This document is the Construction Budget Detail and Budget Narrative Instructions for a federal grant opportunity. It provides guidance on how to prepare a detailed budget for the proposed project, including both federal funds and matching funds. The budget should be broken down into categories such as administrative and legal expenses, land and right-of-way acquisition, relocation expenses, architectural and engineering fees, project inspection fees, site work, demolition and removal, construction, equipment, and miscellaneous and contingency costs. Applicants must provide a basis of computation for each cost item. This document is a required attachment for the FY24 Federal-State Partnership for Intercity Passenger Rail Grant Program, which funds capital projects on the Northeast Corridor to reduce the state of good repair backlog, improve performance, or expand or establish new intercity passenger rail service.
Construction Budget Detail and Budget Narrative Instructions (Required; Upload your document as an attachment)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF-424C Budget Information Instructions
Detailed Budget: Applicants must present a detailed budget for the proposed project that includes both
Federal funds and matching funds. Items of cost included in the budget must be reasonable, allocable and necessary for the project. At a minimum, the budget should separate total cost of the project into the following categories and provide a basis of computation for each cost:
Administrative and Legal Expenses: List the estimated amounts needed to cover administrative expenses. Do not include costs which are related to the normal functions of government.
Allowable legal costs are generally only those associated with the purchases of land which is allowable for Federal participation and certain services in support of construction of the project.
This may include:
o Hours/Rate and total cost of local government staff o Hours/Rate and total cost of outside counsel fees o Hours/Rate and total cost of consultants o Etc.
Land, structures, rights-of-way, appraisals, etc.: List the estimate site and right(s)-of-way acquisition costs (this includes purchase, lease, and/or easements). If possible, include details of number of acres, acre cost, square-footage, and square footage cost.
Relocation expenses and payments: List the estimated costs relation to relocation advisory assistance, replacement of housing, relocation payments to displaces persons and businesses, etc. This may include:
o The gross salaries and wages of employees for the grantee who will be directly engaged in performing demolition or removal of structures from developed land.
Architectural and engineering fees: List the estimated basic engineering fees related to construction (this includes start-up services and preparation of project performance work plan).
Other architectural and engineering fees: List the estimated engineering costs, such as surveys, tests, soil borings, etc.
Project inspection fees: List the estimated engineering inspection costs. This may include:
o Rate of project inspector o Construction monitoring o Audit or construction programs
Site Work: List the estimated costs of site preparation and restoration which are not included in the basic construction contract. This may include:
o Clearing o Erosion control o Reseeding o Etc.
Demolition and removal: List the estimated costs related to demolition activities.
Construction: List the estimated cost of the construction contract. This may include costs for:
o Labor costs, e.g., associated with site preparation and installation of grade crossings, highway warning signs, etc.
o Equipment rental/purchase, e.g., an excavator or bulldozer o Materials, e.g., Rail anchors, retaining walls, etc.
Equipment: List the estimated cost of office, shop, laboratory, safety equipment, etc. to be used at the facility, if such costs are not included in the construction contract.
Miscellaneous: List the estimated miscellaneous costs.
Contingencies: List the estimated contingency costs.
File details come from the government source that posted it. Updated .