGA

AutoCAD SHX Text

AUDIO

AutoCAD SHX Text

W/ COAX

AutoCAD SHX Text

W/ CAT 6

AutoCAD SHX Text

THREE PORT "DECORA" STYLE

AutoCAD SHX Text

KEYSTONE BACKPLATE. CENTER

AutoCAD SHX Text

RAPID RUN MULTI FORMAT

AutoCAD SHX Text

WALL PLATE W/ "DECORA"

AutoCAD SHX Text

AND "KEYSTONE" BLANKS.

AutoCAD SHX Text

VANCO #820490 HDMI

AutoCAD SHX Text

KEYSTONE JACK WITH

AutoCAD SHX Text

F-F PIGTAIL.

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .