Consensus Score Sheet 55AGR-S1521 - by location.pdf
PDF 260 KB Posted
- Attached to
- HVAC Preventative Maintenance
- Solicitation number
- 55AGR-S1521
- Issued by
- Washoe County, Virginia City CDP, Nevada
About this file
This document is a Consensus Score Sheet for Solicitation Number 55AGR-S1521, an HVAC Preventative Maintenance and Repair contract opportunity issued by the State of Nevada, involving the jurisdictions of Clark County, Elko County, Washoe County, Las Vegas City, and Sparks City. The solicitation is for HVAC preventative maintenance and repair services, with line items for annual sparks, hourly rate repairs, after-hours hourly rate, and parts markup, across a 5-year term from State Fiscal Year 2022 through 2025. The solicitation opened on 4/26/2021, and the document evaluates and scores three vendors - Mesa Energy Systems dba EMCOR Services Nevada, Nevada Chiller and Boiler, Inc., and RHP Mechanical Systems - based on technical, cost, and Nevada preference criteria.
The lowest cost proposal is $108,642.00 from RHP Mechanical Systems, which receives the maximum cost score of 250 points. The technical scores range from 348.75 to 480.00 points. The document includes detailed pricing and cost evaluation breakdowns for the Reno, Vegas, and Elko locations. Preference points are awarded based on Nevada-based businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment E Reference Questionnaire~1.doc | DOC document | |
| 55AGR-S1521 HVAC Preventative Maintenance and Repair Modified Timeline~1.docx | DOCX document | |
| Quote Instructions.pdf | ||
| Attachment D Insurance Schedule~2.docx | DOCX document | |
| Letter Of Intent~1.pdf | ||
| Attachment H Equipment List and Location.xlsx | XLSX spreadsheet | |
| Attachment F Proposed Staff Resume~1.doc | DOC document | |
| Attachment G Cost Schedule.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number:
Solicitation Title:
Opening Date:
EVALUATION FACTORS:
Lowest Cost (LC): 108,642.00$
Cost Evaluation Weight: 25
Line Item Quantity Type Unit Price 01 Ext. Price 01 Unit Price 02 Ext. Price 02 Unit Price 03 Ext. Price 03
1 SFY22 Sparks 1 37,853.00$ 37,853.00$ 36,320.00$ 36,320.00$ 18,900.00$ 18,900.00$
2 SFY22 Hourly Rate Repairs @ 90 hours 44 121.00$ 5,324.00$ 130.00$ 5,720.00$ 95.00$ 4,180.00$
3 SFY22 After Hours Hourly Rate @ 15 hours 7 181.00$ 1,267.00$ 195.00$ 1,365.00$ 140.00$ 980.00$
4 SFY22 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
5 SFY23 Sparks 1 37,853.00$ 37,853.00$ 37,773.00$ 37,773.00$ 18,900.00$ 18,900.00$
6 SFY23 Hourly Rate Repairs @ 90 Hours 44 121.00$ 5,324.00$ 135.00$ 5,940.00$ 95.00$ 4,180.00$
7 SFY23 After Hours Hourly Rate @ 15 hours 7 181.00$ 1,267.00$ 202.50$ 1,417.50$ 140.00$ 980.00$
8 SFY23 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
9 SFY24 Sparks 1 38,989.00$ 38,989.00$ 39,284.00$ 39,284.00$ 19,840.00$ 19,840.00$
10 SFY24 Hourly Rate Repairs @ 90 Hours 44 125.00$ 5,500.00$ 140.00$ 6,160.00$ 125.00$ 5,500.00$
11 SFY24 After Hours Hourly Rate @ 15 hours 7 186.00$ 1,302.00$ 210.00$ 1,470.00$ 150.00$ 1,050.00$
12 SFY24 Parts Markup 1,250 20% 250.00$ 20% 1,500.00$ 35% 1,687.50$
13 SFY25 Sparks 1 40,159.00$ 40,159.00$ 40,855.00$ 40,855.00$ 20,832.00$ 20,832.00$
14 SFY25 Hourly Rate Repairs @ 90 Hours 44 125.00$ 5,500.00$ 145.00$ 6,380.00$ 125.00$ 5,500.00$
15 SFY25 After Hours Hourly Rate @ 15 hours 7 186.00$ 1,302.00$ 217.50$ 1,522.50$ 150.00$ 1,050.00$
16 SFY25 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
17 -$ -$ -$
Total Cost (TC) 186,390.00$ 190,207.00$ 108,642.00$
Price Factor (LC/TC = PF): LC/TC = PF 0.58 0.57 1.00
1-10 Cost Score: PF * 10 6 6 10
Weighted Cost Score (WCS): CS x CW = WCS 146 143 250
Enter data into yellow cells.
Vendor 01
Mesa Energy Systems dba EMCOR Services Nevada
Vendor 03
RHP Mechanical Systems
Vendor 02
Nevada Chiller and Boiler, Inc.
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Reno Cost Evaluation
Reno Cost Evaluation Page 1 of 8
Opening Date:
EVALUATION FACTORS:
Lowest Cost (LC): 46,532.00$
Cost Evaluation Weight: 25
Line Item Quantity Type Unit Price 01 Ext. Price 01 Unit Price 02 Ext. Price 02 Unit Price 03 Ext. Price 03
1 SFY22 Las Vegas 1 7,000.00$ 7,000.00$ 17,310.00$ 17,310.00$ -$
2 SFY22 Hourly Rate Repairs @ 90 hours 23 121.00$ 2,783.00$ 130.00$ 2,990.00$ -$
3 SFY22 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 195.00$ 780.00$ -$
4 SFY22 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
5 SFY23 Las Vegas 1 7,210.00$ 7,210.00$ 18,002.00$ 18,002.00$ -$
6 SFY23 Hourly Rate Repairs @ 90 Hours 23 121.00$ 2,783.00$ 135.00$ 3,105.00$ -$
7 SFY23 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 202.50$ 810.00$ -$
8 SFY23 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
9 SFY24 Las Vegas 1 7,420.00$ 7,420.00$ 18,722.00$ 18,722.00$ -$
10 SFY24 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 140.00$ 3,220.00$ -$
11 SFY24 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 210.00$ 840.00$ -$
12 SFY24 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
13 SFY25 Las Vegas 1 7,650.00$ 7,650.00$ 19,472.00$ 19,472.00$ -$
14 SFY25 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 145.00$ 3,335.00$ -$
15 SFY25 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 217.50$ 870.00$ -$
16 SFY25 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
17 -$ -$ -$
Total Cost (TC) 46,532.00$ 92,456.00$ -$
Price Factor (LC/TC = PF): LC/TC = PF 1.00 0.50 0.00
1-10 Cost Score: PF * 10 10 5 0
Weighted Cost Score (WCS): CS x CW = WCS 250 126 0
Enter data into yellow cells.
Mesa Energy Systems dba EMCOR Services NevadaNevada Chiller and Boiler, Inc. RHP Mechanical Systems
Vegas Cost Evaluation
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Vendor 01 Vendor 02 Vendor 03
Vegas Cost Evaluation Page 2 of 8
Opening Date:
EVALUATION FACTORS:
Lowest Cost (LC): 49,105.00$
Cost Evaluation Weight: 25
Line Item Quantity Type Unit Price 01 Ext. Price 01 Unit Price 02 Ext. Price 02 Unit Price 03 Ext. Price 03
1 SFY22 Elko 1 7,786.00$ 7,786.00$ 14,220.00$ 14,220.00$ -$
2 SFY22 Hourly Rate Repairs @ 90 hours 23 121.00$ 2,783.00$ 130.00$ 2,990.00$ -$
3 SFY22 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 195.00$ 780.00$ -$
4 SFY22 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
5 SFY23 Elko 1 7,786.00$ 7,786.00$ 14,789.00$ 14,789.00$ -$
6 SFY23 Hourly Rate Repairs @ 90 Hours 23 121.00$ 2,783.00$ 135.00$ 3,105.00$ -$
7 SFY23 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 202.50$ 810.00$ -$
8 SFY23 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
9 SFY24 Elko 1 8,020.00$ 8,020.00$ 15,380.00$ 15,380.00$ -$
10 SFY24 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 140.00$ 3,220.00$ -$
11 SFY24 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 210.00$ 840.00$ -$
12 SFY24 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
13 SFY25 Elko 1 8,261.00$ 8,261.00$ 15,995.00$ 15,995.00$ -$
14 SFY25 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 145.00$ 3,335.00$ -$
15 SFY25 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 217.50$ 870.00$ -$
16 SFY25 Parts Markup 625 20% 750.00$ 20% 750.00$ -$
17 -$ -$ -$
Total Cost (TC) 49,105.00$ 79,334.00$ -$
Price Factor (LC/TC = PF): LC/TC = PF 1.00 0.62 0.00
1-10 Cost Score: PF * 10 10 6 0
Weighted Cost Score (WCS): CS x CW = WCS 250 155 0
Enter data into yellow cells.
Mesa Energy Systems dba EMCOR Services NevadaNevada Chiller and Boiler, Inc. RHP Mechanical Systems
Elko Cost Evaluation
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Elko Cost Evaluation Page 3 of 8
Opening Date:
EVALUATION FACTORS:
Lowest Cost (LC): 108,642.00$
Cost Evaluation Weight: 25
Line Item Quantity Type Unit Price 01 Ext. Price 01 Unit Price 02 Ext. Price 02 Unit Price 03 Ext. Price 03
1 SFY22 Sparks 1 37,853.00$ 37,853.00$ 36,320.00$ 36,320.00$ 18,900.00$ 18,900.00$
2 SFY22 Hourly Rate Repairs @ 90 hours 44 121.00$ 5,324.00$ 130.00$ 5,720.00$ 95.00$ 4,180.00$
3 SFY22 After Hours Hourly Rate @ 15 hours 7 181.00$ 1,267.00$ 195.00$ 1,365.00$ 140.00$ 980.00$
4 SFY22 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
5 SFY23 Sparks 1 37,853.00$ 37,853.00$ 37,773.00$ 37,773.00$ 18,900.00$ 18,900.00$
6 SFY23 Hourly Rate Repairs @ 90 Hours 44 121.00$ 5,324.00$ 135.00$ 5,940.00$ 95.00$ 4,180.00$
7 SFY23 After Hours Hourly Rate @ 15 hours 7 181.00$ 1,267.00$ 202.50$ 1,417.50$ 140.00$ 980.00$
8 SFY23 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
9 SFY24 Sparks 1 38,989.00$ 38,989.00$ 39,284.00$ 39,284.00$ 19,840.00$ 19,840.00$
10 SFY24 Hourly Rate Repairs @ 90 Hours 44 125.00$ 5,500.00$ 140.00$ 6,160.00$ 125.00$ 5,500.00$
11 SFY24 After Hours Hourly Rate @ 15 hours 7 186.00$ 1,302.00$ 210.00$ 1,470.00$ 150.00$ 1,050.00$
12 SFY24 Parts Markup 1,250 20% 250.00$ 20% 1,500.00$ 35% 1,687.50$
13 SFY25 Sparks 1 40,159.00$ 40,159.00$ 40,855.00$ 40,855.00$ 20,832.00$ 20,832.00$
14 SFY25 Hourly Rate Repairs @ 90 Hours 44 125.00$ 5,500.00$ 145.00$ 6,380.00$ 125.00$ 5,500.00$
15 SFY25 After Hours Hourly Rate @ 15 hours 7 186.00$ 1,302.00$ 217.50$ 1,522.50$ 150.00$ 1,050.00$
16 SFY25 Parts Markup 1,250 20% 1,500.00$ 20% 1,500.00$ 35% 1,687.50$
17 SFY22 Las Vegas 1 7,000.00$ 7,000.00$ 17,310.00$ 17,310.00$
18 SFY22 Hourly Rate Repairs @ 90 hours 23 121.00$ 2,783.00$ 130.00$ 2,990.00$
19 SFY22 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 195.00$ 780.00$
20 SFY22 Parts Markup 625 20% 750.00$ 20% 750.00$
21 SFY23 Las Vegas 1 7,210.00$ 7,210.00$ 18,002.00$ 18,002.00$
22 SFY23 Hourly Rate Repairs @ 90 Hours 23 121.00$ 2,783.00$ 135.00$ 3,105.00$
23 SFY23 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 202.50$ 810.00$
24 SFY23 Parts Markup 625 20% 750.00$ 20% 750.00$
25 SFY24 Las Vegas 1 7,420.00$ 7,420.00$ 18,722.00$ 18,722.00$
26 SFY24 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 140.00$ 3,220.00$
27 SFY24 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 210.00$ 840.00$
Mesa Energy Systems dba EMCOR Services NevadaNevada Chiller and Boiler, Inc. RHP Mechanical Systems
Total Cost Evaluation
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Total Cost Evaluation Page 4 of 8
28 SFY24 Parts Markup 625 20% 125.00$ 20% 750.00$
29 SFY25 Las Vegas 1 7,650.00$ 7,650.00$ 19,472.00$ 19,472.00$
30 SFY25 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 145.00$ 3,335.00$
31 SFY25 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 217.50$ 870.00$
32 SFY25 Parts Markup 625 20% 750.00$ 20% 750.00$
33 SFY22 Elko 1 7,786.00$ 7,786.00$ 14,220.00$ 14,220.00$
34 SFY22 Hourly Rate Repairs @ 90 hours 23 121.00$ 2,783.00$ 130.00$ 2,990.00$
35 SFY22 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 195.00$ 780.00$
36 SFY22 Parts Markup 625 20% 750.00$ 20% 750.00$
37 SFY23 Elko 1 7,786.00$ 7,786.00$ 14,789.00$ 14,789.00$
38 SFY23 Hourly Rate Repairs @ 90 Hours 23 121.00$ 2,783.00$ 135.00$ 3,105.00$
39 SFY23 After Hours Hourly Rate @ 15 hours 4 181.00$ 724.00$ 202.50$ 810.00$
40 SFY23 Parts Markup 625 20% 750.00$ 20% 750.00$
37 SFY24 Elko 1 8,020.00$ 8,020.00$ 15,380.00$ 15,380.00$
38 SFY24 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 140.00$ 3,220.00$
39 SFY24 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 210.00$ 840.00$
40 SFY24 Parts Markup 625 20% 125.00$ 20% 750.00$
41 SFY25 Elko 1 8,261.00$ 8,261.00$ 15,995.00$ 15,995.00$
42 SFY25 Hourly Rate Repairs @ 90 Hours 23 125.00$ 2,875.00$ 145.00$ 3,335.00$
43 SFY25 After Hours Hourly Rate @ 15 hours 4 186.00$ 744.00$ 217.50$ 870.00$
44 SFY25 Parts Markup 625 20% 750.00$ 20% 750.00$
Total Cost (TC) 280,777.00$ 361,997.00$ 108,642.00$
Price Factor (LC/TC = PF): LC/TC = PF 0.39 0.30 1.00
1-10 Cost Score: PF * 10 4 3 10
Weighted Cost Score (WCS): CS x CW = WCS 97 75 250
Enter data into yellow cells.
Total Cost Evaluation Page 5 of 8
Opening Date:
Available Points: 1000
Vendor # Vendor Name Technical Reno
Cost
Alternate
Cost
Nevada
Pref.
Subtotal Rank
Vendor 01 Mesa Energy Systems dba EMCOR Services Nevada480.00 145.72 0.00 0.00 625.72 2
Vendor 03 RHP Mechanical Systems 386.25 250.00 0.00 31.81 668.06 1
Vendor 02 Nevada Chiller and Boiler, Inc. 348.75 142.79 0.00 24.58 516.12 3
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Reno Technical & Cost Summary
Reno Technical & Cost Summary Page 6 of 8
Opening Date:
Available Points: 1000
Vendor # Vendor Name Technical Vegas
Cost
Alternate
Cost
Nevada
Pref.
Subtotal Rank
Vendor 01 Mesa Energy Systems dba EMCOR Services Nevada480.00 250.00 0.00 0.00 730.00 1
Vendor 03 RHP Mechanical Systems 386.25 0.00 0.00 19.31 405.56 3
Vendor 02 Nevada Chiller and Boiler, Inc. 348.75 125.82 0.00 23.73 498.30 2
Vegas Technical & Cost Summary
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Vegas Technical & Cost Summary Page 7 of 8
Opening Date:
Available Points: 1000
Vendor # Vendor Name Technical Elko Cost Alternate
Cost
Nevada
Pref.
Subtotal Rank
Vendor 01 Mesa Energy Systems dba EMCOR Services Nevada480.00 250.00 0.00 0.00 730.00 1
Vendor 03 RHP Mechanical Systems 386.25 0.00 0.00 19.31 405.56 3
Vendor 02 Nevada Chiller and Boiler, Inc. 348.75 154.74 0.00 25.17 528.67 2
Elko Technical & Cost Summary
55AGR-S1521
HVAC Preventative Maintenance and Repair
4/26/2021
Elko Technical & Cost Summary Page 8 of 8
File details come from the government source that posted it. Updated .