Offeror Questions RFP 932 Electronic Visit Verification
| No |
| RFP Section |
| RFP Page |
| Question |
| Response |
| 1 |
| 4.4.10.2 |
| 25 |
| Are all named Key Personnel required 100% utilization? |
| All individuals designated as Key Personnel are expected to be fully dedicated to the project, with 100% allocation of their time and responsibilities. |
Refer to Section 4.4 of the RFP for details on time allocation and specific responsibilities.
| 2 |
| 4.4.10.1 |
| 25 |
| Are Key Personnel all required to be local in Boise, or can they have local office hours? |
| Vendors must meet the requirement as written. |
| 3 |
| 4.4.4 |
| 25 |
| We assume the certification of the EVV module will comply with the October 2019 Outcome Based Certification procedures since the SMC does not include EVV criteria. Please confirm. |
| Certification to comply with current CMS direction at time of certification. Current CMS direction found in State Health Official (SHO) Letter #25-003 dated August 6, 2025. |
| 4 |
| 4.12 |
| 14 |
| “…a single contract document for each awarded Contractor…” How many contractors does the State plan to award a contract? |
| The State intends to award a single Contract as a result of this solicitation. |
| 5 |
| Exhibit 1, #2 Paragraph 3 |
| 15 |
| “…Streamlined Modular Certification (SMC)…”. We assume the certification of the EVV module will comply with the October 2019 Outcome Based Certification procedures since the SMC does not include EVV criteria. Please confirm. |
| See response to question #3. |
| 6 |
| 4.9.11 |
| 36 |
| What does the state mean by package executables, configurations, and source code? Modern software is a single code for all environments and customers. |
| Requirement 4.9.11 refers to the need for automated tools and processes that support the packaging and promotion of software components, potentially including executables, configurations, and source code, into designated environments, ensuring traceability, repeatability, and controlled deployment aligned with the State’s approval and scheduling protocols. |
| 7 |
| 4.6.4 |
| 30 |
| What additional contractors might we be working with to integrate solutions within IDHW’s MMIS and is there an estimate of how often this may occur? |
| The MMIS modernization effort is modular by design and involves multiple contractors delivering distinct business functions that must interoperate. Contractors will be required to collaborate with, e.g., other MMIS module vendors, the SI Hub vendor, and external data exchange partners such as other Idaho state agencies or Federal entities. |
| 8 |
| 4.6.4 |
| 30 |
| With which other systems will the EVV module be expected to integrate? |
| The EVV module is expected to integrate with other MMIS modules and authorized third-party systems as defined by IDHW. Specific integration points will be determined during implementation and may include but not be limited to modules responsible for claims processing, provider management, financial payments, member eligibility, and reporting, facilitated through the SI Hub complying with the Technical Reference Architecture. |
| 9 |
| 4.9.9 |
| 35 |
| What data needs to be synced from Requirements Management and Test Management tools? |
| Successful integration must ensure that all data necessary to maintain traceability between requirements and test cases, visibility into test execution outcomes, and alignment of project metrics is available within the IDHW requirement repository (currently Azure DevOps). Specific integration details will be determined collaboratively during onboarding and must align with IDHW’s technical architecture and governance standards. |
| 10 |
| 4.10.42 |
| 41 |
| Is there a specific geographical location this is limited to, for example, the state of Idaho, regions within Idaho and for what users would this apply (for example: State user, Caregivers, case managers, etc.)? |
| No, there is no limitation to geography or users. The Contractor’s solution must enable IDHW to grant or restrict user access based on geographic location, including all locations both within and outside the United States. |
| 11 |
| 4.12.26 |
| 47 |
| In what format are the data entities? |
| Data entity formats will be determined based on the needs of the systems involved in each exchange. The Contractor must collaborate with IDHW and data exchange partners to define the appropriate agreed upon schema and structure. All formats must be documented in Interface Control Specifications (ICS) and approved by the Architectural Review Board (ARB). |
| 12 |
| 4.12.26 |
| 47 |
| Are these interfaces via API? |
| The specific approach will depend on the systems involved and the nature of the data exchange. The SI Hub supports service-based architectures and standardized interface patterns such as synchronous and asynchronous APIs, publish/subscribe models, and managed file transfers. All interface implementations must be documented in Interface Control Specifications (ICS) and approved by the Architectural Review Board (ARB). |
4.15.1 & 4.15.3
31,
| Some requirements indicate all training documentation needs to be updated at least sixty (60) calendar days before promotion of changes to production, and the other indicates at least one (1) month prior to the release of any EVV service module updates. Would you please clarify how far in advance of module updates that training material needs to be updated? |
| A detailed Training Plan must be submitted to IDHW: |
1. At least ninety (90) days prior to the initial production release
2. During operations, the Contractor must submit an annual detailed Training Plan to IDHW sixty (60) days prior to each calendar year end.
3. During operations, the Contractor must submit a detailed Training Plan, at least one (1) month prior to the release of any EVV Module services.
During operations, training documentation required due to operational changes, must be updated at least sixty (60) calendar days prior to any release. Updated versions of training documentation must be delivered to IDHW for approval if the changes are more than cosmetic or grammatical in nature.
| 14 |
| Exhibit 5, Point #2 |
| 60 |
| What is the approximate cost of re-procurement? |
| The cost of re-procurement depends largely on the complexity of the project and is not possible to approximate. |
| 15 |
| Submittal Form C, Cost Proposal |
| 98 |
| The M&O cost matrix provides an "Estimated Number of Units". Will the Contractor be able to bill based on the Actual Number of Units, if materially different from Estimated? |
| Submittal Form C: Cost Proposal has been updated to break out on-going monthly and a fixed costs per item. |
| How many Provider Agencies in the state are required to provide EVV data? |
| These are point in time metrics and vary with Medicaid enrollment and changes to Providers: |
1. Ten (10) state user licenses
2. 138+ Personal Assistance Agencies plus Home Health
3. Approximately 8k caregivers use the system per month
4. Approximately 225k visits per month
| How many unique EVV systems are currently being used by Provider Agencies in the state which will need to be aggregated? |
| 31 Vendors |
| Does the state intend to offer all Provider Agencies the option to either (a) use the state-run EVV platform procured from the Contractor or (b) to use a different EVV platform and aggregate this data up to the state EVV platform procured from the Contractor? |
| Selected vendor must comply with the current IDHW ‘Provider Choice Model’ in which an aggregator is used and integrates with the Claims module. |
IDHW offers providers the opportunity to select an EVV platform that will successfully aggregate data up to the state EVV platform procured from the Contractor.
| 19 |
| 1.2 |
| 3 |
| The State has tentatively set the week of November 17 aside for oral presentations/interviews/demonstrations. This is the week of the National Association of Medicaid Directors (NAMD) annual conference. It is likely that many bidders’ key staff will be attending this conference. Is it possible to push demonstrations out to the week after Thanksgiving? |
| IDHW's consideration to accommodate the bidder's request must not compromise the overall project schedule. While IDHW remains open to reasonable accommodations, such adjustments will not be made at the expense of meeting critical project milestones or impacts to the overall implementation timeline. |
| 20 |
| Exhibit 2, 1. Summary of Scope |
| 17 |
| Will the MCO’s in Idaho be part of this contract? |
-Meaning will they be submitting information to the EVV aggregator?
-Or will they be required to use the same aggregator vendor post-award?
Yes, the Idaho MCOs will use the procured EVV system. The MCO does not need to enter data into the aggregator, but the system should allow them to access and obtain data.
| 21 |
| 4.11 Award |
| 14 |
| It was stated on the pre-bid conference that the award will go to the bidder with the highest total points. However, this section seems contradictive, as it begins with “An award will be made to the lowest responsible bidder(s)...” |
-Would the State please confirm whether the lowest price bidder or highest point scoring bidder will receive the award?
The State will be awarding a Contract to the Offeror who receives the highest number of total normalized points.
| 22 |
| 4.10.13 |
| 38 |
| Does the State currently utilize an identity management provider (IDp) solution (e.g. Azure or OKTA). |
-If yes, please provide the name of the vendor The State expects that the Contractor’s solution will federate with the SI Hub's Identity Provider (IdP) and leverage the standard Single Sign-On (SSO) and Identity and Access Management (IdAM) infrastructure. Multifactor authentication (MFA) will be managed centrally, and vendors must ensure their applications support this integration.
| 23 |
| 4.10.13 |
| 38 |
| Does the State expect that Bidders would federate with the State’s IDp or provide their own multifactor solution? |
| See response to question #22. |
| 24 |
| Terms and Conditions 4.2.1 |
| 17 |
| Is the EVV contract considered a statewide Contract that is subject to the 1.25% administrative fee? If so, what is the reason for this fee for a direct contract for a single solution, only to be used by IDHW? |
| A Contract resulting from this solicitation will not be subject to the 1.25% administrative fee. This section has been removed from the Terms and Conditions attached to this event. |
| 25 |
| Key Personnel and Resources |
4.4.11.
| 26 |
| Could you please clarify whether these references must be from clients, or if they may also include supervisors or colleagues who can speak to the key personnel’s relevant experience? |
| Requirement 4.4.11 does not specify if the reference is internal or external, as such, either would be acceptable. Please prioritize client references where possible. |
| 26 |
| 2.6 Electronic Submission Instructions |
| 6 |
| Along with a Cover Page and Table of Contents, please confirm that offerors may include an Executive Summary in Package 1 or Package 2 outside of any noted page limits. |
| Offerors are not permitted to include an executive summary outside of the given page limits. |
| 27 |
| 4.6 Presentations |
| 11 |
| Please update the constraint of only 3 team members allowed for the presentation to match the language in Exhibit 7 indicating “Offerors may only have six (6) staff present for presentation/product demonstrations at any given time.” |
| This oversight has been fixed. See the amended RFP document. |
| 28 |
| Exhibit 2 Scope of Work |
| 17 |
| Does IDHS have a preferred timeline for the start of the DDI Phases to align with an Integrated Master Schedule (IMS) implementation target of September 2027? |
| Yes, the EVV module is expected to align with the pending target dates of the IDHW Integrated Master Schedule (IMS). |
IDHW reserves the right to modify the IMS as necessary during the DDI phase. Any such changes must go through the Project Change Control process.
| 29 |
| Exhibit 2 Scope of Work |
| 17 |
| 3. Schedule & Term Expectations indicate that DDI must coincide with the September 2027 implementation milestone. Please confirm that DDI Phases 1-3 are prior to and up to the September 2027 date – and then – production operations (including DDI Phase 4) run for the full 4-year term (to align with the 48 months of M&O costs in the Cost Matrix (Submittal Form C). This would result in a term of 4 years plus the time for DDI Phases 1-3 prior to September 2027. If M&O is for the 4-year term minus the DDI portion of the project, please provide an updated Form C. |
| See response to question #28. |
DDI Phase 4 and production operations will then continue for a full 4-year term, aligning with the 48 months of M&O costs outlined in Form C.
| 30 |
| 4.1 Operational Requirements |
| 18 |
| Req 4.1.6: Our solution is already an operational SaaS solution hosted in our data centers for several other clients. Please provide the approved IDHW Technical Reference Architecture (TRA) for reference and examination only. Please remove this and other similar requirements for compliance with details defined in the TRA, as it restricts commercially available SaaS solutions that do not require on-premise installation. |
See also 4.10.10, 4.10.43, 4.10.60, and several other references throughout the RFP 932 – Administrative Document.
The TRA has been developed with consideration for SaaS hosted solutions, and its stipulations would be fully applicable to such application architectures. The TRA is included with the RFP amendment.
See response to #1 in "Consolidated Modifications and Exceptions_response" referencing inclusion of the Idaho Standard Terms and Conditions for Cloud Services (Cloud T's&C's).
| 31 |
| 4.1 Operational Requirements |
| 18 |
| Req 4.1.13: Please clarify the scope of expected “help desk services” from the EVV vendor related to MMIS modules and components. |
| The help desk services required under this provision must support users and stakeholders in resolving issues related to the EVV vendor’s integration with MMIS modules and components. This includes, but is not limited to, troubleshooting data exchange errors, orchestration failures, security-related incidents, and performance anomalies across the MMIS Integration Platform. The help desk must be accessible via a portal and provide ticketing, escalation, and resolution tracking for all reported issues. Support must extend to all MMIS-related business processes and technical components impacted by the EVV solution. |
| 32 |
| 4.4 Key Personnel and Resources |
| 25 |
| 4.4.5: Can bidders use someone identified as key personnel to also act as the Backup Certification Lead? |
| Yes, provided the backup Certification Lead meets the requirements set forth in the RFP, there are no conflicts with them also being listed as key personnel. |
| 33 |
| 4.12 Integration |
| 47 |
| Req 4.12.19: Please provide the interface format and transport technology for displaying data and messages and alerts from other systems in real time? |
| Interface formats and transport technologies will be defined collaboratively during interface design and documented in Interface Control Specifications (ICS). All receipt and display of data, messages, and alerts from other systems in real-time are expected to be integrated through the SI Hub. |
| 34 |
| Appendix B SLAs |
| 76 |
| Compliance of Contract and RFP Requirements: Is IDHW open to negotiation of mutually agreed service levels and performance measures so that contract delivery and performance expectations are clearly defined. SLAs that benefit the EVV program specific to those applicable to a hosted SaaS EVV solution. |
| SLAs defined in Appendix B are non-negotiable. Clarification of requirements will be addressed during Requirements Validation sessions. |
See response to question #30 Cloud T's&C's.
| 35 |
| Appendix B SLAs |
| 77 |
| System Availability - Incidence Response and Resolution 4.1.20: Will IDHW accept resolution times for moderate deficiencies so that the resolution of each unique deficiency fits within the standard SDLC including root cause analysis, determination of the resolution and implementation of the fix? This would allow for the appropriate levels of testing including unit, regression and acceptance testing. |
| No change to the requirement. Specific details can be defined during requirements validation sessions. |
| 36 |
| Appendix B SLAs |
| 78 |
| Security Incident Response 4.10.6: Will IDHW accept providing a draft/initial incident report within 24 hours, followed up with the final RCA within 10 business days? |
| The Contractor must submit a written report to IDHW within twenty-four (24) hours of identifying any security incident. The report must include all required details as outlined in the requirement. If additional information becomes available after the initial report is submitted, the Contractor must provide a written follow-up report within twenty-four (24) hours of discovering that information. |
| 37 |
| Appendix B SLAs |
| 78 |
| Approval Request to Architecture Review Board Prior to Installation 4.12.10: As a hosted, SaaS solution already operational across multiple clients, ARB approval is not applicable. Since this is not an on-premise solution, please remove this SLA. |
| The State rejects this proposed modification to Appendix B, Section 4.12.10. |
This applies in SaaS if changes (e.g., hardware, software, interfaces) impact EVV services.
See response to question #30 Cloud T's&C's.
| 38 |
| Appendix B SLAs |
| 80 |
| Call Center and Help Desk Support Staff Availability 4.16.2: Please clarify the required customer support hours as Support Desk, Help Desk and Staff availability have different support hours. (see also 4.16.16 and 4.4.22) |
| Call Center and Help Desk (A.16.2): Must be staffed from 7:00 AM to 7:00 PM MT. |
Service Desk (A.16.16): Must be operational and meet performance metrics during IDHW business hours (7:00 AM to 6:00 PM MT).
General Staff (A.4.22): Must be available during IDHW business hours (7:00 AM to 6:00 PM MT).
| 39 |
| Appendix B SLAs |
| 82 |
| PDF Export of SLAs and Operational Definition 4.7.8: Please clarify expectations for the PDF export. Also, please confirm ownership of DevOps (Justification Field) – assuming that DevOps is owned and administered by an Idaho agency. Please clarify how the contractor is to use DevOps during DDI phases and M&O. |
| The IDHW-owned Azure DevOps boards are the authoritative source of truth for all EVV project requirements and related artifacts. Training will be provided to Contractor on the process for identifying and flagging certification requirements in IDHW's repository Azure DevOps. |
| 40 |
| Appendix B SLAs |
| 82 |
| Environment Refresh 4.9.6: Please confirm that IDHW is open to discuss and negotiate each environment reload request. Generally, we follow a formal change request process to validate technical requirements for each environment refresh and document the mutually agreed date for refresh. |
| IDHW reserves the right to modify or negotiate environment reload requests. |
Numerous reasons could be the cause for an environment refresh request, please see the following three (3) examples:
1. If a critical defect is discovered and fixed in a test environment IDHW may request a refresh to retest the fix in a clean environment.
2. To support provider or staff training IDHW may request a refresh of the training environment with anonymized production data.
3. A use case may involve the recovery of a non-production environment—such as UAT or staging—that has become unstable or corrupted due to configuration errors, data issues, or failed deployments.
| Some portions of the RFP appear to state requirements for a software development project that a SAAS provider may not need to undertake. Does Idaho agree that such provisions about software development activities may not apply to the SAAS product that may be provided and would not be required in such cases? |
| See response to question #30 Cloud T's&C's. |
| 42 |
| 2.6 – Electronic Submission Instructions |
| 6 |
| The instructions say to upload Submittal Forms A-C in MS Word. Would it be acceptable to upload these forms in PDF, especially since Submittal Form A requires a signature? |
| Offerors may upload Submittal Form A in PDF format. Submittal Forms B and C must be in Microsoft Word format as stated. Section 2.6 has been updated to reflect this change. |
| 43 |
| 4.11 |
| 14 |
| How will all offerors be notified of an intended award? |
| The State will issue a Notice of Intent to Award, which will serve as the notification to all Offerors who submitted proposals. |
| 44 |
| Exhibit 1 - Background Information |
| 15 |
| How many unique providers participate in EVV? How many providers use the state-provided system? On average, how many individuals participate in EVV annually? On average, how many EVV visits are accepted by the Aggregator monthly? |
| See response to question #16. |
| 45 |
| 4.1 – Operational Requirements |
| 19 |
| 4.1.22 states: “The Contractor must ensure their solution is available to support processing and other Medicaid functions ninety-nine-point-nine percent (99.9%) of the time.” Please clarify if there is a timeframe associated with this requirement (e.g., 7am-7pm, 24x7, etc.). Does planned downtime count against the 99.9% (if the timeframe is 24x7)? |
| Planned downtime does not count against this requirement. |
See requirement 4.9.20 for date and time-based availability expectations.
| 46 |
| 4.1 - Operational Requirements |
| 20 |
| 4.1.26.8 states: “Provide metrics necessary to support the IDHW CIO’s Legislative Finance Committee reporting requirements.” |
Can you please define these metrics?
IDHW will provide the required reporting metrics during the DDI phase to support the development of all reports as part of the implementation process.
| 47 |
| 4.2 - Certification |
| 21 |
| 4.2.18 states: “The Contractor must identify and flag certification requirements in IDHW’s requirements repository, currently Azure DevOps and their RTM and testing tools.” |
Please provide clarification around this requirement.
See response to question #39.
| 48 |
| 4.4 - Key Personnel and Resources |
| 26 |
| 4.4.10.1 states that all key personnel must be located at an IDHW-approved site for the entire DDI phase and that IDHW must approve the use of non-local staff and remote work. Please confirm if it is acceptable for our key staff to have periodic onsite visits in Idaho while completing the majority of the implementation work remotely. |
| See response to question #2. |
| 49 |
| 4.5 - Project Management |
| 28 |
| 4.5.14. The Contractor must adopt the IDHW Risk Management Plan and use IDHW-approved templates, tools, and methodology that outlines the process for identifying, documenting, assessing, responding to, monitoring, controlling, resolving, and reporting risks, action items, issues, and decisions. (17605 – DDI and M&O) |
Please provide the IDHW Risk Management Plan to review.
IDHW will provide the IDHW Risk Management Plan which includes all RAID related activities during onboarding.
| 50 |
| 4.5 - Project Management |
| 28 |
| 4.5.15 states: “The Contractor must have an acceptable documented risk mitigation plan submitted to IDHW within five (5) business days of risk identification for one-hundred percent (100%) of high or very high project risks. IDHW, after consulting with the Contractor, will determine the level of criticality of each project risk.” |
Does this include patches or is this just for risks to implementing the project as opposed to security risks?
All high or very high risks, regardless of risk type (security, patch, etc.), require a mitigation plan within five (5) business days of identification.
| 51 |
| 4.8 - Design, Configuration, Build |
| 32 |
| 4.8.15 mentions approved Interface Control Specifications. Can IDHW provide the ICS to potential vendors for review? |
| IDHW will provide examples of Interface Control Specifications during the Initiation phase of the DDI. |
| 52 |
| 4.8 - Design, Configuration, Build |
| 33 |
| 4.8.19 states: “The contractor’s solution must support up to two concurrent Application Programming Interface (API) interface versions as may be required by IDHW.” |
Can IDHW please explain what this requirement means and/or provide examples?
The Contractor’s solution must support multiple API versions concurrently, enabling the addition of new API functionalities while maintaining backward compatibility for existing consumers (e.g., providers, other modules) while new consumers or updated integrations use a newer version.
| 53 |
| 4.8 - Design, Configuration, Build |
| 33 |
| 4.8.25 states: “The Contractor’s solution must provide the capability to aggregate logs for effective management and analysis.” |
Please provide clarification as to who will be analyzing the logs.
The logs aggregated by the Contractor’s solution will be analyzed by authorized users within the Idaho Department of Health and Welfare (IDHW). These users will utilize the SI Hub’s centralized logging and Security Incident Event Management (SIEM) components to monitor system health, performance, and security events.
| 54 |
| 4.8 - Design, Configuration, Build |
| 34 |
| 4.8.43 states: “The Contractor’s dashboard solution must provide, configure, and operate tools, dashboards that are available twenty-four (24) hours a day, seven (7) days a week, three hundred sixty-five (365) days a year (except during approved maintenance windows).” |
Does IDHW mean the platform must be available 24/7/365 or the application? Please clarify.
Requirement 4.8.43 refers specifically to the dashboard application. Requirement 4.9.20 addresses platform availability.
| 55 |
| 4.9 - Hosting Environment |
| 35 |
| 4.9.2.8 states: “Exchange data using application interface patterns defined in the TRA to mimic production processing.” |
Please confirm that IDHW will provide an equivalent test environment on its side to ensure the exchange could be safely executed.
List of supported environments provided in requirement 4.9.1.
| 56 |
| 4.10 - Security |
| 38 |
| 4.10.10.1.1 states: “Identity Management using IDHW’s IdAM in a manner prescribed by IDHW,” |
Please clarify that this requirement is regarding access to applications and not our infrastructure.
This does not require access to vendor internal infrastructure.
| 57 |
| 4.10 - Security |
| 39 |
| 4.10.16 states: “The Contractor’s solution must incorporate security role-based data filters as approved by the department, at the user, field, and table level.” |
Please clarify where this is applicable, at the application level?
This requirement is about data access control within the EVV application. Specifically, it means role-based access must be enforced so that users only see or interact with data they are authorized to access, and filtering must occur at the user, field, and table levels.
| 58 |
| 4.10 - Security |
| 41 |
| 4.10.42 states: “The Contractor’s solution must enable IDHW to grant or deny access to authorized users based on geographic location.” |
Can you please give an example of a geographic location where IDHW might grant or deny access to an authorized user?
See response to question #10.
| 41 |
| 4.10.44 states: “The Contractor's solution must provide a configurable mechanism for the allowable number of concurrent sessions where one session is active, and the other session is inactive.” |
Clarification needed for this requirement.
The Contractor’s solution must comply with IDHW’s access and security policies by allowing configuration and enforcement of concurrent session limits per account, including differentiation between active and inactive sessions.
| 42 |
| 4.10.55 states: “The Contractor must provide the ability to configure all static graphical and text elements on the EVV home page once the user signs in.” |
Clarification needed for this requirement.
This requirement refers to the ability to configure any static graphical or text-based elements of the EVV home page that are visible to users after login. These elements include, but are not limited to, field names, page and subpage names, colors, graphics, icons, page headers, and footers. The goal is to ensure that the EVV solution is highly configurable to meet IDHW’s branding, accessibility, and usability standards without requiring custom code.
| 61 |
| 4.10 - Security |
| 43 |
| 4.10.63 states: “The Contractor must provide a completed Security Audit Report with results to IDHW by the thirtieth (30th) of September each year that complies with all standards specified in the TRA.” |
What does this report entail? Would the MARS-E report satisfy this requirement?
The TRA is included in the RFP Amendment.
| 62 |
| 4.11 - Data Conversion and Management |
| 43 |
| 4.11.9 states: “The Contractor must have the ability to send an 820 (Payment Order/Remittance Advice) Transaction Set.” |
Can IDHW provide a use case for this transaction?
The Contractor must submit transmission of an 820 file from the EVV system to the State’s financial system, to inform the payment system or provider of the remittance details to support automated provider payment reconciliation.
| 63 |
| 4.11 - Data Conversion and Management |
| 44 |
| 4.11.19 states: “The Contractor must transfer online archived data to off-line archives per the criteria and schedule(s) established with IDHW during the DDI phase.” |
Can IDHW clarify what offline archive it is referring to in this requirement?
The term “offline archive” in requirement 4.11.19 refers to any storage solution that is not accessible from or by the live system or production environment. This may include cold storage or other secure networked repositories. The specific format, location, and access protocols for offline archives will be defined collaboratively with IDHW during the DDI phase based on data retention policies, security requirements, and operational needs.
| 64 |
| 4.12 - Integration |
| 47 |
| 4.12.11 states: “The Contractor must coordinate with IDHW stakeholders and other module contractors on the release of new versions of applications, COTS products, SaaS, and other major components within the enterprise as directed by IDHW.” |
Is IDHW implying that the vendor would need the state’s permission to release its own app? Please clarify.
The requirement requires coordination with IDHW to ensure that the Contractor's release of a new version does not adversely impact IDHW systems, stakeholders, or other module contractors. This coordination ensures compatibility, continuity of operations, and alignment with enterprise-wide release schedules and dependencies. Releases that do not impact IDHW environments or integrations do not require coordination.
See response to question #30 Cloud T's&C's.
| 65 |
| 4.12 - Integration |
| 47 |
| 4.12.20 states: “The Contractor’s solution must ensure that all event notifications include aggregated and integrated information.” |
Please clarify if this is referring to user/app events or for infrastructure events.
This requirement applies to both user/application events and infrastructure events.
| 4.16 - Call Center |
| 56 |
| 4.16.5 states: “The Contractor must provide Call Center assistance to Medicaid Community Web Portal users. (17855 - M&O Only)” |
We need to know what the Medicaid Community Portal is and who its users are.
The EVV Contractor’s Call Center must provide support to all stakeholders of the IDHW EVV Portal, including but not limited to members, providers, IDHW staff, and system users.
| 68 |
| Terms and Conditions Document, Section 4.11.3 and 4 |
| 16 |
| This section refers to “State-written applications.” What are these? Does the State agree that a vendor’s subscription, cloud-based SAAS system is not a “State-written application”? |
| Yes, IDHW agrees that a vendor’s subscription, cloud-based SAAS system is not a “State-written application". |
A state-written application is a software application developed internally by IDHW or any application that the Contractor may develop for the state in addition to the vendor's subscription, cloud-based SaaS system.
See response to question #30 Cloud T's&C's.
| 69 |
| Terms and Conditions Document, Section 1.9.1 |
| 5 |
| Will the State consider adding the limitation “negligent, reckless or intentional” to modify the “Contractor’s acts or omissions” so it would read “Contractor’s negligent, reckless or intentional acts or omissions”? |
| No, the State will not add this limitation to liability as a matter of public policy. |
| 70 |
| Terms and Conditions Document, Section 1.9.1 |
| 5 |
| Will the State consider adding the limitation “negligent, reckless or intentional” to modify the “Contractor’s acts or omissions” so it would read “Contractor’s negligent, reckless or intentional acts or omissions”? |
| No, the State will not add this limitation to liability as a matter of public policy. |
| 71 |
| Operational Requirements / Workflow |
| p. 37–41 |
| The RFP outlines required functions (data capture, aggregation, reporting, and integration) but does not include a detailed end-to-end workflow. Does the State expect the contractor to propose a complete workflow as part of the Technical Proposal? Are there any preferred or mandated workflows (e.g., visit approvals, provider corrections, exception handling) that bidders must follow? |
| Yes, the Contractor should provide EVV relevant workflows supported by their solution. These workflow suggestions will be evaluated and leveraged as appropriate for IDHW's processes. |
| 72 |
| Objectives and Expectations – EVV Solution Scope |
| p. 3–7 |
| Please confirm: Is the contractor required to provide its own mobile or web-based EVV data collection tool for caregivers/providers, or is the contractor’s responsibility limited to aggregating and standardizing data from existing provider-selected EVV solutions? |
| See response to question #18. |
| 73 |
| Operational Requirements – Data Capture Methods |
| p. 37–41 |
| If providers use telephony/IVR systems or fixed visit verification devices, must the contractor support integration with those methods as part of the aggregator solution? |
| See response to question #18. |
| 74 |
| Operational Requirements – Access & Security |
| p. 37–45 |
| Could the State provide estimates for: the number of administrative users (IDHW staff) needing system access; the number of provider agency users/caregivers expected to access the EVV system monthly; and the expected peak concurrent users for capacity planning? |
| See response to question #16. |
| 75 |
| Training & Outreach Requirements |
| p. 91–97 |
| For provider, beneficiary, and IDHW end-user training: Is the contractor expected to deliver live training statewide? Or is the expectation to provide training materials for IDHW to distribute? |
| The Contractor is expected to deliver the training as specified in Requirements Section 4.15. |
| 76 |
| Objectives and Expectations – Provider Choice Model |
| p. 3–7 |
| Which external EVV vendors/platforms are currently in use, or expected under the Provider Choice Model? Will the State provide interface specifications or APIs for these systems? |
| IDHW's current EVV vendor is Sandata, subcontracted through Gainwell Technologies LLC. At this stage of the RFP process, IDHW will not be providing interface specifications, APIs, or details regarding third-party EVV vendors or systems utilized by individual providers. |
| 77 |
| System Integration Requirements (SI Hub / I-MIDAS) |
| p. 85–89 |
| For integrations with the MMIS Claims System, SI Hub, and I-MIDAS Data Warehouse, will IDHW provide interface specifications (data formats, APIs, transmission protocols)? |
| IDHW will provide interface specifications during the DDI phase. |
| 78 |
| Operational Requirements – Data Processing |
| p. 37–41 |
| What are the anticipated transaction volumes (e.g., daily visits, number of providers, number of Medicaid members) the EVV system must support? |
| See response to question #16. |
| 79 |
| Certification Requirements |
| p. 77–83 |
| Regarding CMS Streamlined Modular Certification (SMC): Will IDHW lead the certification process with CMS, or is the contractor fully responsible for preparing documentation, testing, and certification activities? |
| The PMO Certification Lead in alignment with IDHW Certification Lead will coordinate the effort to ensure the Contractor provides tested and certified evidence that is fully documented to IDHW prior to submission to CMS. |
| 80 |
| Hosting & Technical Architecture |
| p. 115–117 |
| The RFP allows for SaaS and cloud hosting (U.S.-based only). Does the State require hosting in a State-approved or FedRAMP-certified environment, or will any HIPAA/HITECH-compliant U.S.-based environment be acceptable? |
| See requirements 4.3.1 and 4.3.12 |
See response to question #30 Cloud T's&C's. Specifically referring to Section 10 Data Protection requirements 10.G Fedramp, which requires FedRAMP accredited cloud services.
| 81 |
| Reporting Requirements |
| p. 91–95 |
| Are report templates/requirements (KPI, fraud/waste/abuse, CMS compliance, training adoption) predefined by IDHW, or should the contractor design them in collaboration with the State? |
| IDHW will define the requirements for each report during the DDI phase and may provide templates of current reports at its discretion. The Contractor is responsible for designing report templates as needed and for generating reports based on direction provided by IDHW. |
| 82 |
| Objectives and Expectations – Claims Integration |
| p. 3–7 |
| The RFP references integration with the MMIS Claims System for financial management and claims adjudication. Is the contractor responsible only for transmitting verified EVV visit data to support claims payment? Or must the contractor also perform financial reporting, reconciliation, or payment-related functions? If financial reporting is required, could the State provide details on the specific data elements and reporting formats? |
| The Contractor is not responsible for performing financial reporting, reconciliation, or payment processing. The Contractor must validate and transmit EVV visit data to support claims and be capable of sending 820 transactions. |
Should financial reporting be required, it would be limited to EVV-related data (e.g., visit verification status, timestamps, and provider IDs) and not full financial reconciliation.
| 83 |
| Appendix B – SLAs & Liquidated Damages |
| p. 123–130 |
| Appendix B references SLA penalties. Could the State clarify the financial penalty structure (e.g., per incident, per day, annual maximums)? |
| Refer to table within Appendix F: SLA, includes a Liquidated Damages column that clearly states the penalty structure. |
| 84 |
| Key Personnel and Resources |
| p. 109–113 |
| Must the key personnel roles (Project Manager, Contract Manager, Technical Lead, Certification Lead) be dedicated 100% to the Idaho contract, or may they also support other projects if capacity is sufficient? |
| See response to question #1. |
| 85 |
| Transition & Contract Closeout |
| p. 101–105 |
| At contract end, will the contractor be required to maintain dual systems during transition, or only provide data transfer and knowledge handoff to IDHW or the next vendor? |
| The Contractor will be responsible for supporting a comprehensive transition process. This includes maintaining dual systems during the transition period, facilitating complete and accurate data transfer, and providing thorough knowledge handoff to IDHW and/or the incoming vendor. The Contractor will ensure continuity of operations, minimize disruptions, and fully support IDHW’s transition strategy. |
| 86 |
| Appendix B – SLAs |
| 76 |
| Many of the stated SLAs feel appropriate for a large-scale MMIS deployment, but are slightly less relevant for an EVV module. Would the State be amenable to potential revisions or modifications to some of the SLAs after discussion with shortlisted vendors selected for demo (or the final selected vendor), to allow for the possibility of clarification and/or identification of alternative means of satisfactory delivery? |
| See response to question #34. |
| 87 |
| Exhibit 2: Scope of Work Section 4.1 Operational Requirements, 4.1.25 |
| 19 |
| This section states: “4.1.25. The Contractor must provide a Service Level Agreement (SLA) Compliance Report, to be approved by IDHW. (17752 – DDI and M&O) |
| 4.1.25.1. | This deliverable must be completed monthly throughout the duration of the contract with a due date of the first (1st) business day of each month. |
| 4.1.25.2. | The report must include EVV uptime statistics, verification of all contractual SLAs that have been met, details on any contractual SLAs that have not been met, issues that have been addressed during the reporting period, and a detailed listing of all scheduled and unscheduled downtime.” |
In order to accurately reflect the prior month’s metrics, is the State amenable to revising this requirement for report delivery on the 5th business day of each month, to allow time for collection and verification of SLA metrics of the previous month?
IDHW agrees, SLA 4.1.25 has been updated in Exhibit 2: Scope of Work.
| 88 |
| Exhibit 2: Scope of Work |
Section 4.10 Security Requirements, 4.10.41
| 41 | |
| This section states: “4.10.41. | The Contractor must implement and support integration for all EVV Module functionality that includes, at minimum, problem resolution, incident management, and Event Management between IDHW and the Contractor managed security, governance, and monitoring tools. (17706 – DDI and M&O) |
| 4.10.41.1. | The tools must include, but are not limited to, Network Operations Center (NOC), antivirus, vulnerability, software licensing, Governance Risk and Compliance (GRC), penetration testing, code scanning and quality database auditing, cloud cost, backups, and CMS account transfer.” | |
Is it possible for the State to provide a list of previously-approved tools?
This requirement does not pertain to tools used by IDHW; rather, it addresses the tools used by the Contractor and how they will be integrated with IDHW—either through automation or defined processes.
| 89 |
| Exhibit 2: Scope of Work |
Section 4.10 Security Requirements, 4.10.43
| 41 |
| This sections states: “The Contractor must perform security scanning, as defined in the TRA Security Control Checklist (provided by IDHW after award) and in IDHW Policy 700-09 before every release; when regulatory recommendations for more frequent security scanning occur, those guidelines should take precedence. All critical and high vulnerabilities must be remediated. (17708 – DDI and M&O)” |
Is it possible to provide the TRA Security Control checklist during the proposal process so vendors can be aware of the process expected after award?
If the TRA is unavailable prior to award, can the State provide a preview of requirements related to 3rd party auditing, annual audits, and monthly reporting?
The TRA is included in the RFP Amendment.
See response to question #30 Cloud T's&C's.
| 90 |
| Appendix B – SLAs |
| 82 |
| Regarding the last SLA in the table, “Environment Refresh,” can the State provide an example or use case of when such a procedure may be necessary? |
| See response to question #40. |
| 91 |
| Appendix B – SLAs |
| 80 |
| Regarding the SLA titled “Resolution of Abnormal Test Results in a Period,” can the state clarify the types of tests that are expected to be executed under this SLA? |
| This SLA applies to any and all types of tests executed as part of the Contractor’s solution delivery and operations. This includes, but is not limited to, unit testing, integration testing, system testing, performance testing, security testing, and user acceptance testing. |