Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station (CC3) Above Ground Storage Tanks
Solicitation number
26-150
Issued by
Tarrant County, Texas

About this file

Summary: Request for Proposal #26-150

This is a Request for Proposal (RFP) issued by the Tarrant Regional Water District (TRWD), a publicly elected five-member board that serves Tarrant County, Texas. TRWD seeks professional services for comprehensive nondestructive condition assessment of two critical infrastructure projects: approximately 12 miles of 72-inch diameter pre-stressed concrete cylinder pipe (PCCP) in Cedar Creek Pipeline Section 4 located in Ellis and Navarro Counties east of Ennis, and comprehensive electromagnetic or ultrasonic testing of steel flooring in two 107-foot diameter above-ground storage tanks at the Cedar Creek Booster Pump Station (CC3) in Waxahachie, Texas. The PCCP inspection must assess around 5 miles per day for continuous runs and identify wire breaks using near-field or remote-field electromagnetic testing on dewatered pipe. The tank floor inspection must identify corrosion, pitting, and other defects in ferromagnetic materials. A non-mandatory pre-proposal meeting is scheduled for July 30, 2026, at 10:00 am. The question submission deadline is August 7, 2026, at 5:00 pm, and proposals are due electronically by August 17, 2026, at 2:00 pm through the procurement portal at https://procurement.opengov.com/portal/trwd. Contractor selection is anticipated for September 15, 2026. Field work for tank inspections is expected in fall 2026, while pipeline assessment is expected to begin during scheduled pipeline isolation and dewatering in early 2027. Work hours are 7:00 a.m. to 7:00 p.m. daily, with internal pipeline activities required to be completed by 5:00 p.m.

Proposals will be evaluated on a weighted basis: Cost Proposal and Fee Schedule (40%), Experience and Qualifications of Team (30%), Proposed Method to Accomplish Work (25%), and Unique Offerings (5%). Pricing shall be submitted on a per-task basis with itemized estimates indicating hourly rates by employee classification and name, per-mile travel costs not exceeding IRS allowances, and other associated costs, with no sub-markup allowed. Additional requested services will be provided on a time-and-material basis per contracted labor rates. Prospective consultants may recommend improvements to the scope and should clearly detail which project areas they are proposing to address. Proposals must include experience documentation with a minimum of one but no more than three successfully completed similar projects, with contractor names, project manager contact information, work type, project size in linear feet/mileage inspected, and contract value. The RFP does not fall under the federal Davis Bacon Act but requires compliance with Texas Government Code 2258.022 and state comptroller rulings. All proposals must remain subject to acceptance for ninety calendar days after opening. Firms must coordinate with TRWD's GIS staff and allow a 30-day review, comment, and rejection period for all inspection data submissions. Written task orders will be issued at least two months before field work, and TRWD will pay mobilization fees if work is canceled after mobilization begins.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASING DEPARTMENT

800 East Northside Drive Fort Worth, Texas 76102

CONDITION ASSESSMENT OF THE CEDAR CREEK PCCP PIPELINE

SECTION 4 AND THE CEDAR CREEK BOOSTER PUMP STATION

(CC3) ABOVE GROUND STORAGE TANKS

REQUEST FOR PROPOSAL

26-150

SUBMITTALS DUE NO LATER THAN: MONDAY, AUGUST 17, 2026

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/trwd

TABLE OF CONTENTS

1. Introduction

2. Instructions to Offerors

3. Scope of Work

4. Evaluation Criteria

5. Vendor Submittal

Attachments:

A - CC Section 4 Plans and Profiles

B - CC Section 4 Lay Sheets

C - Waxahachie Pump Station Above Ground Storage Tank Drawings

Request For Proposal #26-150 3 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

1. 1. .......................................................................... INTRODUCTION

1.1. 1.1. .......................................................................................... SUMMARY

Tarrant Regional Water District is seeking proposals for Condition Assessment of the Cedar

Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station (CC3) Above Ground

Storage Tanks. Proposals are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/trwd

Proposals are due no later than 2:00 pm on Monday, August 17, 2026.

1.2. 1.2. ..................................................................................... BACKGROUND

The Tarrant Regional Water District (TRWD) has provided quality water to its customers, implemented vital flood control measures and created recreational opportunities for Tarrant

County residents and communities for more than one hundred (100) years.

TRWD is led by a publicly elected five (5) member board and owns and operates four (4) major reservoirs including Lake Bridgeport, Eagle Mountain Lake, Cedar Creek Reservoir and Richland

Chambers Reservoir. TRWD has constructed over two hundred and fifty (250) miles of water pipelines, multiple pump stations and a two-thousand-acre wetland water reuse project augmenting water supplies for the area. TRWD also maintains twenty-seven (27) miles of floodway levees and more than one hundred (100) miles of Trinity River Trails.

TRWD’s transmission pipelines, ranging in diameters of 72 inch through 108 inch, convey water from its water supply sources Richland-Chambers Reservoir, Cedar Creek Reservoir and Lake

Benbrook, through several lake and booster pump stations including balancing reservoirs along the way. The raw water is delivered directly to customer water treatment plants supplied by

TRWD’s pipelines, as well as to terminal storage reservoirs (Eagle Mountain, Lake Benbrook, and Lake Arlington) through pressure reducing outlets.

1.3. 1.3. ....................................................................... CONTACT INFORMATION

Claire Killough

Purchasing Supervisor

Email: claire.killough@trwd.com

Phone: (817) 991-8992

Department:

Infrastructure Engineering

1.4. 1.4. ............................................................................................ TIMELINE

Release Project Date July 20, 2026 https://procurement.opengov.com/portal/trwd mailto:claire.killough@trwd.com tel:(817)991-8992

Request For Proposal #26-150 4 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

Pre-Proposal Meeting (Non-Mandatory) July 30, 2026, 10:00am https://teams.microsoft.com/meet/24503283

5441757?p=praDYxYu9NcC7YOQo9

Question Submission Deadline August 7, 2026, 5:00pm

Proposal Submission Deadline August 17, 2026, 2:00pm

Contractor Selection Date September 15, 2026

2. 2. .......................................................... INSTRUCTIONS TO OFFERORS

2.1. 2.1. ........................................................... OFFICIAL PROPOSAL DOCUMENTS

Official Documents are available through the procurement portal at the following website:

https://procurement.opengov.com/portal/trwd

Prospective offerors must register with the Procurement Website as a plan holder, even if bidding documents are obtained from a plan room or other site. All official notifications, addenda and other documents will be offered only through the Procurement Website

Proposal forms obtained from any source other than the District may be incomplete and bidders risk not receiving necessary addenda, or other required documents causing the bid to be considered non-responsive, and eliminating the proposal from award. The District will not be responsible for the completeness, accuracy, or timeliness of the final bid documents obtained from other sources.

2.2. 2.2. ......................................INTERPRETATION OF THE PROPOSAL DOCUMENTS

A. Questions are to be submitted using the Question and Answer process through the

Procurement Portal at https://procurement.opengov.com/portal/trwd. Response to questions posted on the Procurement Portal will be posted in the portal by the District for the benefit of all bidders. Questions are to be submitted by 5:00 pm on Friday, August 7, 2026.

B. Review the following guidelines for asking questions on the Procurement Website before posting questions:

https://teams.microsoft.com/meet/245032835441757?p=praDYxYu9NcC7YOQo9 https://teams.microsoft.com/meet/245032835441757?p=praDYxYu9NcC7YOQo9

Request For Proposal #26-150 5 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

1. Read the previously posted questions before posting a similar question to avoid duplication

2. Post only one question per entry. Multiple part questions cannot be answered until all responses have been prepared. A response to multiple part questions will be to request bidder to resubmit questions individually

3. Provide adequate information to allow a response to be made. i.e. reference specific sections, provide a brief background to set the stage for your question, etc.

4. Do not use this as a forum to request approval of an alternate product. Follow the provision of the bidding documents for this process

5. Ask questions early. The deadline for questions will not be extended unless the date for receipt of bids is extended. No response will be made to questions asked after the deadline

6. Responses to questions are not part of the Contract Documents and cannot modify the Contract Documents. An addendum must be issued to clarify, correct or change the Contract Documents, addenda or the related supplemental data

2.3. 2.3. ....................................................................... PRE-PROPOSAL MEETING

A non-mandatory pre-proposal meeting will convene promptly at 10:00 am on Thursday, July 30, 2026 at https://teams.microsoft.com/meet/245032835441757?p=praDYxYu9NcC7YOQo9.

Interested Offerors are encouraged to attend and participate in this meeting.

2.4. 2.4. ......................................................... RESTRICTION OF COMMUNICATION

All communications relating to this proposal are required to go through the process addressed in

Section 2.3 – Interpretation of the Proposal Documents. Any and all other communications between an Offeror and District staff concerning any part of this proposal are strictly prohibited.

Failure to comply with this requirement may result in the District disqualifying the Offeror’s submittal.

2.5. 2.5. .................................................................................. NON-COLLUSION

By submitting a proposal, Offeror certifies that it has not been a party to any collusion among

Offerors in the restraint of freedom of competition by agreement to submit a proposal at a fixed price or to refrain from offering a proposal. Offeror certifies that it has not been a party to any collusion among any officials or employees of the District as to quantity, quality, or price in the prospective contract, or any other terms of the prospective contract.

Request For Proposal #26-150 6 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

2.6. 2.6. ................................................................................... CODE OF ETHICS

A. It is the policy of the District that the following ethical principles govern the conduct of

District employees assigned to the Purchasing Department who are involved directly or indirectly, in the District’s procurement process:

1. Employees shall avoid activities that compromise or give the perception of compromising the best interests of the District.

2. Employees shall not knowingly use confidential proprietary information for actual or anticipated gain. Employees shall keep the proprietary information of Offerors confidential.

3. Employees shall avoid any activity that creates a conflict between their personal interest and the interest of the District.

4. Employees shall avoid the appearance of unethical or compromising practices in relationships, actions, and communications associated with District procurement.

5. Employees shall not solicit or accept money, loans, gifts, favors, or anything of value, from present or potential vendors that might influence or give the perception of influencing a purchasing decision.

B. Conflict exists in any relationship where the District’s best interest may differ from the employee’s best interest or the best interest of someone associated with the employee.

If conflict of interest exists, the employee shall notify the Purchasing Manager in writing and remove him/herself from the District’s procurement process.

2.7. 2.7. ........................................................................................... ADDENDA

A. Any changes made will be made in the form of written addenda and posted to the

Procurement Website. It is the Offeror’s responsibility to obtain and review any addenda. Offeror must provide a signature as indicated in the proposal form to show acknowledgement of receipt of addenda.

B. Oral answers will not be authoritative and the District will not entertain any protest based on verbal instruction.

2.8. 2.8. ....................................... PROPOSAL TO REMAIN SUBJECT TO ACCEPTANCE

All proposals will remain subject to acceptance for ninety (90) calendar days after the proposal opening, but the District may, at its sole discretion, release any proposal and return the proposal security prior to the end of this period.

Request For Proposal #26-150 7 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

2.9. 2.9. .......................................................................... LIQUIDATED DAMAGES

This section does not apply to this project.

2.10. 2.10. .............................................. EXAMINATION OF CONTRACT DOCUMENTS

a. Use a complete set of the Contract Documents in preparing proposals. Offeror assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents.

b. Before submitting a proposal:

I. Examine and carefully study the Contract Documents, including any addenda and related supplemental data.

II. Become familiar with laws and regulations that may affect cost, progress or the completion of this project.

III. Examine and be thoroughly familiar with job/site conditions.

IV. Promptly notify the District of all conflicts, errors, ambiguities, or discrepancies that the Offeror discovers in the Contract Documents, addenda and the related supplemental data.

V. Determine that the Contract Documents, addenda and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of the project.

2.11. 2.11. ...................................................................... BRAND NAME OR EQUAL

The material furnished under this Request for Proposal specifications shall be quality workmanship and material. The Offeror represents that all material offered under these specifications shall be new. Used, shopworn, demonstrator, prototype or discontinued models are not accepted. Any reference to model and/or make/manufacturer used in the proposal specifications is descriptive, not restrictive and is indicative of the type and quality the District desires to purchase. Materials found defective or not meeting specifications shall be picked up and replaced by the successful Offeror at no expense to the District.

2.12. 2.12. ...................................................................................... WAGE RATES

This project does not fall under the federal Davis Bacon Act. However, Bidder must comply with all statutes, including but not limited to Texas Government Code 2258.022, and rulings of the

State of Texas Comptroller.

Request For Proposal #26-150 8 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

2.13. 2.13. .................................................................... PUBLIC INFORMATION ACT

Information, documentation, and other material in connection with this solicitation or any resulting contract may be subject to public disclosure pursuant to Chapter 552 of the Texas

Government Code (The "Public Information Act").

2.14. 2.14. ................................................................ PROPRIETARY INFORMATION

If a bidder does not desire proprietary information in the bid to be disclosed, each page must be identified and marked proprietary at time of submittal. The District will, to the extent allowed by law, protect such information from disclosure. The final decision as to what information must be disclosed, however, lies with the Texas Attorney General. Failure to identify proprietary information will result in all unmarked sections being deemed non-proprietary and available upon public request.

2.15. 2.15. ................................................... PROPOSAL SUBMITTAL REQUIREMENTS

A. Offerors are required to submit one (1) original proposal in PDF format.

B. To minimize the work of the firms initially submitting an RFP and the review time required by the Selection Committee, the following instructions should be followed in preparing the RFP:

o Responses for the sections described below shall be no more than 10 pages if submitting on one project, and no more than 15 pages if submitting on both projects excluding cover page, table of contents, section dividers and forms. Limit the contents of the submittal to that described for each section. Be succinct.

o Attachments such as plans, photographs or other relevant reference information felt necessary for inclusion are allowed but may not exceed 5 pages in addition to the above defined maximum page limits.

o If included, a cover letter will be included in the page count.

A. All proposals shall be bound and organized in the following manner:

1. Cover Letter – Include a cover letter signed by a duly constituted official legally authorized to bind the applicant to both its proposal and cost schedule

2. Experience and Qualifications of Key Team Members -

▪ Technical quality of prior projects by key team members

Request For Proposal #26-150 9 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

▪ Demonstrated ability by team to meet scope and schedule

▪ Demonstrated success and challenges by team

▪ Performance on TRWD or other similar agency projects by key team members

▪ Describe Proposer’s experience in completing similar efforts. Highlight successes and challenges. List a minimum of one (1) but no more than three (3) successfully completed projects of similar nature with name of company and

Project Manager name and title, telephone numbers, email address(es), type of work performed, size of project (linear feet/mileage inspected), and value of each contract. Contracting projects currently being performed may be submitted for consideration. Failure to meet this experience requirement shall render Proposal non-responsive.

3. Proposed Method to Accomplish the Work -

▪ Discuss Proposer’s approach to the project and provide details in accordance with content required in proposal.

▪ Understanding of the project and Scope of Work. Intention to meet Scope of

Work requirements, acceptance of contract terms and conditions, Sample

Contract, including appropriateness of exceptions and alternatives, Consultant.

▪ Responsiveness to RFP, including approach and methodology proposed for respective area(s) of interest.

▪ Familiarity with large diameter pipeline systems.

▪ Familiarity with problems associated with the project and identification of risks.

▪ Discuss GIS support. Coordination with TRWD’s GIS staff prior to and after an inspection to ensure the team has the most current TRWD pipeline database in their analysis is required. Modification of the inspection area is expected unless specifically requested otherwise by TRWD. A 30-day review, comment, and rejection period for all inspection data for GIS submittals is expected.

4. Cost Proposal and Fee Schedule -

▪ Proposer’s services costs are to be provided on a per task basis such that before beginning work on any element of this project, an itemized estimate shall be provided to TRWD. Itemized task estimates must indicate hourly rates for

Request For Proposal #26-150 10 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks individuals identified by classification and name. List per mile travel costs (not to exceed IRS allowances) and any other costs associated with performing the service. No sub markup shall be allowed.

▪ Proposer shall indicate that any additional requested services shall be provided on a time and material basis per the contracted labor rate and fee schedule.

▪ Proposed fee relative to the services to be provided

▪ Demonstrated understanding of Cost Proposal Information

▪ See Proposal Exhibit A.1 to insert pricing information

5. Unique Offerings -

▪ Unique or proprietary methods, technology, or deliverables that set the

Consultant apart from others providing similar services.

▪ Discuss any other tools or technology that may be used for these projects.

6. Forms – Complete and submit the following provided forms

a. References Form

b. Supplier/Subcontractor Utilization Form

c. Non-Collusion Affidavit

d. Conflict of Interest Questionnaire

e. Compliance to State Law on Non-Resident Bidders

f. Compliance to Texas Sales Tax Code

g. Form 1295

B. Proposal shall be submitted through the Procurement Portal at https://procurement.opengov.com/portal/trwd

C. Proposal submitted electronically via the above website will be received by the due date and time. It is the sole responsibility of the Offeror to ensure the timely delivery of the proposal

Request For Proposal #26-150 11 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

2.16. 2.16. ............................................... MODIFICATION, WITHDRAWAL OR NO BID

A. The Offeror may modify or withdraw a proposal using a document executed in the same manner that a proposal must be executed, no later than the proposal due date and time.

B. The Offeror may withdraw its proposal through the procurement portal no later than the proposal due date and time.

C. If the Offeror chooses not to provide an offer on the project, the District would appreciate the Offeror submitting a “no bid” through the procurement portal.

2.17. 2.17. ............................................................................ PROPOSAL OPENING

Only the name of the submitting Offerors will be read aloud and monetary values will not be disclosed.

https://teams.microsoft.com/meet/243848696979834?p=zcjY5yjWR0vNmpTdTC

2.18. 2.18. ............................. EVALUATION OF PROPOSAL AND AWARD OF CONTRACT

A. All properly submitted proposals will be reviewed, evaluated and ranked by an evaluation committee established by the District.

B. Best and Final Offers - The evaluation committee will determine if Best and Final Offers are necessary but award of contract may be made without best and final offers. A request for a best and final offer is at the sole discretion of the District and will be extended in writing to each qualified Offeror.

C. The District shall award a contract to the Offeror whose proposal is considered to provide the best value to the District based on the following weighted criteria:Criteria Weighted ValueCost Proposal and Fee Schedule 40%Experience and

Qualifications of Team 30%Proposed Method to Accomplish Work 25%Unique Offerings 5%

D. The District reserves the right to reject the proposal of any Offeror which does not meet the above criteria and/or the other terms and conditions expressed herein to the

District’s satisfaction. The District also reserves the right to waive all formalities and technicalities to adopt the most advantageous construction of the contract documents or any applicable statute or code. Offeror may be disqualified and their proposal not considered, among other reasons, for any of the following specific reasons:

1. Reason for believing collusion exists between offeror and other offerors https://teams.microsoft.com/meet/243848696979834?p=zcjY5yjWR0vNmpTdTC

Request For Proposal #26-150 12 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

2. Reasonable grounds for believing that any offeror has a financial interest in more than one proposal for the work contemplated

3. The offeror being a party to or having a financial interest in any litigation against the

District

4. The offeror being in arrears on any existing contract or having defaulted on a previous contract

5. Lack of ability to perform the contract, if awarded to offeror, as reflected by offeror’s financial statement, experience and equipment, references prior work history, or answer to questionnaires

6. Uncompleted work, which in the sole judgment of the District, will prevent or hinder the prompt completion of additional work, if the contract is awarded to offeror.

E. The District may conduct investigations as it deems necessary to establish the responsibility, qualifications and financial ability of the Offeror, proposed subcontractors and other persons and organizations to do the work in accordance with the specifications to the District’s satisfaction.

F. Discrepancies between the multiplication of units of work in a proposal and unit price will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures in a proposal and the correct sum thereof will be resolved in favor of the correct sum. If units of work are not required on the proposal form and only a lump sum price is required the discrepancies between words and figures will be resolved in favor of the words.

G. Recommendation of award will be given to the Offeror that submits the highest evaluated proposal considered to offer the best value to the District.

H. Acceptance of a proposal will be in the form of a purchase order or a contract. The contents of this proposal shall become a part of this contract. The District will under no circumstances be responsible for goods or services provided without an acceptance signed by an authorized District representative.

2.19. 2.19. ......... POST PROPOSAL DOCUMENTS REQUIRED FROM SUCCESSFUL OFFEROR

The following is required from the successful Offeror (also referred to herein as Vendor) prior to commencement of services:

A. INSURANCE CERTIFICATES: In accordance with Terms and Conditions.

Request For Proposal #26-150 13 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

B. CONTRACT: Provided as a reference in the Vendor Submittal section.

3. 3. ......................................................................... SCOPE OF WORK

3.1. 3.1. ..................................................................................... BACKGROUND

Tarrant Regional Water District (TRWD) owns and operates approximately 268 miles of buried, large-diameter raw water transmission pipelines. The following descriptions detail the two project areas of interest for condition assessment.

Inspection Area 1:

The 79-mile Cedar Creek (CC) pre-stressed concrete cylinder pipeline, constructed in the 1970’s, runs from the Cedar Creek Reservoir in Navarro County to the Rolling Hills Booster Pump

Station in Fort Worth. Approximately 12 miles of the CC pipeline is to be inspected as part of this project located in Section 4 in Ellis and Navarro Counties, east of Ennis (Figure 1) from right of way station 2628+68 to 3200+77. This section of the pipeline consists of 72-inch diameter pre-stressed concrete cylinder pipe (PCCP) in a primarily rural setting.

Condition assessment activity for the CC Section 4 pipeline is expected to start during a scheduled pipeline isolation and dewatering taking place in early 2027.

Request For Proposal #26-150 14 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

Figure 1. Map of the 2027 inspection area in CC Section 4 with associated TRWD ROW stationing.

Request For Proposal #26-150 15 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

Figure 2. Map of the 2027 inspection area in CC Section 4 with original design stationing associated with record drawings, plan and profile sheets, and lay sheets.

Inspection Area 2:

A comprehensive corrosion and wall thickness inspection of the steel floors of the Cedar Creek

(CC) tanks at the CC3 Pump Station in Waxahachie, Texas is required. These tanks were constructed in the late 1970’s into the early 1980’s and have an inside diameter of 107 feet.

(Figure 3 and Figure 4)

Request For Proposal #26-150 16 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

Request For Proposal #26-150 17 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

Figure 3. Above ground storage tanks and associated piping at CC3 Pump Station in

Waxahachie, Texas.

Figure 4. Engineering drawing above ground storage tanks and associated piping at CC3 Pump

Station in Waxahachie, Texas. (See appendix C for additional details and plans)

Condition assessment activities for the above ground storage tanks are expected to take place in the fall of 2026.

Request For Proposal #26-150 18 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

Proposals are requested to address the capabilities of the technologies available to assess the overall condition of steel tank flooring including corrosion and wall loss. As such, firms are expected to propose the portions of work that are applicable to the technology/technologies that are being offered and are not necessarily expected to propose the entire scope of work.

Proposals must clearly detail which areas of interest from Section 3.2, Scope of Work below;

the Consultant is proposing to provide in response to this RFP.

3.2. 3.2. .................................................................................. SCOPE OF WORK

The Scope of Work in this section is not comprehensive. Rather, it represents what TRWD anticipates will be needed to assess these pipelines. Prospective consultants may recommend improvements to the scope in their proposed method to accomplish the work.

General Information:

• The scope of work consists of professional services to perform comprehensive nondestructive condition assessment of pre-stressed concrete cylinder pipe within

TRWD’s Cedar Creek Pipeline Section 4 and corrosion testing for the flooring of the tanks at the Waxahachie Pump Station. The work is segregated into two areas of interest. These are:

o Pre-stressed concrete cylinder pipe – Internal near field OR remote field electromagnetic testing for assessment of the condition of pre-stressed wires. Tools for dewatered assessment only.

o Steel tank flooring – Comprehensive testing methods that can detect corrosion, pitting, and/or other defects in ferromagnetic materials.

Consultant shall have access to top of pipe via all the blow-offs, air valves, and manways along the pipeline alignment. The expected minimum diameter of manways on the Cedar Creek pipeline in the inspection area is 18 inches with most access manways being 24 inches.

The entirety of the inspection area will be isolated and accessible for the consultant for the duration of the project. Written task orders will be agreed upon between the consultant and

TRWD and will detail the procurement of calibration pipework, the work schedule required for each assessment of pipe section, the extent of each section to be assessed, and the total fee applicable. No work shall be performed by the Consultant without receipt of a written task order. TRWD will endeavor to release written task orders at least two months ahead of field work.

• The scheduled work dates given in a task order may be revised or canceled for TRWD to meet its water demands. In the event of a canceled task order that is not rescheduled, Request For Proposal #26-150 19 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

TRWD will pay Consultant’s mobilization fees if work is not canceled prior to the start of the mobilization period listed in the task order. Work that is rescheduled for completion before the end of this contract term will be reimbursed at the same unit costs noted in the payment and fee schedule. If a shutdown to enable the Work to be performed cannot be rescheduled before the end of the contract term, TRWD at its discretion may extend the contract term or renegotiate the Work by a contract amendment or resolicit for the Work to be performed later.

• Field work shall be completed between the hours of 7:00 a.m. to 7:00 p.m. daily but shall be subject to change to meet TRWD’s needs. Pipeline access will typically be made available before 7:30 a.m. daily. Consultant is expected to complete activities inside the pipelines by 5:00 p.m. each day to permit demobilization of all field equipment by 7:00 p.m.

The extent of work included in each written task order will be dependent on pipeline availability, budget approvals, Consultant performance, and other factors affecting the release of task orders. task orders issued as part of this contract may not necessarily total the full extent of pipelines documented in this Scope of Work. Consultant may request an anticipated schedule of task order release(s) from the Contract Manager.

Pre-stressed concrete cylinder pipe (PCCP) – TRWD requires a comprehensive near field testing

(NFT) assessment or remote field testing (RFT) of the high tensile prestressing wires in each pipe segment to identify wirebreaks. The consultant must be able to assess around 5 miles of

PCCP per day for continuous runs of pipe.

• The inspection area includes:

o CC Section 4: Approximately 12 miles of 72-inch diameter PCCP

• Record drawings, plans and profiles, and lay sheets may not accurately reflect all aspects of the pipeline as it exists today.

• Existing access structures within the PCCP pipe sections may be used for condition assessment efforts.

Steel Tank Floor Inspection – TRWD requires a comprehensive electromagnetic or ultrasonic testing technology for steel floor assessment for the entirety of the tank floors to identify corrosion, pitting, and other defects in ferromagnetic materials.

• The inspection area includes:

Request For Proposal #26-150 20 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks o CC3 Above Ground Storage Tanks (2): Two 107-foot diameter steel above ground storage tanks

• Record drawings may not accurately reflect all aspects of the tank as it exists today.

4. 5. .................................................................. EVALUATION CRITERIA

No. Evaluation Criteria Scoring Method Weight (Points)

1. Cost Proposal and Fee Schedule Points Based 40 (40% of Total)

2. Experience and Qualifications of Team Points Based 30 (30% of Total)

3. Proposed Method to Accomplish Work Points Based 25 (25% of Total)

4. Unique Offerings Points Based 5 (5% of Total)

5. 6. .................................................................... VENDOR SUBMITTAL

5.1. 1.OFFEROR CONFIRMS REQUIRED INSURANCE SPECIFIED IN THE TERMS AND

CONDITIONS WILL BE PROVIDED IF AWARDED THE PROJECT.*

☐ Please confirm

*Response required

5.2. 2. ............................................................................................ PROPOSAL* Please include all items requested in Section 2.15 Proposal Submittal Requirements

*Response required

5.3. 3. ........................................................................... PROPOSAL EXHIBIT A.1* Please download the below documents, complete, and upload.

• Proposal_Exhibit_A.1_for_Pi...

*Response required

5.4. 4. ......................................... SUPPLIER/SUBCONTRACTOR UTILIZATION FORM* Please download the below documents, complete, and upload.

• Vendor_Utilization_Form.pdf

*Response required https://government-project.s3.us-west-2.amazonaws.com/284414/db6cef93-1a50-422e-80fb-a31582682102_Proposal_Exhibit_A.1_for_Pipe_CA_RFP_2027.xlsx https://government-project.s3.us-west-2.amazonaws.com/61581/dc8c7d90-11a9-4b9f-8313-57c99612d1bb_Vendor_Utilization_Form.pdf

Request For Proposal #26-150 21 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

5.5. 5. ................................................................................ REFERENCES FORM* Please download the below documents, complete, and upload.

• REFERENCES_FORM.docx

*Response required

5.6. 6. .....................................................................NON-COLLUSION AFFIDAVIT* Please download the below documents, complete, and upload.

• Non-Collusion_Affidavit.pdf

*Response required

5.7. 7. .................................................... CONFLICT OF INTEREST QUESTIONNAIRE* Complete the form, sign and date where indicate. We are required to have a completed copy of the CIQ form to be signed and dated even if there is(are) no conflict(s). Form is not considered complete unless signed and dated.

• Conflict_of_Interst_Questio...

*Response required

5.8. 8. .............................. COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS* Please download the below documents, complete, and upload.

• COMPLIANCE_TO_STATE_LAW_ON_...

*Response required

5.9. 9. .................................................... COMPLIANCE TO TEXAS SALES TAX CODE* Please download the below documents, complete, and upload.

• COMPLIANCE_TO_TEXAS_SALES_T...

*Response required

5.10. 10. ........... FORM 1295 – CERTIFICATE OF INTERESTED PARTIES (IF OVER $150,000) Complete form online at https://www.ethics.state.tx.us/filinginfo/1295/ using the following assigned identification number and description for this Project:

26-150

Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster

Pump Station (CC3) Above Ground Storage Tanks

Upload completed form to include certificate number and signature.

https://government-project.s3.us-west-2.amazonaws.com/61581/53945285-b4a4-4415-be19-e8510e701d50_REFERENCES_FORM.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LJT3EFMH%2F20260720%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260720T185041Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQC5Pga6Qto4Z4ZSQojaHm%2F4FsMa45fDiBJ6Nz6CNNAd4wIgDfbof4xggMIza49PJqX3qmIv%2B0qXPCvYUDOqx5l3mTMqlQUIrP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAinxHFq1lFEnI5yDyrpBHuUCfGWy7MO50EIYhIQKqmkJFpYJNYcHUkftJgPhiGT52HuKYeRykvy0dpYTE0lyiUpueSniSLuHKirJQIwXrpkFC4a%2F2IiEFXu2iaT2qWzwzOscb4HwVN%2Fc%2B%2BHsqpc8twKHw4No1QZSCo2Y4XPTgny8IgQ9wKOEbbwqbzOzPKqVl73kCo4PiTPoPGxwHkQqVn9eczNu7nR1bItSD9PvexDWvFk5%2B7mcqmtmIMel6avtOO1dYD0UPViro0MJUwvnIBoAK3VDJn4vd67FMDJ0ABBOfJ5DOqqCJuZmQYUBEOCrANLVyDkJLwt3iaTavr8nNvR0nvWTcfONZO9PqoqRi85dJx8WxNWAs89jr1p0yjIbkws6smk6RUdPARXK8p6GqGAFiWRkd2erOgK%2FZTMV9MVL3PSCqHL06cggHNApgPYvOFg6wqvt0Uv%2BnAmd%2FG05DT6Juasj3SqcVwliSzvb7fXYsBuGkEdEgELiLjR4hwjt8iO3Q2LYzM2etBGZmcq92YY1bzi7fqAwtpirByvQmy%2BBtlEQvYkO7aNLg3EkvpOyKXYS63x6oFX9nc99Ftgtx7Qbp8B5QMhSDCIbCMOiJaZ2JZfW33viyEq2HDrjFr9VKaZAxXBy3LMtlHlwGwY4VcdM3SKhANQ3g3AndKquMJAXlhFMTsx1pgskXiQ%2F10GxeTAjU7C1UJHOdiuns90dtmsbMrQ1t6J8cMZyFoJZurj5LhQiCegfYsVSUJDYhr1yy4PmGCLRMYOWPVANy%2FdEWY1NyZHubg7I7H5td84ZALNWNqGQ2tY1VZT8Gdlcs4FDrPt3dRs4UuUMMfV%2BdIGOpkB%2BFFa2F4sLi%2FDpOU%2FEvFoxp3gZoszHE0d2HAi9zBzIRn0RnFnE9s1%2BNHKZ%2FGHK9Xnun%2FyJP0TxmlTVEZIaWf5N%2FqosDL48K6L7Q9whDevzUSpj74j%2Bo0d8T3eRr9t4V46U3KObrU4MFY2WbrCUcvhjp3wZGPwQklV34qjly2dQFjweZu5QG8dusyll5TjMcGqlpEiYC6C%2BM0y&X-Amz-Signature=66c3c708a9e7e0d08945baff60c2e6dab0bdb6b3a4ede6535fbd43bcc99bb0ab&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22REFERENCES_FORM.docx%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/61581/4080c6d0-56f8-4140-8bdf-c5d37cb6c6ae_Non-Collusion_Affidavit.pdf https://government-project.s3.us-west-2.amazonaws.com/61581/4c891d40-eb93-4f1b-97dd-ddcfb2728e8f_Conflict_of_Interst_Questionnaire.pdf https://government-project.s3.us-west-2.amazonaws.com/61581/824f88e4-9930-43ae-aba3-27d38478982c_COMPLIANCE_TO_STATE_LAW_ON_NONRESIDENT_BIDDERS.pdf https://government-project.s3.us-west-2.amazonaws.com/61581/4236ff43-81f0-4b72-96f0-ee376eeeac1b_COMPLIANCE_TO_TEXAS_SALES_TAX_CODE.pdf https://www.ethics.state.tx.us/filinginfo/1295/

Request For Proposal #26-150 22 Title: Condition Assessment of the Cedar Creek PCCP Pipeline Section 4 and the Cedar Creek Booster Pump Station

(CC3) Above Ground Storage Tanks

***FYI – The “Affidavit” section has been replaced and is now the “Unsworn Declaration”. This

Section will require the date of birth and address of the authorized representative signing the form. The change in law applies to contracts entered into, renewed, or amended on or after

January 1, 2018.

5.11. 11. ................................................................. AGREEMENT - STANDARD PSA Provided as a reference only; this agreement will be used with the awarded vendor.

• TRWD_Standard_PSA_Non-Engin...

https://government-project.s3.us-west-2.amazonaws.com/284414/bd2bba35-dae9-41aa-bfe0-dc266140af15_TRWD_Standard_PSA_Non-Engineer_Final_v2_20240725.pdf

1. 1. Introduction
1.1. 1.1. Summary
1.2. 1.2. Background
1.3. 1.3. Contact Information
1.4. 1.4. Timeline
2. 2. Instructions to Offerors
2.1. 2.1. OFFICIAL PROPOSAL DOCUMENTS
2.2. 2.2. INTERPRETATION OF THE PROPOSAL DOCUMENTS
2.3. 2.3. PRE-PROPOSAL MEETING
2.4. 2.4. RESTRICTION OF COMMUNICATION
2.5. 2.5. NON-COLLUSION
2.6. 2.6. CODE OF ETHICS
2.7. 2.7. ADDENDA
2.8. 2.8. PROPOSAL TO REMAIN SUBJECT TO ACCEPTANCE
2.9. 2.9. LIQUIDATED DAMAGES
2.10. 2.10. EXAMINATION OF CONTRACT DOCUMENTS
2.11. 2.11. BRAND NAME OR EQUAL
2.12. 2.12. WAGE RATES
2.13. 2.13. PUBLIC INFORMATION ACT
2.14. 2.14. PROPRIETARY INFORMATION
2.15. 2.15. PROPOSAL SUBMITTAL REQUIREMENTS
2.16. 2.16. MODIFICATION, WITHDRAWAL OR NO BID
2.17. 2.17. PROPOSAL OPENING
2.18. 2.18. EVALUATION OF PROPOSAL AND AWARD OF CONTRACT
2.19. 2.19. POST PROPOSAL DOCUMENTS REQUIRED FROM SUCCESSFUL OFFEROR
3. 3. Scope of Work
3.1. 3.1. Background
3.2. 3.2. Scope of Work
4. 5. Evaluation Criteria
5. 6. Vendor Submittal
5.1. 1. Offeror confirms required insurance specified in the Terms and Conditions will be provided if awarded the project.*
5.2. 2. Proposal*
5.3. 3. Proposal Exhibit A.1*
5.4. 4. Supplier/Subcontractor Utilization Form*
5.5. 5. References Form*
5.6. 6. Non-Collusion Affidavit*
5.7. 7. Conflict of Interest Questionnaire*
5.8. 8. Compliance To State Law On Nonresident Bidders*
5.9. 9. Compliance To Texas Sales Tax Code*
5.10. 10. Form 1295 – Certificate of Interested Parties (if over $150,000)
5.11. 11. Agreement - Standard PSA