ConsHQs_Draft_SpecsV1.pdf

PDF 8 MB Posted

Attached to
J-301 GOJ-Consolidated Headquarters, Naval Support Activity, Marine Corps Base, Guam
Solicitation number
N62742CONS-HQ-MCBG
Issued by

About this file

This draft request for proposal provides plans and specifications for the construction of a consolidated headquarters facility at Naval Support Activity Marine Corps Base Guam. The project involves reinforced concrete construction with components such as exterior walls, flooring, foundation, windows, roofing, mechanical, electrical, and information systems. The estimated cost is between $100-150 million. Interested contractors are invited to submit questions or comments on the draft by December 22, 2020 to inform finalization of requirements. The notice specifies response procedures and advises contractors to monitor future solicitations which may be issued.

View the file

Other files

File Type Posted
ConsHQs_Draft_SpecsV2.pdf PDF
ConsHQs_Draft_DwgsV2.pdf PDF
ConsHQs_Draft_DwgsV1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO. 1639790

A/E CONTRACT NO.

N62742-15-D-0002

100% DBB SUBMITTAL

VOLUME 1 OF 2

J-301 GOJ - CONSOLIDATED HEADQUARTERS

US NAVSUPPACT MCGB, Guam

SUBMITTED BY:

ASMD LLC

733 Bishop Street, Suite 3100

Honolulu, HI 96813

SPECIFICATION PREPARED BY:

Architectural: Architects Hawaii Ltd.

Civil: SSFM International, Inc.

Landscape: Belt Collins Hawaii LLC

Structural/ATFP: Baldridge & Associates Structural Engineering Inc.

Mechanical: Stanley Consultants

Electrical: EMCE Consulting Engineers

Telecommunications: Stanley Consultants

Fire Protection: Coffman Engineers, Inc.

Sustainability: AMEL Technologies, Inc.

Elevator: Elevator Consulting Services

Submitted By: _________________________________ Date: _____________ __

Myles M. Michibata

REQUEST FOR PROPOSAL APPROVED BY:

Specification: __________________________________________________________

Mr. Clint Hashiba, P.E.

For Commander, NAVFAC Pacific: __________________________________________

Mr. Cey H. Murakami, P.E.

Date: _______________________ garret Text Box

PRE-FINAL (100%) DESIGN SUBMITTAL

J-301 GOJ – Consolidated Headquarters

US NAVSUPPACT MCB Guam

1639790

PROJECT TABLE OF CONTENTS Page 1

PROJECT TABLE OF CONTENTS

VOLUME 1

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 02.00 20 DESIGN, PROCUREMENT AND INSTALLATION OF FURNITURE,

FIXTURES AND EQUIPMENT

01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT

MANAGEMENT SYSTEM

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 20 QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.03 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (JRM-ESS)

01 57 19.04 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS (DPRI)

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT

INFORMATION (eOMSI)

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

PROJECT TABLE OF CONTENTS Page 2

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 20 00 FINISH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

06 61 17 HOMOGENEOUS QUARTZ SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 24 00 EXTERIOR FINISH SYSTEMS

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 56 00 FLUID-APPLIED ROOFING SYSTEM

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS, FRAMES AND WINDOW WALL

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT BASE

09 68 00 CARPETING

09 69 13 RIGID GRID ACCESS FLOORING

09 84 20 ACOUSTICAL WALL PANELS

09 90 00 PAINTS AND COATINGS

09 97 13.15 LOW VOC POLYSULFIDE INTERIOR COATING OF WELDED STEEL

PETROLEUM FUEL TANKS

09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES

DIVISION 10 - SPECIALTIES

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 14 53 TRAFFIC SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS AND HORIZONTAL PANELS

10 26 00 WALL AND DOOR PROTECTION

PROJECT TABLE OF CONTENTS Page 3

10 28 13 TOILET ACCESSORIES

10 35 00 FLAGPOLES

10 44 16 FIRE EXTINGUISHERS

10 71 13.13 STORM SHUTTERS

10 99 00 MISCELLANEOUS BUILDING SPECIALTIES

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 93 00 SITE FURNISHINGS

DIVISION 13 – SPECIAL CONSTRUCTION

13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

-- End of Project Table of Contents --

J-301 GOJ - Consolidated Headquarters 1639790

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

NO. SHEET

NO.

NAVFAC

DRAWING NO.

SHEET TITLE

1 G-001 COVER SHEET

2 G-002 SHEET INDEX

3 G-003 SHEET INDEX

4 G-004 CODE COMPLIANCE SUMMARY

5 G-005 CODE COMPLIANCE SITE PLAN

6 G-006 OVERALL GROUND FLOOR - LIFE SAFETY PLAN

7 G-007 OVERALL SECOND FLOOR - LIFE SAFETY PLAN

8 C-001 NOTES, LEGENDS, SYMBOLS AND ABBREVIATIONS

9 C-002 GENERAL CIVIL NOTE - 1

10 C-003 GENERAL CIVIL NOTE - 2

11 C-100 HORIZONTAL CONTROL PLAN

12 C-101 OVERALL LOCATION PLAN AND HAUL ROUTE

13 C-102 OVERALL EXISTING CONDITION PLAN

14 CD100 OVERALL DEMOLITION PLAN

15 CD501 EROSION CONTROL DETAILS - 1

16 CG101 OVERALL EROSION AND SEDIMENT CONTROL PLAN

17 CS101 OVERALL SITE PLAN

18 CS102 SITE PLAN - 1

DOCUMENT 00 01 15 Page 1

19 CS103 SITE PLAN - 2

20 CS104 SITE PLAN - 3

21 CS105 SITE PLAN - 4

22 CG121 OVERALL GRADING AND DRAINAGE PLAN

23 CG122 OVERALL GRADING AND DRAINAGE PLAN - 1

24 CG123 OVERALL GRADING AND DRAINAGE PLAN - 2

25 CG124 OVERALL GRADING AND DRAINAGE PLAN - 3

26 CG125 OVERALL GRADING AND DRAINAGE PLAN - 4

27 CG301 GRADING SECTIONS - 1

28 CG302 GRADING SECTIONS - 2

29 CG303 GRADING SECTIONS - 3

30 CG304 GRADING SECTIONS - 4

31 CG401 DETAILED GRADING PLAN - 1

32 CP301 PARKING LOT SECTION - 1

33 CP501 STRIPING AND SIGNAGE DETAILS

34 CP502 PAVEMENT DETAILS

35 CU101 OVERALL UTILITY PLAN

36 CU102 OVERALL DRAINAGE PLAN

37 CU103 DRAINAGE PLAN - 1

38 CU104 DRAINAGE PLAN - 2

39 CU105 DRAINAGE PLAN - 3

40 CU111 OVERALL WATERLINE AND SEWERLINE PLAN

41 CU112 WATERLINE AND SEWERLINE PLAN

42 CU201 DRAINAGE PLAN AND PROFILE - 1

43 CU202 DRAINAGE PLAN AND PROFILE - 1

44 CU203 DRAINAGE PLAN AND PROFILE - 2

45 CU204 DRAINAGE PLAN AND PROFILE - 2

46 CU205 DRAINAGE PLAN AND PROFILE - 3

DOCUMENT 00 01 15 Page 2

47 CU206 DRAINAGE PLAN AND PROFILE - 4

48 CU207 DRAINAGE CULVERT PROFILE

49 CU208 WATERLINE PLAN AND PROFILE

50 CU209 FIRELINE PLAN AND PROFILE - 1

51 CU210 FIRELINE PLAN AND PROFILE - 1

52 CU211 FIRELINE PLAN AND PROFILE - 2

53 CU212 SEWERLINE PLAN AND PROFILE

54 CU501 UTILITY DETAILS - 1

55 CU502 UTILITY DETAILS - 2

56 CU503 UTILITY DETAILS - 3

57 CU504 UTILITY DETAILS - 4

58 CU505 UTILITY DETAILS - 5

59 L-101 OVERALL LANDSCAPE SITE PLAN

60 LP101 LANDSCAPE PLAN - SHEET 1

61 LP102 LANDSCAPE PLAN - SHEET 2

62 LP103 LANDSCAPE PLAN - SHEET 3

63 LP104 LANDSCAPE PLAN - SHEET 4

64 LP501 HARDSCAPE DETAILS

65 LP502 PLANTING DETAILS

66 LP601 PLANT MATERIAL SCHEDULE AND NOTES

67 S-001 GENERAL NOTES

68 S-002 GENERAL NOTES

69 S-003 GENERAL NOTES

70 S-004 FIRST FLOOR LOADING KEY PLAN

71 S-005 SECOND FLOOR & LOWER ROOF LOADING KEY PLAN

72 S-006 UPPER ROOF LOADING KEY PLAN

73 S-007 SECOND FLOOR ROOF WIND PRESSURE PLAN

74 S-008 UPPER ROOF WIND PRESSURE PLAN

DOCUMENT 00 01 15 Page 3

75 S-111 OVERALL FIRST FLOOR FOUNDATION PLAN

76 S-112 PARTIAL FIRST FLOOR FOUNDATION PLAN

77 S-113 PARTIAL FIRST FLOOR FOUNDATION PLAN

78 S-114 PARTIAL FIRST FLOOR FOUNDATION PLAN

79 S-121 OVERALL SECOND FLOOR FRAMING PLAN

80 S-122 PARTIAL SECOND FLOOR FRAMING PLAN

81 S-123 PARTIAL SECOND FLOOR FRAMING PLAN

82 S-124 EMERGENCY GENERATOR & ELECTRICAL ROOF FRAMING PLAN

83 S-131 OVERALL ROOF FRAMING PLAN

84 S-132 PARTIAL ROOF FRAMING PLAN

85 S-133 PARTIAL ROOF FRAMING PLAN

86 S-141 ANTENNA PAD ROOF FRAMING PLAN

87 S-201 TYPICAL CONCRETE WALL DETAILS

88 S-202 TYPICAL CONCRETE WALL DETAILS

89 S-203 TYPICAL CONCRETE WALL DETAILS

90 S-211 EXTERIOR WALL ELEVATIONS

91 S-212 EXTERIOR WALL ELEVATIONS

92 S-213 EXTERIOR WALL ELEVATIONS

93 S-214 EXTERIOR WALL ELEVATIONS

94 S-215 EXTERIOR WALL ELEVATIONS

95 S-216 EXTERIOR WALL ELEVATIONS

96 S-217 INTERIOR WALL ELEVATIONS

97 S-301 SLAB-ON GRADE DETAILS

98 S-302 FOUNDATION DETAILS

99 S-303 FOUNDATION DETAILS

100 S-304 FOUNDATION DETAILS

101 S-305 FOUNDATION DETAILS

102 S-401 CONCRETE COLUMN SCHEDULE & DETAILS

DOCUMENT 00 01 15 Page 4

103 S-402 CONCRETE PILASTER SCHEDULE & DETAILS

104 S-501 CONCRETE BEAM SCHEDULE

105 S-502 CONCRETE BEAM DETAILS

106 S-503 CONCRETE BEAM DETAILS

107 S-511 REINFORCED CONCRETE SLAB TYPICAL DETAIL

108 S-601 CONCRETE FRAMING DETAILS

109 S-602 CONCRETE FRAMING DETAILS

110 S-603 CONCRETE FRAMING DETAILS

111 S-604 CONCRETE FRAMING DETAILS

112 S-605 CONCRETE FRAMING DETAILS

113 S-606 ROOF DETAILS

114 S-607 ROOF DETAILS

115 S-608 ROOF DETAILS

116 S-609 ROOF DETAILS

117 S-701 TYPICAL CMU WALL DETAILS

118 S-702 TYPICAL CMU WALL DETAILS

119 S-801 STAIR 1 - SECTIONS & DETAILS

120 S-802 STAIR 2 - SECTIONS & DETAILS

121 S-901 MISCELLANEOUS DETAILS

122 A-001 ABBREVIATIONS, LEGEND SYMBOLS & GENERAL NOTES

123 AS-101 ARCHITECTURAL SITE PLAN

124 AS-102 CHILLER ENCLOSURE PLAN, EXTERIOR ELEVATIONS AND

SECTION

125 AS-103 TRANSFORMER ENCLOSURE PLAN, EXTERIOR ELEVATIONS AND

SECTION

126 AS-104 TRASH ENCLOSURE PLAN, EXTERIOR ELEVATIONS AND SECTION

127 AS-105 SITE SIGNAGE

128 AS-106 SITE DETAILS

129 AS-107 FUEL TANK ENCLOSURE, EXTERIOR ELEVATIONS AND SECTION

130 AS-108 SITE DETAILS

DOCUMENT 00 01 15 Page 5

131 A-101 OVERALL GROUND FLOOR PLAN

132 A-102 OVERALL SECOND FLOOR PLAN

133 A-103 OVERALL ROOF PLAN

134 A-104 PARTIAL ENLARGED GROUND FLOOR PLAN

135 A-105 PARTIAL ENLARGED GROUND FLOOR PLAN

136 A-106 PARTIAL ENLARGED GROUND FLOOR PLAN

137 A-107 PARTIAL ENLARGED GROUND FLOOR PLAN

138 A-108 PARTIAL ENLARGED GROUND FLOOR PLAN

139 A-109 PARTIAL ENLARGED GROUND FLOOR PLAN

140 A-110 PARTIAL ENLARGED GROUND FLOOR PLAN

141 A-111 PARTIAL ENLARGED SECOND FLOOR PLAN

142 A-112 PARTIAL ENLARGED SECOND FLOOR PLAN

143 A-113 PARTIAL ENLARGED SECOND FLOOR PLAN

144 A-114 PARTIAL ENLARGED SECOND FLOOR PLAN

145 A-115 PARTIAL ENLARGED SECOND FLOOR PLAN

146 A-116 PARTIAL ENLARGED SECOND FLOOR PLAN

147 A-117 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

148 A-118 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

149 A-119 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

150 A-120 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

151 A-121 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

152 A-122 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

153 A-123 PARTIAL ENLARGED GROUND REFLECTED CEILING PLAN

154 A-124 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

155 A-125 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

156 A-126 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

157 A-127 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

158 A-128 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

DOCUMENT 00 01 15 Page 6

159 A-129 PARTIAL ENLARGED SECOND REFLECTED CEILING PLAN

160 A-201 EXTERIOR ELEVATIONS

161 A-202 EXTERIOR ELEVATIONS

162 A-301 BUILDING SECTIONS

163 A-302 BUILDING SECTIONS

164 A-303 BUILDING SECTIONS

165 A-304 WALL SECTIONS

166 A-305 WALL SECTIONS

167 A-401 INTERIOR ELEVATIONS

168 A-402 INTERIOR ELEVATIONS

169 A-403 INTERIOR ELEVATIONS

170 A-404 INTERIOR ELEVATIONS

171 A-405 INTERIOR ELEVATIONS

172 A-406 INTERIOR ELEVATIONS

173 A-407 INTERIOR ELEVATIONS

174 A-408 INTERIOR ELEVATIONS

175 A-409 INTERIOR ELEVATIONS

176 A-410 INTERIOR ELEVATIONS

177 A-411 INTERIOR ELEVATIONS

178 A-412 INTERIOR ELEVATIONS

179 A-413 INTERIOR ELEVATIONS

180 A-414 ENLARGED RESTROOM PLANS AND ELEVATIONS

181 A-415 ENLARGED SHOWER PLANS AND ELEVATIONS

182 A-416 ENLARGED STAIR PLANS AND SECTION

183 A-417 ENLARGED STAIR/ELEVATOR PLANS AND SECTIONS

184 A-418 ENLARGED ANTENNA PAD PLAN

185 A-419 GENERATOR ROOM INTERIOR ELEVATION

186 A-501 TYPICAL MOUNTING HEIGHTS

DOCUMENT 00 01 15 Page 7

187 A-502 PARTITION TYPES

188 A-503 FIRST FLOOR COLUMN DETAILS

189 A-504 FIRST FLOOR COLUMN DETAILS

190 A-505 SECOND FLOOR COLUMN DETAILS

191 A-601 DOOR AND WINDOW TYPES, WINDOW SCHEDULE

192 A-602 DOOR SCHEDULE

193 A-603 DOOR SCHEDULE

194 A-604 DOOR DETAILS

195 A-605 DOOR DETAILS

196 A-606 DOOR DETAILS

197 A-607 WINDOW DETAILS

198 A-608 WINDOW DETAILS

199 A-614 SIGNAGE PLAN -GROUND FLOOR

200 A-615 SIGNAGE PLAN -GROUND FLOOR

201 A-616 SIGNAGE PLAN - SECOND FLOOR

202 A-617 SIGNAGE PLAN - SECOND FLOOR

203 A-618 SIGN SCHEDULE

204 A-619 SIGN TYPES

205 A-701 CEILING DETAILS

206 A-710 CASEWORK DETAILS

207 A-720 STAIR/RAILING DETAILS

208 A-730 MISCELLANEOUS INTERIOR DETAILS

209 A-731 MISCELLANEOUS INTERIOR DETAILS

210 A-732 MISCELLANEOUS INTERIOR DETAILS

211 A-740 ROOF DETAILS

212 A-750 MISCELLANEOUS EXTERIOR DETAILS

213 A-751 MISCELLANEOUS EXTERIOR DETAILS

214 AI-101 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

DOCUMENT 00 01 15 Page 8

215 AI-102 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

216 AI-103 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

217 AI-104 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

218 AI-105 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

219 AI-106 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

220 AI-107 PARTIAL ENLARGED GROUND FLOOR FINISH PLAN

221 AI-108 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

222 AI-109 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

223 AI-110 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

224 AI-111 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

225 AI-112 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

226 AI-113 PARTIAL ENLARGED SECOND FLOOR FINISH PLAN

227 I-800 GROUND FLOOR - OVERALL FURNITURE PLAN

228 I-801 SECOND FLOOR - OVERALL FURNITURE PLAN

229 I-802 FF+E SCHEDULE

230 I-803 ENLARGED GROUND FLOOR FF+E PLAN

231 I-804 ENLARGED GROUND FLOOR FF+E PLAN

232 I-805 ENLARGED GROUND FLOOR FF+E PLAN

233 I-806 ENLARGED GROUND FLOOR FF+E PLAN

234 I-807 ENLARGED GROUND FLOOR FF+E PLAN

235 I-808 ENLARGED GROUND FLOOR FF+E PLAN

236 I-809 ENLARGED 2ND FLOOR FF+E PLAN

237 I-810 ENLARGED 2ND FLOOR FF+E PLAN

238 I-811 ENLARGED 2ND FLOOR FF+E PLAN

239 I-812 ENLARGED 2ND FLOOR FF+E PLAN

240 I-813 ENLARGED 2ND FLOOR FF+E PLAN

241 I-814 ENLARGED 2ND FLOOR FF+E PLAN

242 P-001 PLUMBING LEGEND

DOCUMENT 00 01 15 Page 9

243 P-104 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

244 P-105 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

245 P-106 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

246 P-107 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

247 P-108 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

248 P-109 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

249 P-110 SANITARY - PARTIAL ENLARGED GROUND FLOOR PLAN

250 P-111 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

251 P-112 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

252 P-113 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

253 P-114 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

254 P-115 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

255 P-116 SANITARY - PARTIAL ENLARGED SECOND FLOOR PLAN

256 P-204 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

257 P-205 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

258 P-206 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

259 P-207 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

260 P-208 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

261 P-209 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

262 P-210 PLUMBING - PARTIAL ENLARGED GROUND FLOOR PLAN

263 P-211 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

264 P-212 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

265 P-213 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

266 P-214 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

267 P-215 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

268 P-216 PLUMBING - PARTIAL ENLARGED SECOND FLOOR PLAN

269 P-400 ENLARGED PLANS

270 P-501 PLUMBING DETAILS - SHEET 1

DOCUMENT 00 01 15 Page 10

271 P-502 PLUMBING DETAILS - SHEET 2

272 P-503 PLUMBING DETAILS - SHEET 3

273 P-600 PLUMBING SCHEMATIC DIAGRAMS - GROUND FLOOR

274 P-601 PLUMBING SCHEMATIC DIAGRAMS - SECOND FLOOR

275 P-602 PLUMBING SCHEMATIC DIAGRAMS - SECOND FLOOR

276 P-701 PLUMBING SCHEDULES

277 M-503 HAVC DETAILS - SHEET 3

278 M-505 HVAC DETAILS - SHEET 5

279 M-001 HVAC LEGEND

280 M-002 PIPING LEGEND

281 M-003 FUEL OIL SYSTEM LEGEND

282 M-100 MECHANICAL SITE PLAN

283 M-104 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

284 M-105 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

285 M-106 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

286 M-107 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

287 M-108 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

288 M-109 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

289 M-110 HVAC - PARTIAL ENLARGED GROUND FLOOR PLAN

290 M-111 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

291 M-112 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

292 M-113 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

293 M-114 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

294 M-115 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

295 M-116 HVAC - PARTIAL ENLARGED SECOND FLOOR PLAN

296 M-204 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

297 M-205 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

298 M-206 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

DOCUMENT 00 01 15 Page 11

299 M-207 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

300 M-208 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

301 M-209 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

302 M-210 HVAC PIPING - PARTIAL ENLARGED GROUND FLOOR PLAN

303 M-211 HVAC PIPING - PARTIAL ENLARGED SECOND FLOOR PLAN

304 M-212 HVAC PIPING - PARTIAL ENLARGED SECOND FLOOR PLAN

305 M-213 HVAC PIPING - PARTIAL ENLARGED SECOND FLOOR PLAN

306 M-214 HVAC PIPING - PARTIAL ENLARGED SECOND FLOOR PLAN

307 M-215 HVAC PIPING - PARTIAL ENLARGED SECOND FLOOR PLAN

308 M-301 HVAC SECTIONS - SHEET 1

309 M-302 HVAC SECTIONS - SHEET 2

310 M-501 HVAC DETAILS - SHEET 1

311 M-502 HVAC DETAILS - SHEET 2

312 M-504 HVAC DETAILS - SHEET 4

313 M-506 HVAC DETAILS - SHEET 6

314 M-507 HVAC DETAILS - SHEET 7

315 M-508 HVAC DETAILS - SHEET 8

316 M-509 HVAC DETAILS - SHEET 9

317 M-510 HVAC DETAILS - SHEET 10

318 M-511 HVAC DETAILS - SHEET 11

319 M-512 FUEL OIL SYSTEM DETAILS - SHEET 1

320 M-513 FUEL OIL SYSTEM DETAILS - SHEET 2

321 M-514 FUEL OIL SYSTEM DETAILS - SHEET 3

322 M-515 FUEL OIL SYSTEM DETAILS - SHEET 4

323 M-601 HVAC SCHEMATICS - SHEET 1

324 M-602 HVAC SCHEMATICS - SHEET 2

325 M-603 HVAC SCHEMATICS - SHEET 3

326 M-604 HVAC SCHEMATICS - SHEET 4

DOCUMENT 00 01 15 Page 12

327 M-701 MECHANICAL SCHEDULES - SHEET 1

328 M-702 MECHANICAL SCHEDULES - SHEET 2

329 M-703 MECHANICAL SCHEDULES - SHEET 3

330 M-704 MECHANICAL SCHEDULES - SHEET 4

331 E-001 ELECTRICAL SYMBOL LIST

332 ES101 OVERALL ELECTRICAL SITE PLAN

333 ES102 ELECTRICAL SITE PLAN 1

334 ES103 ELECTRICAL SITE PLAN 2

335 ES104 ELECTRICAL SITE PLAN 3

336 E-101 ELECTRICAL OVERALL GROUND FLOOR PLAN

337 E-102 ELECTRICAL OVERALL SECOND FLOOR PLAN

338 EG101 LIGHTNING PROTECTION PLAN - 1

339 EG102 ENLARGED ANTENNA PAD LIGHTING PROTECTION PLAN

340 EL101 PARTIAL GROUND FLOOR LIGHTING PLAN - 1

341 EL102 PARTIAL GROUND FLOOR LIGHTING PLAN - 2

342 EL103 PARTIAL ENLARGED GROUND FLOOR LIGHTING PLAN - 3

343 EL104 PARTIAL ENLARGED GROUND FLOOR LIGHTING PLAN - 4

344 EL105 PARTIAL ENLARGED GROUND FLOOR LIGHITNGPLAN - 5

345 EL106 PARTIAL ENLARGED GROUND FLOOR LIGHTING PLAN - 6

346 EL107 PARTIAL GROUND FLOOR LIGHTING PLAN - 7

347 EL111 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 1

348 EL112 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 2

349 EL113 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 3

350 EL114 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 4

351 EL115 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 5

352 EL116 PARTIAL ENLARGED SECOND FLOOR LIGHTING PLAN - 6

353 EP101 PARTIAL ENLARGED GROUND FLOOR POWER PLAN -1

354 EP102 PARTIAL ENLARGED GROUND FLOOR POWER PLAN - 2

DOCUMENT 00 01 15 Page 13

355 EP103 PARTIAL ENLARGED GROUND FLOOR POWER PLAN - 3

356 EP104 PARTIAL ENLARGED GROUND FLOOR PLAN - 4

357 EP105 PARTIAL ENLARGED GROUND FLOOR POWER PLAN - 5

358 EP106 PARTIAL ENLARGED GROUND FLOOR POWER PLAN - 6

359 EP107 PARTIAL ENLARGED GROUND FLOOR POWER PLAN - 7

360 EP111 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 1

361 EP112 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 2

362 EP113 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 3

363 EP114 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 4

364 EP115 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 5

365 EP116 PARTIAL ENLARGED SECOND FLOOR POWER PLAN - 6

366 E-401 ENLARGED ELECTRICAL PLAN - 1

367 E-402 ENLARGED ELECTRICAL PLAN - 2

368 E-403 ENLARGED ELECTRICAL PLAN - 3

369 E-404 ELEVATOR PIT, HOISTWAY AND STAIR SECTIONS

370 E-501 MISCELLANEOUS DETAILS - 1

371 E-502 MISCELLANEOUS DETAILS - 2

372 E-503 MISCELLANEOUS DETAILS - 3

373 E-504 MISCELLANEOUS DETAILS - 4

374 E-505 MISCELLANEOUS DETAILS - 5

375 E-506 MISCELLANEOUS DETAILS - 6

376 E-507 MISCELLANEOUS DETAILS - 7

377 E-508 MISCELLANEOUS DETAILS - 8

378 E-509 MISCELLANEOUS DETAILS - 9

379 E-510 MISCELLANEOUS DETAILS - 10

380 E-601 PRIMARY ONE LINE DIAGRAM

381 E-602 SECONDARY ONE LINE DIAGRAM -1

382 E-603 SECONDARY ONE LINE DIAGRAM - 2

DOCUMENT 00 01 15 Page 14

383 E-604 GROUNDING DIAGRAM - 1

384 E-605 GROUNDING DIAGRAM - 2

385 E-606 CONTROL WIRING DIAGRAM - 1

386 E-607 CONTROL WIRING DIAGRAM - 2

387 E-608 CONTROL WIRING DIAGRAM - 3

388 E-609 CONTROL WIRING DIAGRAM - 4

389 E-610 CONTROL WIRING DIAGRAM - 5

390 E-611 CONTROL WIRING DIAGRAM - 6

391 E-612 CONTROL WIRING DIAGRAM - 7

392 E-613 CONTROL WIRING DIAGRAM - 8

393 E-614 CONTROL WIRING DIAGRAM - 9

394 E-615 CONTROL WIRING DIAGRAM - 10

395 E-616 CONTROL WIRING DIAGRAM - 11

396 E-617 CONTROL WIRING DIAGRAM - 12

397 E-618 CONTROL WIRING DIAGRAM - 13

398 E-619 MISCELLANEOUS DIAGRAMS - 1

399 E-620 MISCELLANEOUS DIAGRAMS - 2

400 E-621 LIGHTING CONTROL PANEL SCHEDULE -1

401 E-622 LIGHTING CONTROL PANEL SCHEDULE -2

402 E-623 LIGHT FIXTURE SCHEDULE - 1

403 E-624 LIGHT FIXTURE SCHEDULE - 2

404 E-625 PANEL SCHEDULES 1

405 E-626 PANEL SCHEDULES 2

406 E-627 PANEL SCHEDULES 3

407 E-628 PANEL SCHEDULES 4

408 E-629 PANEL SCHEDULES 5

409 E-630 PANEL SCHEDULE 6

410 E-631 PANEL SCHEDULE 7

DOCUMENT 00 01 15 Page 15

411 E-632 PANEL SCHEDULE 8

412 E-633 PANEL SCHEDULE 9

413 E-634 PANEL SCHEDULE 10

414 E-635 PANEL SCHEDULE 11

415 E-636 PANEL SCHEDULE 12

416 E-637 INTERIOR AND EXTERIOR LIGHTING REQUIREMENT 1

417 ET100 TELECOM - SITE PLAN

418 T-001 TELECOMMUNICATIONS LEGEND

419 T-101 OVERALL TELECOM GROUND FLOOR PLAN

420 T-102 OVERALL TELECOM SECOND FLOOR PLAN

421 T-104 TELECOM GROUND FLOOR PLAN - AREA 1A

422 T-105 TELECOM GROUND FLOOR PLAN - AREA 1B

423 T-106 TELECOM GROUND FLOOR PLAN - AREA 1C

424 T-107 TELECOM GROUND FLOOR PLAN - AREA 1D

425 T-108 TELECOM GROUND FLOOR PLAN - AREA 1E

426 T-109 TELECOM GROUND FLOOR PLAN - AREA 1F

427 T-110 TELECOM GROUND FLOOR PLAN - AREA 1G

428 T-111 TELECOM SECOND FLOOR PLAN - AREA 2A

429 T-112 TELECOM SECOND FLOOR PLAN - AREA 2B

430 T-113 TELECOM SECOND FLOOR PLAN - AREA 2C

431 T-114 TELECOM SECOND FLOOR PLAN - AREA 2D

432 T-115 TELECOM SECOND FLOOR PLAN - AREA 2E

433 T-116 TELECOM SECOND FLOOR PLAN - AREA 2F

434 T-120 UNCLASSIFIED CABLE TRAY PLAN

435 T-121 CLASSIFIED CABLE TRAY PLAN

436 T-301 TELECOMMUNICATION CABINET ELEVATIONS - GTR1 RM 1-126

ROW A

437 T-302 TELECOMMUNICATIONS CABINET ELEVATIONS - GTR1 RM 1-126

ROW B AND C

438 T-303 TELECOMMUNICATIONS CABINET ELEVATIONS - GTR2 RM 2-118

ROW A

DOCUMENT 00 01 15 Page 16

439 T-304 TELECOMMUNICATIONS CABINET ELEVATIONS - GTR2 RM 2-118

ROW A

440 T-305 TELECOMMUNICATION CABINET ELEVATIONS - RF ROOM RM

2-123

441 T-306 TELECOMMUNICATION CABINET ELEVATIONS - CTR

442 T-401 ENLARGED TELECOM ROOM PLANS - SHEET 1

443 T-402 ENLARGED TELECOM ROOM PLANS - SHEET 2

444 T-403 ENLARGED TELECOM ROOM PLANS - SHEET 3

445 T-404 ENLARGED ANTENNA PAD TELECOMMUNICATIONS PLAN

446 T-501 TELECOMMUNICATIONS DETAILS - SHEET 1

447 T-502 TELECOMMUNICATIONS DETAILS - SHEET 2

448 T-503 TELECOMMUNICATIONS DETAILS - SHEET 3

449 T-504 TELECOMMUNICATIONS DETAILS - SHEET 4

450 T-505 TELECOMMUNICATIONS DETAILS - SHEET 5

451 T-506 TELECOMMUNICATIONS DETAILS - SHEET 6

452 T-507 TELECOMMUNICATIONS DETAILS - SHEET 7

453 T-508 TELECOMMUNICATIONS DETAILS - SHEET 8

454 T-509 TELECOMMUNICATIONS DETAILS - SHEET 9

455 T-601 UNCLASSIFIED BACKBONE RISER DIAGRAM

456 T-602 GTR1 RISER DIAGRAM 1ST FLOOR

457 T-603 GTR1A RISER DIAGRAMS 1ST FLOOR

458 T-604 CTR2, RF AND GTR2 RISER DIAGRAM 2ND FLOOR

459 TY603 CATV RISER DIAGRAM

460 T-605 TELECOMMUNICATIONS GROUNDING RISER DIAGRAM

461 TY101 OVERALL SPECIAL SYSTEMS GROUND FLOOR PLAN

462 TY102 OVERALL SPECIAL SYSTEMS SECOND FLOOR PLAN

463 TY104 SPECIAL SYSTEMS GROUND FLOOR - AREA 1A

464 TY105 SPECIAL SYSTEMS GROUND FLOOR - AREA 1B

465 TY106 SPECIAL SYSTEMS GROUND FLOOR - AREA 1C

466 TY107 SPECIAL SYSTEMS GROUND FLOOR - AREA 1D

DOCUMENT 00 01 15 Page 17

467 TY108 SPECIAL SYSTEMS GROUND FLOOR - AREA 1E

468 TY109 SPECIAL SYSTEMS GROUND FLOOR - AREA 1F

469 TY110 SPECIAL SYSTEMS GROUND FLOOR - AREA 1G

470 TY111 SPECIAL SYSTEMS SECOND FLOOR - AREA 2A

471 TY112 SPECIAL SYSTEMS SECOND FLOOR - AREA 2B

472 TY113 SPECIAL SYSTEMS SECOND FLOOR - AREA 1C

473 TY114 SPECIAL SYSTEMS SECOND FLOOR - AREA 2D

474 TY115 SPECIAL SYSTEMS SECOND FLOOR - AREA 2E

475 TY116 SPECIAL SYSTEMS SECOND FLOOR - AREA 2F

476 TY501 SPECIAL SYSTEMS DETAILS - ESS DETAILS

477 TY502 RESCUE ASSISTANCE RISER DIAGRAM

478 TY601 SPECIAL SYSTEMS RISER DIAGRAM - ESS RISER DIAGRAM

GOUND FLOOR

479 TY602 SPECIAL SYSTEMS RISER DIAGRAM - ESS RISER DIAGRAM

SECOND FLOOR

480 FX001 FIRE SUPPRESSION SYSTEM NOTES AND LEGEND

481 FX101 OVERALL GROUND FLOOR - FIRE SUPPRESSION SYSTEM PLAN

482 FX102 OVERALL SECOND FLOOR - FIRE SUPPRESSION SYSTEM PLAN

483 FX103 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

484 FX104 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

485 FX105 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

486 FX106 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

487 FX107 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

488 FX108 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

489 FX109 PARTIAL ENLARGED GROUND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

490 FX110 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

491 FX111 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

492 FX112 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

493 FX113 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

494 FX114 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

DOCUMENT 00 01 15 Page 18

495 FX115 PARTIAL ENLARGED SECOND FLOOR - FIRE SUPPRESSION

SYSTEM PLAN

496 FX501 FIRE SUPPRESSION SYSTEM DETAILS-1

497 FX502 FIRE SUPPRESSION SYSTEM DETAILS-2

498 FA001 FIRE ALARM-MASS NOTIFICATION SYSTEM NOTES AND LEGEND

499 FA101 OVERALL GROUND FLOOR - FIRE ALARM-MASS NOTIFICATION

SYSTEM PLAN

500 FA102 OVERALL SECOND FLOOR - FIRE ALARM-MASS NOTIFICATION

SYSTEM PLAN

501 FA103 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

502 FA104 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

503 FA105 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

504 FA106 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

505 FA107 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

506 FA108 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

507 FA109 PARTIAL ENLARGED GROUND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

508 FA110 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

509 FA111 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

510 FA112 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

511 FA113 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

512 FA114 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

513 FA115 PARTIAL ENLARGED SECOND FLOOR - FIRE ALARM-MASS

NOTIFICATION SYSTEM PLAN

514 FA501 FIRE ALARM-MASS NOTIFICATION SYSTEM DETAILS

515 FA601 FIRE ALARM-MASS NOTIFICATION SYSTEM SEQUENCE OF

OPERATIONS

DOCUMENT 00 01 15 Page 19

516 FA602 FIRE ALARM-MASS NOTIFICATION SYSTEM RISER DIAGRAM

-- End of Document --

DOCUMENT 00 01 15 Page 20

US NAVSUPPACT MCB Guam 100% nsbmittal dtd 11-17-2020

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes constructing a consolidated headquarters facility for the 3rd Marine Expeditionary Brigade (MEB), 4th Marine Regiment, and two Infantry Battalions at Naval Support Activity (NSA) Marine Corps Base (MCB) Guam consisting of reinforced concrete with all components such as, exterior walls, flooring, foundation, windows, roofing, mechanical, electrical, and informational systems appropriate to Guam earthquake and environmental conditions, and designed to meet applicable Unified Facility Criteria (UFC). Support facilities include utilities, site improvements, emergency generator, access roads, parking, and incidental related work.

1.1.2 Location

The work is located at the Marine Corps Base, Finegayan, Guam, approximately as indicated.

1.2 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.3 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact Contracting Officer prior to excavating, to mark utilities and to verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be

SECTION 01 11 00 Page 1 made.

1.3.1 Notification Prior to Excavation

Notify the Contracting Officer at least 30 calendar days prior to starting excavation work.

1.4 COMPUTER/TELECOMMUNICATION/ACCESS CONTROL/IDS COORDINATION REQUIREMENTS

1.4.1 Computer/Telecommunication/Access Control/IDS Contractor Access

Allow the Computer/Telecommunication/Access Control/IDS Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the Computer/Telecommunication/Access Control/IDS Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the Computer/Telecommunication/Access Control/IDS Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 State

"State" when used in reference to states of the United States also includes the Territory of Guam.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

Personnel List; G

1.3 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

1.4 CONTRACTOR ACCESS AND USE OF PREMISES

1.4.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.4.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an

SECTION 01 14 00 Page 1 emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.4.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.4.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.

1.4.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

SECTION 01 14 00 Page 2

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.4.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.4.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.4.2 Working Hours

Regular working hours must consist of an 8 1/2 hour period between 7:30 a.m. and 4:30 p.m., Monday through Friday, excluding Government holidays.

1.4.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Notify Contracting Officer 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.

During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.4.4 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, fire alarm, and compressed air, are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours.

This time limit includes time for deactivation and reactivation.

SECTION 01 14 00 Page 3

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

e. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain.If required, obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection and in accordance with Section 33 30 00 SANITARY SEWERAGE.

1.5 SECURITY REQUIREMENTS

1.5.1 Personnel List

Submit for approval, at least 21 calendar days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

a. Name

b. Date and place of birth

c. Citizenship

d. Home address

e. Social security number

f. Current pass expiration date

g. Naturalization or Alien Registration or Temporary Non-Immigrant ID card number

h. Passport number, place of issue, and expiration date

i. Guam Police clearance report for last six months

The request for personnel passes must be accompanied with the following certification:

"I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated or Temporary Non-Immigrant with the Temporary Non-Immigrant ID card number shown."

Signature/Firm Name

1.5.1.1 Citizenship Requirements

Aliens will not be admitted to the work site without approval. Clearance for aliens may require approximately 21 work days for approval.

PART 2 PRODUCTS

Not used.

SECTION 01 14 00 Page 4

PART 3 EXECUTION

Not used.

SECTION 01 14 00 Page 5

SECTION 01 20 00.00 20

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Earned Value Report; G

1.2 EARNED VALUE REPORT

1.2.1 Data Required

This contract requires the use of a cost-loaded Network Analysis Schedule (NAS). Schedule of Prices must not be used with cost-loaded Network Analysis Schedule (NAS). Use Earned Value Report derived from cost-loaded NAS. Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.

Within 30 calendar days of contract award, prepare and deliver to the Contracting Officer an Earned Value Report (construction contract) as directed by the Contracting Officer. Earned Value Report must have cost summarized and totals provided for each construction category.

1.2.2 Schedule Instructions

Payments will not be made until the Earned Value Report from the cost-loaded NAS has been submitted to and accepted by the Contracting Officer. Earned Value Report must identify the cost for site work, and include incidental work to the 5 ft line. Identify costs for the building(s), and include work out to the 5 ft line. Work out to the 5 ft line shall include construction encompassed within a theoretical line 5 ft from the face of exterior walls and shall include attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 ft line.

1.2.3 Real Property Assets

The Government will provide the Draft DD Form 1354, Transfer and Acceptance of Military Real Property filled in with the appropriate Real Property Unique Identifiers (RPUID) and related construction Category Codes to summarize the designed real property assets that apply to this contract.

The Contractor must meet with the Contracting Officer and the Real Property Accounting Officer during the Pre Construction Meeting and the Project Closeout Meetings to modify and include any necessary changes to the DD Form 1354. The Contractor must provide the Interim DD Form 1354 that uses the appropriate division of the RPUIDs/ Category Codes to represent the final constructed facility and include all associated cost. Coordinate the Contractor's Price and Payment structure with the structure of the RPUIDs/ Category Codes.

SECTION 01 20 00.00 20 Page 1

Divide detailed asset breakdown into the RPUIDs and related construction Category Codes and populate associated costs which represent all aspects of the work. Where assets diverge into multiple RPUID/ Category Codes, divide the asset and provide the proportion of the assets in each RPUID/ Category Code. Assets and related RPUID/ Category Codes may be modified by the Contracting Officer as necessary during course of the work. Coordinate identification and proportion of these assets with the Government Real Property Accounting Officer.

Cost data accumulated under this section are required in the preparation of DD Form 1354.

1.2.4 Schedule Requirements for HVAC TAB

The field work Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC shall be broken down in the Earned Value Report from the cost-loaded NAS by separate line items which reflect measurable deliverables. Specific payment percentages for each line item shall be determined on a case by case basis for each contract. The line items shall be as follows:

a. Approval of Design Review Report: The TABS Agency is required to conduct a review of the project plans and specifications to identify any feature, or the lack thereof, that would preclude successful testing and balancing of the project HVAC systems. The resulting findings shall be submitted to the Government to allow correction of the design. The progress payment shall be issued after review and approval of the report.

b. Approval of the pre-field engineering report: The TABS Agency submits a report which outlines the scope of field work. The report shall contain details of what systems will be tested, procedures to be used, sample report forms for reporting test results and a quality control checklist of work items that must be completed before TABS field work commences.

c. Initial field work: Incremental payments are issued as the TABS field work progresses. The TABS Agency mobilizes to the project site and executes the field work as outlined in the pre-field engineering report. The HVAC water and air systems are balanced and operational data shall be collected for one seasonal condition (either summer or winter depending on project timing).

d. Approval of Initial report: On completion of the Initial field work, the data is compiled into a report and submitted to the Government.

The report is reviewed, and approved, after ensuring compliance with the pre-field engineering report scope of work.

e. Completion of Initial field QA check: Contract QC and Government representatives meet the TABS Agency at the jobsite to retest portions of the systems reported in the Initial report. The purpose of these tests are to validate the accuracy and completeness of the previously submitted Initial report.

f. Approval of Final report: The TABS Agency completes all Final field work, which is normally comprised mainly of taking heat transfer temperature readings, in the season opposite of that under which Initial performance data was compiled. This data shall be compiled into a report and submitted to the Government. On completion of submittal

SECTION 01 20 00.00 20 Page 2 review to ensure compliance with the pre-field engineering report scope, progress payment is issued. Progress payment is less than that issued for the Initial report since most of the water and air balancing work effort is completed under Initial.

1.3 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, equipment use rates shall be based upon the applicable provisions of the Guam Cost Guidebooks, Equipment Watch Blue Book or acceptable guidance specific to Guam to establish a set cost for equipment and equipment operations cost.

1.4 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.4.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 shall include certification by Contractor and Quality Control (QC) Manager.

b. The Earned Value Report from the cost-loaded NAS, showing in detail:

the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract.

c. Updated Project Schedule and reports required by the contract.

d. Contractor Safety Self Evaluation Checklist.

e. Other supporting documents as requested.

f. Updated copy of submittal register.

g. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies.

h. Monthly Work-hour report.

i. Solid Waste Disposal Report.

j Certified payrolls.

k. Updated testing logs.

l. Updated housing list.

1.4.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the contract, provide the documents listed in paragraph CONTENT

SECTION 01 20 00.00 20 Page 3

OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

1.4.3 Final Invoice

a. A final invoice shall be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release shall contain the corporate seal. An officer of the corporation shall sign and the corporate secretary shall certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor shall then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not…