This file consists of conceptual design drawings prepared by Stantec Consulting Services for the City of Pasadena's hydrogen fueling facility project located at 159 South Kinneloa Avenue, Pasadena, California. The project encompasses the design and construction of a permanent hydrogen refueling station to support the city's planned fleet of fuel-cell electric buses. The facility will include a bulk liquefied hydrogen (LH2) tank with 18,000-gallon capacity, two cryogenic liquid-hydrogen pumps, two gaseous hydrogen (GH2) storage vessels, two hydrogen compressed gas (H35) dispensers rated for 350-bar fills, ambient vaporizers, air-cooled heat exchangers, emergency shutdown devices, diesel-fueled backup generator, gas and flame detection systems, automatic LH2 and GH2 source-isolation valves, and a boil-off gas recovery compressor system. Additional site improvements include concrete paving, ingress/egress driveways, a fuel-island canopy measuring 2,379 square feet, a bus-parking canopy measuring 4,488 square feet accommodating eight buses wide by two buses deep, masonry walls with varying heights of 8 feet to 14 feet, utility building, perimeter fencing with automatic rolling gates, and landscaping. The project site comprises 48,994 square feet with approximately 15,775 square feet of lot coverage (32 percent floor area ratio). Design is in 30 percent development stage, with the RFP issued January 7, 2026, and the mandatory pre-proposal meeting scheduled for April 23, 2026.
The design-build contract requires the awarded contractor to prepare 100 percent engineered construction drawings based on preliminary design shown in these conceptual drawings and to provide all equipment, materials, labor, and commissioning to meet design intent. The project must comply with applicable 2022 California Building Code, California Fire Code, National Fire Protection Association standards (NFPA 2 for hydrogen technologies, NFPA 30A for motor fuel dispensing facilities), Compressed Gas Association standards, and American Society of Mechanical Engineers piping standards. Zoning compliance requires adherence to City of Pasadena OS (Open Space) district regulations and the most restrictive abutting single-residential (R-6) district standards, including minimum 25-foot front setback, 10-foot side setbacks, and 25-foot rear setback. The proposed buildings fall within acceptable height limits (fueling facility 15 feet, fuel-lane canopy 19 feet 10 inches, bus-parking canopy 19 feet 3 inches). Hydrogen setback requirements per NFPA 2 vary by exposure group, with LH2 setbacks ranging from 33 to 49 feet and GH2 setbacks from 13 to 20 feet, with 50 percent reduction available for locations protected by 2-hour fire-rated walls. The estimated project cost is $16 million, with funding provided in part by the California Energy Commission's Clean Transportation Program, EnergIIZe, and the California State Transportation Agency's Transit and Intercity Rail Capital Program (TIRCP), subject to federal compliance requirements under 2 CFR 200.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
N
N
VINCINITY MAP
N
PROJECT AREA
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:3
PM
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
COVER SHEET
2045321300
G-000
Hydrogen Fueling Facility City of Pasadena
SHEET LIST
SHEET TITLE
G-000 COVER SHEET
G-101 SITE PLAN
G-102 SITE CODE ANALYSIS
G-111 HYDROGEN SETBACKS PLAN-LH2
G-112 HYDROGEN SETBACKS PLAN-GH2
D-001 FUELING-SYSTEM GENERAL NOTES
D-101 CONCEPTUAL FUELING EQUIPMENT PLAN
D-201 CONCEPTUAL ELEVATIONS
D-601 CONCEPTUAL FUELING EQUIPMENT SCHEDULE
D-611 CONCEPTUAL PROCESS FLOW DIAGRAM
D-621 CONCEPTUAL CONTROLS BLOCK WIRING DIAGRAM
E-611 CONCEPTUAL ELECTRICAL SINGLE LINE DIAGRAM
PROCESS / FUEL SHEET LIST
159 S. KINNELOA AVE, PASADENA, CA 91107PROJECT ADDRESS:
PROJECT DATA
52,200PROJECT AREA SQ. FT.:
OS - OPEN SPACEZONING DISTRICT:
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
2020, NFPA 2 - HYDROGEN TECHNOLOGIES
2020, NFPA 30A - MOTOR FUEL DISPENSING FACILITIES AND REPAIR GARAGES
2020, NFPA 55 - COMPRESSED GASES AND CRYOGENIC FLUIDS
2020, NFPA 70 - NATIONAL ELECTRIC CODE
OTHER CODES AND STANDARDS LISTED ELSEWHERE IN THE PROJECT DOCUMENTS
AND AS REQUIRED BY LOCAL JURISDICTIONS
COMPRESSED GAS ASSOCIATION (CGA)
2020, CGA G-5.5 - HYDROGEN VENT SYSTEM
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
2020, ASME B31.12 - HYDROGEN PIPING & PIPELINES
2020, ASME B31.3 - PROCESS PIPING
CODES AND STANDARDS
5754-008-906APN:
A.
B.
C.
D.
E.
PROJECT DELIVERY IS DEISGN-BUILD, WHERE THE AWARDED DESIGN-BUILDER
SHALL PREPARE 100% ENGINEERED CONSTRUCTION DRAWINGS BASED ON THE
PRELIMINARY DESIGN SHOWN HERE, AS WELL AS PROVIDE ALL EQUIPMENT,
MATERIALS, LABOR AND COMMISSIONING REQUIRED TO MEET THE DESIGN INTENT
OF THE PROCUREMENT DOCUMENTS.
CONSTRUCT A NEW PERMANENT HYDROGEN REFUELING FACILITY FOR TRANSIT-
TYPE FUEL-CELL ELECTRIC BUSES, INCLUDING EMERGENCY SHUTDOWN DEVICES,
DIESEL-FUELED BACKUP GENERATOR, GAS AND FLAME DETECTION, AND
AUTOMATIC LH2 AND GH2 SOURCE-ISOLATION VALVES IN COMPLIANCE WITH NFPA
2. THE MAJOR EQUIPMENT IS SUMMARIZED BELOW:
GROUND-MOUNTED PUMP FOR OFFLOADING LIQUID HYDROGEN (ALTERNATE)
BULK LIQUEFIED HYDROGEN (LH2) TANK, 18,000 GALLON CAPACITY
BOIL-OFF GAS RECOVERY COMPRESSOR AND SYSTEM (ALTERNATE)
BULK HYDROGEN COMPRESSED GAS (GH2) STORAGE VESSELS
(2) CRYOGENIC LIQUID-HYDROGEN PUMPS (+1 ALTERNATE)
(2) AMBIENT VAPORIZERS
(2) AIR COOLED HEAT EXCHANGERS
(2) HYDROGEN COMPRESSED GAS (H35) DISPENSERS
OTHER SITE IMPROVEMENTS, INCLUDING AREA PAVING, INGRESS/EGRESS
DRIVEWAYS, FUEL-ISLAND CANOPY, MASONRY WALLS, UTILITY BUILDING, BUS-
PARKING CANOPY AND FENCING AND GATES
ADDITIVE ALTERNATE SUMMARY
LH2 OFFLOAD
THIRD LH2 PRODUCT PUMP
BOG RECOVERY SYSTEM
LIQUID-HYDROGEN COMMODITY FOR (3) ONE-YEAR TERMS
ALL-INCLUSIVE OPERATIONS AND MAINTENANCE SERVICES FOR (3) ONE-YEAR
TERMS
HYDROGEN FUELING FACILITY PROJECT DESCRIPTION
75133CITY CIP #:
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
CITY OF PASADENA HYDROGEN FUELING FACILITY
159 S Kinneloa Ave, Pasadena, CA 91107
2022 CALIFORNIA FIRE CODE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA ELECTRICAL CODE
LOCAL AMENDMENTS AS APPLICABLE
LOCAL CODES
REB GUTHRIE
STANTEC CONSULTING SERVICES INC.
801 SOUTH FIGUEROA STREET, SUITE 300
LOS ANGELES, CA 90017
PRIME CONSULTANT AND
FUEL-SYSTEM CONSULTANT
PROJECT TEAM
OWNER
(626) 744-6771
WILL TODD
STANTEC CONSULTING SERVICES INC.
801 SOUTH FIGUEROA STREET, SUITE 300
LOS ANGELES, CA 90017
ARCHITECTURAL CONSULTANT
(213) 955-9775
(213) 955-9775
CESAR GUEVARA, PROJECT MANAGER
CITY OF PASADENA
CITY OF PASADENA | PUBLIC WORKS | ENGINEERING
100 N. GARFIELD AVE., N306, PASADENA, CA 91101
WILL TODD
STANTEC CONSULTING SERVICES INC.
801 SOUTH FIGUEROA STREET, SUITE 300
LOS ANGELES, CA 90017
ARCHITECTURAL CONSULTANT
(213) 955-9775
(213) 955-9775
DIANA DEGENKOLB
STANTEC CONSULTING SERVICES INC.
801 SOUTH FIGUEROA STREET, SUITE 300
LOS ANGELES, CA 90017
ELECTRICAL CONSULTANT
NOT FOR
CONSTRUCTION
D-101
ELECTRICAL & CONTROLS
HYDROGEN YARD
N/F WILLIAM ROSS
INSURANCE AGENCY
MILTON ST.
BRANDON ST.
S. KINNELOA AVE.
N/F
ABILITY FIRST
N/F
LANDSCAPE
WAREHOUSE
NURSERY
N/F
PRESENT
PERFECT
NURSERY
EQUIPMENT PLAN
EATON WASH
BUS-PARKING CANOPY
(8 BUSES WIDE X 2 BUSES DEEP)
S. KINNELOA AVE.
S. KINNELOA AVE.
EATON WASH
PCC PAVEMENT
10' TALL MASONRY WALL
PCC CONCRETE PAVEMENT
UTILITY STRUCTURE
PERMIETER FENCING
PCC CONCRETE PAVEMENT
PROPERTY LINE
PWP UTILITY TRANSFORMER
D-101
PCC CONCRETE PAVEMENT
115'-6 5/32"
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:4
PM
1" = 50'-0"
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
SITE PLAN
2045321300
G-101
Hydrogen Fueling Facility City of Pasadena
1" = 50'-0"G-101
1 FUELING SITE PLAN 25' 50' 100'0'
1" = 50'SCALE
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
(EXISTING) POLE
STREETLIGHT
(EXISTING)
POLE
STREETLIGHT
(EXISTING) TREE
N/F
ABILITY FIRST
BLDG
N/F WILLIAM ROSS
INSURANCE
AGENCY BLDG
S KINNELOA AVE
BRANDON ST
EATON
WASH
N/F
PRESENT PERFECT NURSERY
N/F
LANDSCAPE WAREHOUSE NURSERY
(EXISTING)
TREE
AUTOMATIC ROLLING
GATE, TYP
NEW PERIMETER
FENCE, TYP
(EXISTING) POLE
STREETLIGHT CONCRETE
PAVING, TYP
BUS PARKING
CANOPY ABOVE
AREA: 4488 SF
NEW CMU WALL
H: 14'-0"
(NEW) LIGHT
POLE, TYP
H2 FUEL LANE
CANOPY ABOVE
AREA:2379 SF
2HR FIRE RATED
CMU WALL H: 10'-0"
NEW CMU WALL
H: 8'-0" , TYP
EXISTING FENCE
TO BE REMOVED
(EXISTING) TREE
TO REMAIN, TYP
OPEN TO ABOVE
2689 SF
AREA: 1350 SF
ADJACENT PROPERTY
PARKING LOT
ADJACENT PROPERTY
PARKING LOT
ABILITY FIRST
OUTDOOR RECERATION AREA
EXISTING
FENCE TO BE
REMOVED, TYP
NEW LIGHT
POLE, TYP
WEST SIDE OF
WASH / EDGE OF
PARCEL
(NEW) LIGHT
POLE, TYP
EXISTING
FENCE TO BE
REMOVED, TYP
PROPERTY LINE, TYP
PAD MOUNTED
ELECTRIC-UTILITY
TRANSFORMER W/
BOLLARDS 4' O.C.
LOUVERED FENCE
9' TALL
2HR FIRE RATED
CMU WALL H: 11'-0"
LEGEND
ON SITE LANDSCAPE ZONE
CANOPY ABOVE
UTILITIES BLDG / ENCLOSED AREA
H2 EQUIPMENT YARD OPEN TO ABOVE AREA
EXISTING TREE TO BE REMOVED
EXISTING TREE TO REMAIN
EXISTING FENCE TO BE REMOVED
GENERAL CODE INFORMATION
1.0 GENERAL 2.0 SITE
3.0 BUILDING
4.0 ZONING REGULATIONS PER CITY OF PASADENA - OPEN SPACE
17.20.020 - ZONING DISTRICTS
SPECIAL PURPOSE DISTRICTS
LAND USE CLASSIFICATION: OS - OPEN SPACE
17.26.030 - LAND USES AND PERMIT REQUIREMENT
TABLE 2-7
SERVICES: MAINTENANCE AND SERVICE FACILITIES
CONDITIONAL USE, CONDITIONAL USE PERMIT REQUIRED
17.26.040 - SPECIAL PURPOSE DISTRICT GENERAL DEVELOPMENT STANDARDS
PROPERTIES WITHIN THE OS DISTRICTS SHALL BE SUBJECT TO THE DEVELOPMENT
STANDARDS OF THE MOST RESTRICTIVE ABUTTING ZONING DISTRICT
17.22.040 - RESIDENTIAL DISTRICTS GENERAL DEVELOPMENT STANDARDS
MOST RESTRICTIVE ABUTTING ZONING DISTRICT: SINGLE-RESIDENTIAL (R-6)
LAND USE CLASSIFICATION: LOW-DENSITY RESIDENTIAL
TABLE 2-3
A. MIN SETBACKS:
FRONT: 25'
SIDES: 10'
REAR: 25'
B. MAX. BUILDING HEIGHT: SITE OF 75 FT WIDE OR MORE: 32'
PROPOSED: 20' HIGHEST POINT OF CANOPY
C. MAXIMUM DENSITY: 1 DWELLING UNIT PER LOT (NOT APPLICABLE)
SITE ADDRESS:
CODES IN EFFECT
CALIFORNIA BUILDING CODE, 2022 EDITION
CALIFORNIA PLUMBING CODE, 2022 EDITION
CALIFORNIA MECHANICAL CODE, 2022 EDITION
CALIFORNIA ELECTRICAL CODE, 2022 EDITION
CALIFORNIA ENERGY CONSERVATION CODE, 2022 EDITION
CALIFORNIA FIRE CODE, 2022 EDITION
CALIFORNIA GREEN BUILDING STANDARDS CODE, 2022 EDITION
NATIONAL ELECTRIC CODE (NEC)
NFPA 30A
CFC CHAPTER 23 MOTOR FUEL - DISPENSING FACILITIES
NFPA 2, HYDROGEN TECHNOLOGIES, 2023
THE PASADENA, CALIFORNIA MUNICIPAL CODE, 2024 EDITION
OWNER:
CITY OF PASADENA
AUTHORITY HAVING JURISDICTION:
CITY OF PASADENA, BUILDING & SAFETY DIVISION
159 SOUTH KINNELOA AVENUE, PASADENA, CA 91107
APN - 5754-008-906
SITE:
SQUARE FOOTAGE: 48,994 SF APPROX
LOT COVERAGE: 15,775 SF / 48,994 SF = 32%
FAR: 0.32
BUILDING DESCRIPTION AND CONSTRUCTION TYPE :
A. H2 FUELING BUILDING AND YARD. TYPE II-B CONSTRUCTION, NONSPRINKLER
B. H2 FUEL LANE CANOPY. TYPE II-B CONSTRUCTION, NONSPRINKLER
C. BUS PARKING CANOPY. TYPE II-B CONSTRUCTION, NONSPRINKLER
BUILDING USE AND OCCUPANCY CLASSIFICATION (CBC CHAPTER 3):
A. H2 FUELING BUILDING AND YARD
B. H2 FUEL LANE CANOPY
C. BUS PARKING CANOPY
USE OCCUPANCY
FLAMMABLE GASES / CRYOGENIC FLUIDS
MOTOR FUEL - DISPENSING FACILITIES
CARPORT
GROUP H-2
GROUP M
GROUP U
BUILDING HEIGHT (CBC TABLES 504.3, 504.4)
A. H2 FUELING BUILDING AND YARD
ALLOWABLE (H-2 OCCUPANCY, NS)
PROPOSED:
B. H2 FUEL LANE CANOPY
ALLOWABLE (M OCCUPANCY, NS)
PROPOSED:
C. BUS PARKING CANOPY
ALLOWABLE (U OCCUPANCY, NS)
PROPOSED:
HEIGHT (FEET ) STORIES
ALLOWABLE (H-2 OCCUPANCY): 55'-0"
PROPOSED: 15'-0"
ALLOWABLE (M OCCUPANCY): 55'-0"
PROPOSED: 19'-10"
ALLOWABLE (U OCCUPANCY): 75'-0"
PROPOSED: 19'-3"
BUILDING AREA (CBC TABLES 506.2)
A. H2 FUELING BUILDING AND YARD
ALLOWABLE (H-2 OCCUPANCY, NS)
PROPOSED:
B. H2 FUEL LANE CANOPY
ALLOWABLE (M OCCUPANCY, NS)
PROPOSED:
C. BUS PARKING CANOPY
ALLOWABLE (U OCCUPANCY, NS)
PROPOSED:
7,000 SF
4,173 SF
12,500 SF
2,384 SF
8,500 SF
8,488 SF
OCCUPANCY SEPARATION (CBC TABLE 508.4)
508.3.3 SEPARATION.
EXCEPTIONS:
1. GROUP H-2 OCCUPANCIES SHALL BE SEPARATED
FROM ALL OTHER OCCUPANCIES IN ACCORDANCE
SECTION 508.4
FIRE RESISTANCE RATINGS (CBC TABLES 601 AND 705.5)
ELEMENT
17.44.060 - LANDSCAPE LOCATION REQUIREMENTS
B. NON RESIDENTIAL: THE TOTAL AREA OF EACH NON-RESIDENTIAL PROJECT NOT DEVOTED TO
LOT COVERAGE AND PAVING SHALL BE LANDSCAPE, IRRIGATED, AND MAINTAINED IN
COMPLIANCE WITH THIS CHAPTER.
TYPE II-B
H-GROUP
PRIMARY STRUCTURAL FRAME
BEARING WALLS
- EXTERIOR
- INTERIOR
NON-BEARING WALLS / PARTITIONS
- EXTERIOR (TABLE 705.5) OCCUPANCY
FIRE SEPARATION DIST < 5'
FIRE SEPARATION DIST 5' - 10'
FIRE SEPARATION DIST 10' -30'
FIRE SEPARATION DIST > 30'
FLOOR CONSTRUCTION
ROOF CONSTRUCTION
0-HR
0-HR
0-HR
0-HR
H-2
3-HR
2-HR
1-HR
0-HR
0-HR
0-HR
M
2-HR
1-HR
0-HR
0-HR
U
1-HR
1-HR
0-HR
0-HR
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:0
PM
As indicated
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
SITE CODE ANALYSIS
2045321300
G-102
Hydrogen Fueling Facility City of Pasadena
1" = 30'-0"G-102
1 CODE ANALYSIS
ISSUED FOR RFP 2026.01.07
33' LH2 SETBACK GROUP 3
TYPE OF EXPOSURE
38' LH2 SETBACK GROUP 2
TYPE OF EXPOSURE
49' LH2 SETBACK GROUP 1
TYPE OF EXPOSURE
33'-0"38'-0"
49'-0"
1.
2.
NOTES:
WALL WITH MINIMUM 2-HOUR FIRE RATING REDUCES THE LISTED SETBACK FOR ALL GROUPS BY 50% OF THE LISTED
DISTANCES.
TABLE IS REFERENCED FROM NFPA 2 (2022).
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:0
PM
As indicated
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
HYDROGEN SETBACKS PLAN-LH2
2045321300
G-111
Hydrogen Fueling Facility City of Pasadena
ISSUED FOR RFP 2026.01.07
1" = 30'-0"G-111
1 HYDROGEN SETBACKS PLAN-LH2
13' GH2 SETBACK GROUP 3
TYPE OF EXPOSURE
14' GH2 SETBACK GROUP 2
TYPE OF EXPOSURE
20' GH2 SETBACK GROUP 1
TYPE OF EXPOSURE
10' MIN SEPARATION
DISTANCE FOR GH2
DISPENSING EQUIPMENT
10'-0"
13'-0"
14'-0"
20'-0"
1.
2.
NOTES:
WALL WITH MINIMUM 2-HOUR FIRE RATING REDUCES THE LISTED SETBACK FOR ALL GROUPS BY 50% OF THE LISTED
DISTANCES.
TABLE IS REFERENCED FROM NFPA 2 (2022).
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:1
PM
As indicated
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
HYDROGEN SETBACKS PLAN-GH2
2045321300
G-112
Hydrogen Fueling Facility City of Pasadena
ISSUED FOR RFP 2026.01.07
1" = 30'-0"G-112
1 HYDROGEN SETBACKS PLAN-GH2
0.359 9.1186 6.096 20 4.2672 14 3.9624 13
TABLE 7.3.2.3.1.2 (B)(c) MINIMUM DISTANCE (D) FROM OUTDOOR BULK HYDROGEN COMPRESSED GAS SYSTEMS TO EXPOSURES BY MAXIMUM PIPE SIZE WITH PRESSURES >3000 TO <= 15,000 PSIG
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:1
PM
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
FUELING-SYSTEM GENERAL NOTES
2045321300
D-001
Hydrogen Fueling Facility City of Pasadena
1. GENERAL
1.1. THESE REQUIREMENTS COVER THE WORK OF DESIGNING, ENGINEERING,
PROCURING, FABRICATING, CONSTRUCTING, TESTING, COMMISSIONING AND HANDING
OVER THE HYDROGEN-FUELING SYSTEM AS DESCRIBED IN THE PROJECT DOCUMENTS.
THE DESIGN-BUILDER SHALL BE RESPONSIBLE FOR UNDERSTANDING THE INTENT OF
THE DRAWINGS AND PROVIDING A COMPLETE WORKING SYSTEM. ANY OMISSIONS OR
DISCREPANCIES AMONG THE DRAWINGS, SPECIFICATIONS, AND OTHER CONTRACT
PROVISIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER FOR
CLARIFICATION.
1.2. PROCESS SYSTEMS COVERED BY THESE SPECIFICATIONS INCLUDE ALL UNDER
AND ABOVEGROUND PIPING, INCLUDING VENTS, DRAINS, STAINLESS STEEL MEDIUM-
PRESSURE TUBING.
1.3. CONSTRUCTION AND INSTALLATION SHALL CONFORM TO THE FOLLOWING CODES
AND STANDARDS, LATEST EDITION AS ADOPTED OR AMENDED BY THE AUTHORITIES
HAVING JURISDICTION.
ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE)
ASME B31.3 - PROCESS PIPING
ASME B31.12 - HYDROGEN PIPING AND PIPELINES
ASME B16.5 - STEEL PIPE FITTING AND FLANGES
2022 CALIFORNIA FIRE CODE (WITH LOCAL AMENDMENTS ADOPTED)
NFPA (NATIONAL FIRE PROTECTION ASSOCIATION)
NFPA 2-2020 - HYDROGEN TECHNOLOGIES CODE
NFPA 52-2020 - VEHICULAR GASEOUS FUEL SYSTEMS CODE
NFPA 55-2020 - COMPRESSED GASES AND CRYOGENIC FLUIDS CODE
CGA (COMPRESSED GAS ASSOCIATION)
CGA G-5.5-2021 - STANDARD FOR HYDROGEN VENT SYSTEMS
1.4. THE GC SHALL PERFORM A DETAILED SUBSURFACE INVESTIGATION OF THE SITE
PRIOR TO THE START OF CONSTRUCTION. THE GC IS SOLELY RESPONSIBLE TO
PERFORM THIS SUBSURFACE UTILITY EXPLORATION(S) AND WILL IDENTIFY ANY AND ALL
UNDERGROUND GROUND (UG) UTILITIES AND STRUCTURES, AND SHALL SUBMIT THIS
INFORMATION TO THE OWNER FOR REVIEW BEFORE THE START OF ANY FIELD WORK.
THE GC SHALL IDENTIFY ANY/ALL UG CONFLICTS AND SHALL BE RESPONSIBLE FOR ANY
SUCH ISSUES THAT APPEAR DURING CONSTRUCTION. THE GC SHALL ALSO PERFORM
ALL REQUIRED DETAILED SITE SURVEYS INCLUDING TOPOGRAPHICAL SURVEYS OF THE
EXISTING FOOTING, CURB AND ALL ELEVATIONS AS IDENTIFIED IN THE DESIGN
DOCUMENTS TO ASSIST IN THE COMPLETION OF THE PROPOSED AREA CONCRETE
INSTALLATION, DRAINAGE AND SHALL PERFORM ALL SURVEYS. THE GC SHALL BE
RESPONSIBLE FOR ANY/ALL MISSING, OMITTED INFORMATION THAT LEADS TO
CONSTRUCTION FIELD ISSUES, CHANGES OR REQUESTS FOR COMPENSATION. THE
DESIGN-BUILDER SHALL HAVE NO CLAIM FOR ANY COMPENSATION REGARDING
RESULTS ATTRIBUTED TO ALL SURVEYS AND SURVEY RESULTS.
1.5. THE DESIGN-BUILDER SHALL NOTIFY THE CLIENT OF ANY DAMAGE TO ANY
EXISTING UNDERGROUND WET OR DRY UTILITIES, OR TO ANY CONDUITS DAMAGED
DURING TRENCHING, AND SHALL REPAIR THEM IMMEDIATELY ACCORDING TO THE
STANDARDS OF THE AGENCY HAVING JURISDICTION OVER THEM, AND AT NO COST TO
THE OWNER.
1.6 THE DESIGN-BUILDER AND ALL SUBCONTRACTORS SHALL SUBMIT SHOP DRAWINGS
FOR ALL MECHANICAL PIPING, VALVE AND EQUIPMENT INSTALLATIONS TO THE OWNER
FOR REVIEW AND INFORMATION PRIOR TO MATERIALS ORDERING OR THE START OF
ANY FIELD INSTALLATIONS.
1.7 THE DESIGN OF THE HYDROGEN FACILITY SHALL MEET ALL REQUIREMENTS OF
'PROCESS SAFETY MANAGEMENT' FOR HYDROGEN FACILITIES THAT STORE MORE THAN
10,000 LB. OF HYDROGEN, PER 29 CFR 1910.119. THIS INCLUDES COMPLIANCE WITH ALL
INITIAL DESIGN CRITERIA AND DESIGN DOCUMENTATION REQUIRED BY PSM. ONGOING,
POST-OCCUPANCY DOCUMENTATION AND SYSTEM COMPLIANCE SHALL BE THE
RESPONSIBILITY OF THE OPERATIONS AND MAINTENANCE DESIGN-BUILDER.
2. PIPING DESIGN CONDITIONS
2.1. DESIGN, FABRICATION, INSPECTION AND TESTING OF ALL METALLIC & NON-
METALLIC PIPING SHALL BE PERFORMED AS PER ASME B31.12 FOR HYDROGEN PIPING
AND ASME B31.3 FOR ALL OTHER PROCESS PIPING.
2.2. DESIGN AND OPERATING CONDITIONS SHALL BE PER MANUFACTURER TECHNICAL
DOCUMENTS. REFER TO PROCESS FLOW DIAGRAM AND PIPING AND TUBING SCHEDULE
FOR DETAILS.
3. INSTALLATION
3.1. THE DESIGN-BUILDER SHALL USE ONLY TUBING INSTALLERS WHO ARE TRAINED
AND CERTIFIED BY THE TUBE FITTING MANUFACTURER TO INSTALL TUBE AND
ASSOCIATED FITTINGS PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE
DESIGN-BUILDER SHALL PROVIDE PROOF OF CERTIFICATION TO THE PROJECT
MANAGER PRIOR TO COMMENCING WORK.
3.2. ALL PIPING SHALL BE INSTALLED NEATLY AND IN A WORKMAN-LIKE MANNER. ALL
PIPING SHALL BE PROPERLY ANCHORED, SUPPORTED, OR PITCHED ACCORDING TO
THESE CONSTRUCTION SPECIFICATIONS AND THE DRAWINGS, OR IN THE ABSENCE OF
SPECIFIC DETAIL, PER THE DIRECTION OF THE ENGINEER. ALL PIPING SHALL RUN TRUE
TO VERTICAL AND HORIZONTAL AXES OF THE EQUIPMENT AND FACILITY. THE DESIGN-
BUILDER SHALL PROVE ALL PIPING IS FREE OF OBSTRUCTION AND DEBRIS, PRIOR TO
CONNECTING TO ABOVEGROUND EQUIPMENT.
3.3. ALL VALVES SHALL BE INSTALLED NEATLY AND ACCESSIBLE FOR EASY OPERATION
AND MAINTENANCE.
3.4. CLEAN THE INTERNAL PIPE SURFACE OVER ITS ENTIRE LENGTH, REMOVING ALL
DIRT, DEBRIS, AND LOOSE CORROSION OR SCALE, BEFORE THE PIPE IS FITTED OR
ALIGNED FOR WELDING. OPEN ENDS OF ALL PIPE RUNS SHALL BE KEPT SECURELY
CLOSED TO PREVENT THE ENTRANCE OF DIRT, DEBRIS, WATER, OR ANIMALS INTO THE
PIPE. ALL END CLOSURES SHALL BE APPROVED BY THE OWNER.
4. MECHANICAL INSULATED PIPING
4.1. PROVIDE THICK POLYISOCYANURATE (HIGH DENSITY FOAM) INSULATION OR
APPROVED EQUAL ON ALL COOLANT PIPES AND GASEOUS HYDROGEN DISPENSING
TUBING AS NOTED. PROVIDE APPROVED JACKET FOR MECHANICAL PROTECTION. ON
OTHER PARTS, A DOUBLE LAYER OF AP ARMAFLEX BLACK LAP SEAL WITH ARMA-CHEK
R, OR APPROVED EQUAL IS ACCEPTABLE.
5. VACUUM INSULATED PIPING
5.1. THE (VIP) VACUUM INSULATED PIPING SYSTEM SHALL BE COMPOSED OF
PREFABRICATED SECTIONS OR "SPOOLS" OF THE STATIC VACUUM DESIGN. THE
SPOOLS SHALL HAVE WELDED STUB END CONNECTIONS. NO SPOOL SHALL EXCEED 40
FEET IN LENGTH, 8'-0" IN WIDTH OR 4'-0" IN HEIGHT
5.2. UNLESS OTHERWISE STATED, THE INNER CARRIER LINE MATERIAL SHALL BE MADE
OF 316 STAINLESS STEEL PIPE WITH A MINIMUM WALL THICKNESS OF SCHEDULE 10.
5.3. THE VACUUM JACKET SHALL BE DESIGNED IN ACCORDANCE WITH ASME BOILER
AND PRESSURE VESSEL CODE FOR UNFIRED PRESSURE VESSEL, SECTION VIII FOR AN
INTERNAL VACUUM AND EXTERNAL ATMOSPHERIC PRESSURE WITH THE ASSEMBLY AT
AMBIENT TEMPERATURE.
5.4. WELDING TO JACKET WALL IS PROHIBITED.
5.5. EXPANSION JOINTS SHALL BE INSTALLED IN THE JACKET PIPE OF EACH SPOOL AS
REQUIRED TO COMPENSATE FOR THE DIFFERENTIAL RATES OF EXPANSION AND
CONTRACTION BETWEEN THE INNER CARRIER AND JACKET PIPE.
5.6. A MINIMUM VACUUM LEVEL OF 0.009 TORR AT AMBIENT TEMPERATURE MUST BE
MET AND VERIFIED USING A HELIUM LEAK DETECTOR WITH A SENSITIVITY OF 10-9
CC/SEC.
5.7 PIPE ROUTING SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO
CONSTRUCTION.
5.8 A THERMAL RELIEF VALVE SHALL BE INSTALLED ANYWHERE THAT LIQUID
HYDROGEN MAY BECOME TRAPPED BETWEEN ISOLATION VALVES. THE QUANTITY AND
CAPACITIES OF EACH RELIEF VALVE SHALL BE CALCULATED BASED ON CGA S-1.2
5.9 THE DESIGN, MATERIAL OF CONSTRUCTION, FABRICATION, AND INSPECTION SHALL
BE IN ACCORDANCE WITH ASME B31.12.
5.10 EXPANSION JOINTS CONSTRUCTED OF 300 SERIES STAINLESS STEEL SHALL BE
APPLIED WHERE REQUIRED TO ALLOW FOR THERMAL EXPANSION AND CONTRACTION.
ALL EXPANSION JOINTS SHALL HAVE A MINIMUM DESIGN LIFE CYCLE OF 7,000 CYCLES.
PROCESS-SYSTEM NOTES
6. WELDING
6.1. WELDING PROCEDURES SHALL BE IN ACCORDANCE WITH ASME B31.3 "PROCESS
PIPING, CHAPTER V, "FABRICATION, ASSEMBLY, AND ERECTION".
6.2. THE DESIGN-BUILDER SHALL SUBMIT WELDING PROCEDURE SPECIFICATIONS (WPS)
TO THE ENGINEER FOR APPROVAL, PRIOR TO STARTING WORK. EACH WPS SHALL BE
IDENTIFIED WITH THE THE DESIGN-BUILDER'S NAME AND IDENTIFICATION NUMBER.
WELDING SHALL NOT COMMENCE UNTIL THE PROCEDURE IS APPROVED.
6.3. EACH WELDER MUST PROVIDE A COMPLETE PROCEDURE QUALIFICATION. RECORD
(PQR) SIGNED BY AN AUTHORIZED OFFICER OF THE TESTING LABORATORY OR DEPUTY
WELDING INSPECTOR AND THE DESIGN-BUILDER'S AUTHORIZED REPRESENTATIVE.
PREVIOUS WELDING CERTIFICATION (ACTIVE CERTIFICATION WITHIN THE PREVIOUS SIX
(6) MONTHS) MAY BE SUBMITTED FOR APPROVAL.
6.4. WELD TESTS SHALL BE PERFORMED PER ASME B31.3, AND APPROVED BY THE
OWNER.
6.4.1. NOT LESS THAN 5% OF ALL BUTT WELDS BY EACH WELDER PERFORMING WORK AT
THE SITE SHALL BE RANDOMLY SELECTED AND RADIOGRAPHED.
6.4.2. RADIOGRAPHS SHALL BE EVALUATED BY A CERTIFIED RADIOGRAPHIC
INTERPRETER. ALL FIELD TESTING SHALL BE DOCUMENTED AND WITNESSED AND BE
SUBMITTED IN WRITING TO THE RTC WITHIN THREE (3) BUSINESS DAYS OF THE
RESPECTIVE TEST.
7. FABRICATION, HANDLING, AND STORAGE
7.1. THE FABRICATION TOLERANCE FOR PIPING SHALL COMPLY WITH ASME B31.12 CHAP.
GR-3.
7.2. ALL PRE-FABRICATED PIPE SPOOLS, AND OTHER PIPING AND/OR TUBING
COMPONENTS SHALL BE PROTECTED DURING STORAGE, TRANSIT, AND ERECTION WITH
PLYWOOD COVERS 1/2" THICK AND SECURED WITH BOLTS FOR CLOSURE, OR EQUAL.
SHOP FABRICATED SECTIONS SHALL NOT BE LEFT WITH OPEN ENDS EXPOSED TO
ATMOSPHERE DURING STORAGE, TRANSIT, OR ERECTION. SUITABLE CAPS SHALL BE
PROVIDED ON ALL MECHANICAL CONNECTIONS.
7.3. TEMPORARY SUPPORTS SHALL BE PROVIDED AND INSTALLED DURING ERECTION TO
AVOID OVER-STRESSING PIPING OR EQUIPMENT TO WHICH PIPING IS CONNECTED.
8. TRENCHING
8.1. LH2 LINES SHALL NOT BE BURIED.
8.2 ONLY GH2 LINES ROUTED UNDER THE SERVICE-DRIVE LANES MAY BE BURIED.
MINIMUM BURY DEPTH IS 24" TO TOP OF TUBING SLEEVE.
8.3 UNDERGROUND LINES CARRYING CHILLED GH2 AND CHILLING FLUIDS SHALL BE
INSULATED AND SHALL BE PROTECTED USUING A DURABLE JACKET OR SLEEVE THAT IS
LISTED FOR DIRECT BURIAL.
9. PRESSURE TEST
9.1. WHEN ASSEMBLY OF ALL GAS PIPING OR TUBING IS COMPLETE, CLEANED, AND
PURGED OF ALL CONSTRUCTION AND ASSEMBLY DEBRIS, A PNEUMATIC PRESSURE TEST
SHALL BE PERFORMED IN ACCORDANCE WITH ASME B31.12 FOR HYDROGEN PIPING; ALL
OTHER PROCESS PIPING SHALL BE TESTED IN ACCORDANCE WITH ASME B31.3, PER
ASME B31.12 AND NFPA 2 (LH2 SYSTEMS). THE DESIGN-BUILDER SHALL NOTIFY THE
PROJECT MANAGER THAT A TEST IS SCHEDULED, NOT LESS THAN 2 BUSINESS DAYS
BEFORE THE TEST IS SCHEDULED TO BEGIN.
9.2. IF COLD WEATHER LIMITS ACHIEVABLE TEST PRESSURES, THE DESIGN-BUILDER
SHALL SUBMIT AN ALTERNATIVE COLD WEATHER PRESSURE TEST PLAN TO THE
ENGINEER FOR REVIEW.
9.3. REMOVE ALL PRESSURE SENSITIVE DEVICES AND EQUIPMENT NOT RATED TO
WITHSTAND FINAL TEST PRESSURE, BEFORE PERFORMING PNEUMATIC PRESSURE TEST.
9.4. PRESSURE TEST RECORDS SHALL BE AVAILABLE AT THE TIME OF INSPECTION BY
THE BUILDING OFFICIAL.
10. PURGING AND PRESSURIZING
10.1. ALL PURGING AND PRESSURIZING SHALL BE PERFORMED BY THE DESIGN-BUILDER
AND OBSERVED BY THE OWNER OR THE OWNER'S DESIGNATED REPRESENTATIVE. THE
ESD SYSTEM SHALL BE OPERATIONAL BEFORE THE PIPING SYSTEM IS PRESSURIZED
WITH HYDROGEN. HYDROGEN SHALL NOT BE INTRODUCED INTO THE SYSTEM WITHOUT
PRIOR AUTHORIZATION BY THE CLIENT'S CONSTRUCTION MANAGER. ALL AIR SHALL BE
PURGED FROM THE ENTIRE SYSTEM TO THE SATISFACTION OF THE CLIENT'S
CONSTRUCTION MANAGER, AND IN ACCORDANCE WITH THE EQUIPMENT
MANUFACTURER'S INSTRUCTIONS AND PER ASME B31.12 AND NFPA 2 (LH2 SYSTEMS),
BEFORE THE SYSTEM MAY BE PRESSURIZED.
10.2. ALL FABRICATION, WELD TESTING, PRESSURE TESTING AND WORK REQUIRING
FLAME OR SPARKING DEVICES SHALL BE COMPLETED BEFORE INTRODUCING HYDROGEN
GAS TO ANY PIPING SYSTEM.
10.3. PROVIDE MATERIALS, EQUIPMENT AND PROCEDURES AS NEEDED TO ENSURE
PURITY OF GASEOUS HYDROGEN THAT IS PROVIDED AT THE DISPENSERS. DISPENSED
FUEL SHALL BE 99.999% PURE HYDROGEN.
10.4.ALL PIPING, TUBING, VALVES, INSTRUMENTATION, AND COMPONENTS IN CONTACT
WITH HDYROGEN SHALL BE CLEANED FOR OXYGEN SERVICE IN ACCORDANCE WITH CGA
G-4.1.
11. THE DESIGN-BUILDER SHALL PROVIDE A 12-MONTHS PARTS AND LABOR MAINTENANCE
SERVICE CONTRACT FOR THE INSTALLED HYDROGEN FUELING EQUIPMENT AND SYSTEMS.
THIS MAINTENANCE SERVICE CONTRACT SHALL INCLUDE PREVENTATIVE MAINTENANCE OF
ALL SYSTEMS (SUBMITTING SUCH FORMS TO THE OWNER PRIOR TO PERFORMING ANY
TASKS, PERFORMING QUARTERLY, SEMI- ANNUAL AND ANNUAL INSPECTIONS ON ALL
REQUIRED FUELING SYSTEMS ALL REQUIRED MAINTENANCE, ASSURING ALL REQUIRED
SPARE PARTS AND EQUIPMENT IS ON HAND SO THAT THE FUELING SYSTEM IS IN
OPERATION AT ALL REQUIRED FUELING INTERVALS. ALL COSTS SHALL BE INCLUDED IN
THE BID SCHEDULE OF VALUES AND THE DESIGN-BUILDER OR HIS
SUBCONTRACTORS/SUPPLIERS SHALL HAVE NO CLAIM FOR ADDITIONAL
COMPENSATION.
OTHER REQUIREMENTS
11.1. THE DESIGN-BUILDER SHALL COMPLETE AND WARRANTY THE PROJECT. THE
MATERIALS AND WORKMANSHIP FOR THE PROJECT SHALL BE WARRANTED TO BE FREE
OF DEFECTS IN DESIGN, MANUFACTURE, AND INSTALLATION FOR A PERIOD OF 36
MONTHS FOLLOWING THE DECLARATION OF SUBSTANTIAL OF THE ROJECT AS BEING
COMPLETE BY THE OWNER.
11.2. PROVIDE ADDITIVE-ALTERNATE PRICING FOR THE STATION FEATURES LISTED
BELOW. EACH ALTERNATE IS STAND ALONE, AND PRICING SHALL INCLUDE PIPING,
POWER SUPPLY, ANCHORING AND PROCESS-CONTROLS INTEGRATION, AND SHALL BE
COMPLETE, CODE COMPLIANT AND FUNCTIONAL.
A. GROUND-MOUNTED LH2-OFFLOAD PUMP, INCLUDING POWER SUPPLY.
B. THIRD 60 KG/HR LH2-PRODUCT PUMP MATCHING (2) BASE PUMPS, INCLUDING POWER
SUPPLY.
C. BOIL OFF GAS (BOG) RECOVERY COMPRESSOR, INCLUDING SUPPLY-CONTROL
VALVE, AMBIENT AND POWERED HEAT EXCHANGERS, COMPRESSOR SKID, AND (3) 31'
LONG GH2 STORAGE VESSELS.
D. (36) MONTHS OF LH2 COMMODITY DELIVERED TO THE SITE, AS PRESCRIBED IN THE
PROJECT RFP.
E. (3) ONE-YEAR TERMS FOR OPERATIONS AND MAINTENANCE SERVICE, AS
PRESCRIBED IN THE PROJECT RFP.
11.3 START-UP REQUIREMENTS:
A. PROVIDE COMPREHENSIVE COMMISSIONING AND VALIDATION OF ALL SYSTEM
FUNCTIONS, TO INCLUDE CALIBRATION OF THE DISPENSERS THAT IS EQUIVALENT
TO LOS ANGELES COUNTY WEIGHTS AND MEASUREMENT CERTIFICATION.
B. COMPLY WITH 'HYSTEP' FUNCTIONAL TESTING, OR SIMILAR TESTING AS APPROVED
BY THE OWNER.
C. PROVIDE 7 CONTINUOUS DAYS OF NORMAL STATION OPERATION WITHOUT A
SYSTEM FAULT, SHUTDOWN OR FAILURE.
D. STARTUP SERVICES SHALL INCLUDE ONSITE SUPPORT AND COORDINATION BY ALL
EQUIPMENT AND PRODUCT VENDORS AS NEEDED TO MEET THE PROJECT
REQUIREMENTS, TO INCLUDE SUPPORT FOR PUMP ASSEMBLIES, CONTROLLERS,
PLCS, CHILLING EQUIPMENT, DISPENSERS AND FUEL-MANAGEMENT TERMINALS.
E. TURN OVER OF ALL HSP-RELATED MATERIALS AND COORDINATION OF SITE-SAFETY
DOCUMENTATION AND PROCEDURES WITH DESIGNATED MAINTENANCE / O&M
ENTITY.
ABBREVIATIONS
°C °F
AC
A/C A/C
ACK
AFF
AFG
AHJ
A/G
AHU
APPR, ~
ARCH
AVG
BEB
BF
BLDG
BOP
BTM
BTWN
BV
C/A, CA, C.A.
CAC
CAV
CCS
CCW
CL
CLR
CMU
CNG
CO
COMP
CONC
CONN
CONT
CPL, CPLG
CS
C/T
CU
CU FT
CV
CW
(D) dB
DC
DEF
DEG
DEPT
DIA, Ø
DIM
DISCH
DISP'R
DIV
DSL
DWG, DWG #
(E)
EA
EBB
EG
ELEC
EL, ELEV
ELL
ENCL
EO
EOL
ESD, E-STOP
EV
EXH
(F)
FC
FD
FE, FX
F/F
FH
FIG
FLEX
FMT
FNPT
FT
FW
FOM
FOR
FOS
GAL
GALV
GH2
GND
GR
GT
H H2
HC
HDR
HX, HEX
HORIZ
HP
HPNG
HSP
HT
HYSTEP
ICBO
IBC
ID
IFC
IN
IP
IPC
IPS
ISO
JBOX
KVA
KW
KWh
NUMBER, POUND, CLASS
LESS THAN
GREATER THAN
DEGREES CELSIUS
DEGREES FAHRENHEIT
A
ALTERNATING CURRENT
AIR CONDITIONER
ASPHALT CONCRETE (BITUMINUS)
ACKNOWLEDGEMENT (SWITCH / BUTTON)
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AUTHORITY HAVING JURISDICTION
ABOVE GROUND
AIR HANDLING UNIT
APPROXIMATELY
ARCHITECTURAL
AVERAGE
B
BATTERY ELECTRIC BUS
BLIND FLANGE
BUILDING
BOTTOM OF PIPE
BOTTOM
BETWEEN
BALL VALVE
C
COMPRESSED AIR
CALIFORNIA ADMINISTRATIVE CODE
CONSTANT AIR VOLUME
COMBINED CHARGING SYSTEM
COUNTER CLOCKWISE
CENTER LINE, CHAIN LINK (FENCE), CLASS
CLEARANCE
CONCRETE MASONRY UNIT
COMPRESSED NATURAL GAS
CARBON MONOXIDE, CLEAN OUT
COMPRESSOR
CONCRETE, CONCENTRIC
CONNECTION
CONTINUOUS, CONTINUATION
COUPLING
CARBON STEEL, CAP SCREW
CONE & THREAD FITTING
COPPER (PIPE), CUBIC
CUBIC FEET
CHECK VALVE
CLOCKWISE
D
DEMO
DECIBLES
DIRECT CURRENT
DIESEL EXHAUST FLUID
DEGREE
DEPARTMENT
DIAMETER
DIMENSION
DISCHARGE
DISPENSER
DIVISION
DIESEL
DRAWING, DRAWING NUMBER
E
EXISTING
EACH
ELECTRIC BATTERY BUS
ETHELYENE GLYCOL
ELECTRICAL
ELEVATION
ELBOW
ENCLOSURE
EDGE OF
ELBOLET
EMERGENCY SYSTEM SHUT-DOWN DEVICE
ELECTRIC VEHICLE
EXHAUST
F
FUTURE
FUEL CELL
FIRE DEPARTMENT, FLOOR DRAIN
FIRE EXTINGUISHER
FLANGE FACE
FIRE HYDRANT
FIGURE
FLEXIBLE (CONNECTOR / HOSEMETAL OR RUBBER )
FUEL MANAGEMENT TERMINAL
FEMALE NOMINAL PIPE THREAD
FOOT
FIELD WELD
FACE OF MASONRY
FUEL OIL RETURN
FUEL OIL SUPPLY
G
GALLON
GALVANIZED
GASEOUS HYDROGEN
GROUND
GRADE
GAS DETECTOR
H
HYDROGEN LIQUID, HIGH
HYDROGEN GAS
HANDICAP
HEADER
HEAT EXCHANGER
HORIZONTAL
HIGH PRESSURE
HIGH PRESSURE NATURAL GAS
HYDROGEN SAFETY PLAN
HEIGHT
HYDROGEN STATION EQUIPMENT PERFORMANCE
I
INTERNATIONAL CONFERENCE OF BLDG OFFICIALS
INTERNATIONAL BUILDING CODE
INSIDE DIAMETER
INTERNATIONAL FIRE CODE
INCH
INTERNET PROTOCOL
INTERNATIONAL PLUMBING CODE
IRON PIPE SIZE
ISOMETRIC (DRAWING)
J
JUNCTION BOX
K
KILOVOLT AMPS
KILOWATT
KILOWATT HOUR
L
LB
LC
LF
LG
LH2
LKG
LLC
LO
LOL
LP
LR
LTG
LV
M
MATL
MAWP
MAX
MB
MECH
MFG
MO
MIL
MIN
MISC
MGMT
MSA
MTR
MTG
MUA
(N) N/A
NC
NEC
NFPA
NGV
NPS
NPT
NIC
NIS
NIP
NO
NO2
NPS
NPT
NTS
O2
OAI
OC
OD
O/H, OVHD
P
PB
PBE
PE
PFD
PI
PL
P/N
PLC
PLCS
POC
PRESS
PRV
PS
PSI
PSV
PSIG
PVC
PVF
QTY
QUAL
RAD
RED, RDCR
RED ELL
RED TEE
REF
REQ'D
REV
RFF
RFBF
RFWNF
RED TEE
RM
RTJ
RCP
REINF
SA
SCH, SCHED
SEC
SIM
SW
SQ
SQ FT
SCFH
SS
SC
SCF
SCG
SD
SDL
SKT BLD
SO
SOL
SPECS
SR
SRL
SRV
SS, ST STL
STD
STL
STP
STOR
STRUCT
SUB
SUSP
SW
SWG
SWP
L
LENGTH
POUND (# INCLUDED)
LOCKED CLOSED
LINEAR FEET
LONG
LIQUID HYDROGEN
LOOKING AT / FACING TOWARDS
LIQUID LEVEL CONTROLLER
LOCKED OPEN
LATROLET
LINE PIPE, LIGHT POLE
LONG RADIUS
LIGHTING
LOW VOLTAGE
M
METER, METHANE
MATERIAL
MAXIMUM ALLOWABLE WORKING PRESSURE
MAXIMUM
MACHINE BOLT
MECHANICAL
MANUFACTURER
MASONRY OPENING
MILITARY STANDARD
MINIMUM
MISCELLANEOUS
MANAGEMENT
METER SET ASSEMBLY (GAS)
MOTOR
MOUNTING
MAKE UP AIR
N
NEW
NOT APPLICABLE
NORMALLY CLOSED
NATIONAL ELECTRICAL CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NATURAL GAS VEHICLE
NATIONAL PIPE STANDARD
NATIONAL PIPE THREAD
NOT IN CONTRACT
NOT IN SCOPE
NIPPLE
NUMBER, NORMALLY OPEN
NITROGEN DIOXIDE
NOMINAL PIPE SIZE
NOMINAL PIPE THREAD
NOT TO SCALE
O
OXYGEN
OUTSIDE AIR INTAKE
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
P
PUMP
PUSH BUTTON
PLAIN BOTH ENDS
POLYETHYLENE, PROFESSIONAL ENGINEER
PROCESS FLOW DIAGRAM
PRESSURE INDICATOR
PROPERTY LINE
PART NUMBER
PROGRAMMABLE LOGIC CONTROLLER
PLACES
POINT OF CONNECTION
PRESSURE
PRESSURE RELIEF VALVE
PIPE SUPPORT
POUNDS PER SQUARE INCH
PRESSURE SAFETY (RELIEF) VALVE
POUNDS-FORCE SQUARE INCH GAUGE, GRADIENT
POLYVINYL CHLORIDE
PIPE, VALVES, AND FITTINGS
Q
QUANTITY
QUALIFY, QUALIFICATIONS
R
RADIUS
REDUCER, OR REDUCING
REDUCING ELBOW
REDUCING TEE
REFERENCE
REQUIRED
REVISION
RAISED FACE FLANGE
RAISED FACE BLIND FLANGE
RAISED FACE WELD NECK FLANGE
REDUCING TEE
ROOM
RING TYPE JOINT
REINFORCED CONCRETE PIPE
REINFORCED, REINFORCEMENT
S
SUPPLY AIR
SCHEDULE
SECTION
SIMILAR
SOCKET WELD
SQUARE
SQUARE FOOT OR FEET
STANDARD CUBIC FEET PER HOUR
STAINLESS STEEL
SAMPLE CONNECTION
STANDARD CUBIC FEET
SO CAL GAS
SEWER DRAIN
SADDLE (PIPES)
SKILLET BLIND (PLATE BETWEEN FLANGES)
SLIP ON (FLANGE)
SOCKOLET
SPECIFICATIONS
SHORT RADIUS
SHORT RADIUS ELBOW
SAFETY RELIEF VALVE
STAINLESS STEEL
STANDARD (PIPE / FITTING SCHEDULE)
STEEL
SUBMERSIBLE TURBINE PUMP
STORAGE
STRUCTURAL
SHORT LENGTH OF PIPE OR ROD
SUSPENDED
SOCKET WELD, SWITCH
SWAGE NIPPLE
SAFE WORKING PRESSURE
T&C T&G
TBG
TEMP
THK
THD, THD'D
THRU
TI
TOL
TSP
TW
TYP
TX, XMTR
U/G
ULR
UN
UNO
ULT
VA
VAC
VERT
VOL
VTA
W W/
W/O
WE
WF
WN
WOL
WP
WT
XFMR
XS
XXS
YD
T
THREADED AND COUPLED
TONGUE AND GROOVE (FLANGE FACING)
TUBING
TEMPERATURE
THICK
THREAD, THREADED
THROUGH
TEMPERATURE INDICATOR
TOLERANCE, THREADOLET
TOTAL STATIC PRESSURE
THERMOMETER WELL
TYPICAL
TRANSMITTER
U
UNDER GROUND
UNLEADED REGULAR (GASOLINE)
UNION
UNLESS NOTED OTHERWISE
ULTRA LOW TEMPERATURE
V
VALVE
VOLTS ALTERNATING CURRENT, VACUUM
VERTICAL
VOLUME
VENT TO ATMOSPHERE
W
WIDE, WIDTH
WITH
WITHOUT
WELD END
WIDE FLANGE
WELD NECK (FLANGE)
WELDOLET
WORKING PRESSURE
WEIGHT, WALL THICKNESS
X
TRANSFORMER
EXTRA STRONG
EXTRA EXTRA STRONG, DOUBLE EXTRA STRONG
Y
YARD
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
ELECTRICAL &
CONTROLS
TYP 8
208105 201
SDS
MEN
WOMAN
UTIL
ROOM
ROOM
HYDROGEN YARD
CONCRETE LH2 DELIVERY AREA
NEMA 4
ENCLOSURE
304 304
GROUND STRIPING TYP
HP VENT
STACK
LP VENT
STACK
CANOPY OUTLINE
S. KINNELOA AVE.
BOIL OFF GAS
RECOVERY
COMPRESSOR
D-201 01_______
304 304
CANOPY COLUMN TYP 4
6" DIA. BOLLARD TYP
FUEL LANE 1
FUEL LANE 2
(CANOPY MOUNTED)
(SEE GENERAL NOTE 7)
(CANOPY MOUNTED)
(SEE GENERAL NOTE 7)
HYDROGEN SYSTEM
EMERGENCY SHUT-OFF
PARCEL BOUNDARY
(WITHIN PROJECT
SITE)
ALT #B
ALT# C
NITROGEN
TANKS
PROPERTY LINE
30'-0" AUTOMATIC
ROLLING GATE
(LOCKABLE) (TYP 2)
LH2 OFFLOAD PUMP
(ALT# A)
407204
407204
LOUVERED FENCE 15' TALL
30 GAL. METAL TRASH CAN
30 GAL. METAL
TRASH CAN
METAL DESK
METAL DESK
MASONRY WALL 10' TALL
COLD-CAPTURE RESERVE
AREA (SEE GENERAL NOTE 6)
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
LAYOUT OF HYDROGEN-PROCESS EQUIPMENT WITHIN
THE COMPOUND IS PRELIMINARY AND IS PROVIDED TO
SHOW INTENT. THE ARRANGEMENT OF THE EQUIPMENT
MAY BE REVISED, IF THE SPACE AND LAYOUT
CONSTRAINTS SHOWN ON THE DRAWINGS ARE
MAINTAINED AND IF APPROVED BY THE OWNER.
BACKUP GENERATOR SHALL BE SIZED TO START AND
OPERATE THE LOADS AS INDICATED ON SHEET E-611,
AND SHALL PROVIDE ONBOARD DIESEL FUEL PER THE
SPECIFICATIONS. A GENERATOR SMALLER THAN
SHOWN CAN BE PROVIDED, IF IT MEETS THE INDICATED
REQUIREMENTS AND IS APPROVED BY THE OWNER.
OPENINGS FOR BUILDING VENTILATION SHALL BE
DUCTED AS NEEDED TO MAINTAIN A MINIMUM 25 FT.
SEPARATION FROM THE HYDROGEN TANK AND RELIEF-
VALVE OUTLETS.
THE HEIGHT OF THE RESTROOM-UTILITY BUILDING
SHALL BE EQUAL TO THE HEIGHT OF THE COMPOUND
WALL AT 15'-0" AFF.
THE TYPE AND COLOR OF CONSTRUCTION MATERIALS
USED FOR THE COMPOUND WALL, RESTROOM-UTILITY
BUILDING AND PARKING CANOPY SHALL MATCH OR
OTHERWISE BE APPROVED BY THE OWNER.
RESERVE AREA FOR COLD-CAPTURE STORAGE/
PUMPING/ AND SPILL-RETENTION, AS OPTIONAL MEANS
OF PROVIDING CHILLED GH2 DISPENSING.
AIR-COOLED CHILLERS ARE NOT REQUIRED, IF OTHER
APPROVED MEANS OF PROVIDING CHILLED GH2
DISPENSING IS PROVIDED.
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:2
PM
As indicated
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
CONCEPTUAL FUELING EQUIPMENT
PLAN
2045321300
D-101
Hydrogen Fueling Facility City of Pasadena
1/8" = 1'-0"D-101
01 FUELING EQUIPMENT PLAN 4' 8' 16'0'
1/8" =1'-0"SCALE
SUMMARY EQUIPMENT LEGEND
ITEM DESCRIPTION QTY
101 REMOTE FILL BOX WITH INTERIOR GAS DETECTION 1
102 LH2 OFFLOAD FILL ADAPTER 1
105 LH2 CRYOGENIC PUMP, H35, 7250 MAWP 3
201 AMBIENT VAPORIZER, H35 2
202 PRIORITY SEQUENTIAL VALVE PANEL 1
203 GH2 HIGH PRESSURE STORAGE 8
204 H35 HYDROGEN DISPENSER 4
205 BOIL OFF GAS RECOVERY COMPRESSOR 1
206 GH2 ISOLATION VALVE COMPARTMENT 1
208 FLUID HEAT EXCHANGER 2
209 ULT AIR COOLED CHILLER 2
302 AIR COMPRESSOR 1
303 AIR DRYER 1
304 FIRE EXTINGUISHER IN CABINET 8
401 SWITCHGEAR / DISTRIBUTION PANEL 1
402 MOTOR CONTROL CONSOLE (MCC) 2
403 MASTER CONTROL PANEL 2
404 COMMUNICATION PANEL 1
405 ESD BUTTON 9
406 FLAME DETECTOR 4
407 FUEL MANAGEMENT TERMINAL 2
901 SERVICE PLATFORM 1
1.
2.
3.
SCHEDULE NOTES
SEE SHEET D-601 FOR DETAILED ITEM SCHEDULES.
NOT ALL ITEMS LISTED MAY APPEAR IN THIS DRAWING.
SOME ITEMS MAY BE SHOWN THAT ARE NOT LISTED.
N
NOT FOR
CONSTRUCTION
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
FLUID CHILLER
MOUNTED ON
CANOPY ROOF
TYP (2) PLCS
204 204
30 GAL. TRASH CANMETAL DESK
NEW SITE LIGHT
POLE, TYP
FULL HEIGHT
CMU WALL
H: 14'-0"
NEW PERIMETER
FENCE. H: 8'-0"
BUS PARKING CANOPY
CANOPY STEEL
COLUMN, TYP
8' CMU WALL,
BEYOND, TYP
N
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:3
PM
As indicated
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
CONCEPTUAL ELEVATIONS
2045321300
D-201
Hydrogen Fueling Facility City of Pasadena
0' 4' 8' 12'
3/16" =1'-0"SCALE
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
3/16" = 1'-0"D-201
01 GH2 DISPENSING ELEVATION
1/8" = 1'-0"D-201 2 Bus Parking Canopy East Elevation
DETAIL NOTES
1. PROVIDE MECHANICAL SCREENING OF CHILLERS AS
REQUIRED.
2. MECHANICAL SCREENING OF OTHER PROJECT
ELEMENTS IS NOT REQUIRED.
SUMMARY EQUIPMENT LEGEND
ITEM DESCRIPTION QTY
101 REMOTE FILL BOX WITH INTERIOR GAS DETECTION 1
102 LH2 OFFLOAD FILL ADAPTER 1
105 LH2 CRYOGENIC PUMP, H35, 7250 MAWP 3
201 AMBIENT VAPORIZER, H35 2
202 PRIORITY SEQUENTIAL VALVE PANEL 1
203 GH2 HIGH PRESSURE STORAGE 8
204 H35 HYDROGEN DISPENSER 4
205 BOIL OFF GAS RECOVERY COMPRESSOR 1
206 GH2 ISOLATION VALVE COMPARTMENT 1
208 FLUID HEAT EXCHANGER 2
209 ULT AIR COOLED CHILLER 2
302 AIR COMPRESSOR 1
303 AIR DRYER 1
304 FIRE EXTINGUISHER IN CABINET 8
401 SWITCHGEAR / DISTRIBUTION PANEL 1
402 MOTOR CONTROL CONSOLE (MCC) 2
403 MASTER CONTROL PANEL 2
404 COMMUNICATION PANEL 1
405 ESD BUTTON 9
406 FLAME DETECTOR 4
407 FUEL MANAGEMENT TERMINAL 2
901 SERVICE PLATFORM 1
1.
2.
3.
SCHEDULE NOTES
SEE SHEET D-601 FOR DETAILED ITEM SCHEDULES.
NOT ALL ITEMS LISTED MAY APPEAR IN THIS DRAWING.
SOME ITEMS MAY BE SHOWN THAT ARE NOT LISTED.
The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of Stantec. Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Copyright Reserved
A
ORIGINAL SHEET - ARCH D
4 3 2 1
B
C
D
Issue/Revision YYYY.MM.DD
Drawing No.Revision
Project No.
Title
Scale
Client/Project
Client/Project Logo
Permit/Seal
1/
/2
3:
:3
PM
A ut od es k D oc s:/
/2
0_
Pa sa d en a_ Hy d ro ge n/
P
A
SA
D
EN
A H
YD
RO
G
EN
FU
EL
.rv t
Stantec Consulting Services Inc.
801 South Figueroa Street Suite 300 Los Angeles, CA 90017-3007 Tel: (213) 955-9775 • www.stantec.com
159 S. Kinneloa Ave, Pasadena, CA 91107
CONCEPTUAL FUELING EQUIPMENT
SCHEDULE
2045321300
D-601
Hydrogen Fueling Facility City of Pasadena
EQUIPMENT SCHEDULE
ITEM DESCRIPTION QTY SPECIFICATIONS MANUFACTURER / VENDOR MODEL
101 REMOTE FILL BOX WITH INTERIOR GAS
DETECTION 1 ENCLOSURE FOR MOUNTING LH2 FILL ADAPTER. SHALL INCLUDE GAS DETECTION (DRAGER OR HONEYWELL SUITABLE FOR HYDROGEN) AND
2" QUICK-CONNECT FOR AIR SUPPLY TO TRAILER SUPPLY VALVE. OPW LINDE-HQK
102 LH2 OFFLOAD FILL ADAPTER 1 LINDE HQK SERIES CRYOWORKS CP05194
105 LH2 CRYOGENIC PUMP, H35, 7250 MAWP 3
LIQUID HYDROGEN CRYOGENIC PUMP SKID ASSEMBLY, MAWP: 7250 PSIG, 300KG/HR AT 45.9MPA, 125HP MOTOR TEFC, 1800RPM ONBOARD PRESSURE LUBE OIL SYSTEM WITH COOLER, TRIPLEX WITH SINGLE BAYONET PUMP SUCTION AND VAPOR RETURN AT 1-1/2" 304/316SS SCH10, 9/16" (MIN.) MEDIUM PRESSURE TUBE END FOR CONE/THREAD MATING CONNECTION. (2 IN BASE SCOPE, ONE AS ADD ALTERNATE.)
CS&P, OR APPROVED EQUAL (NIKKISO, LINDE) LH2, 3-ICP-200, 180 KG-HR, 40 MPA
201 AMBIENT VAPORIZER, H35 2 AMBIENT VAPORIZER, CAPACITY 20KG/HR FOR 8-HOUR CONTINUOUS DUTY CYCLE, MAWP: 7250 PSIG AT -423°F TO 150°F, ALUMINUM FINS, SA312-304/304L, PIPING SA312-304/304L, TUBING SA213-304/304L, CONSTRUCTED PER ASME SECTION VIII, DIV1. CRYOQUIP OR APPROVED EQUAL VAI-TWS-SSLTY
202 PRIORITY SEQUENTIAL VALVE PANEL 1
CASCADE VALVE PANEL, NEMA 4X CABINET, 3/4" MEDIUM-PRESSURE C/T CONNECTIONS TO GH2 STORAGE, 3/4" OR 9/16" MEDIUM-PRESSURE C/T CONNECTION TO PUMP DISCHARGE AND DISPENSER FEED LINES. MAWP: 15,000 PSIG. 'NEEDLE' TYPE ISOLATION VALVES AND AIR-ACUTATED ESD VALVE. CONSTRUCTION SHALL BE SUITABLE FOR CL.1 DIV.2 GR.B HAZARDOUS AREA. BOTTOM ENTRY FOR ALL PROCESS CONNECTIONS. INSTALL PRESSURE TRANSMITTERS SUITABLE FOR OPEPRATING PRESSURE, FOR ALL PROCESS CONNECTIONS.
CUSTOM 2IN-4OUT
203 GH2 HIGH PRESSURE STORAGE 8
COMPRESSED GASEOUS HYDROGEN, 31' X 20" OD, DESIGN TEMP: -5C (MIN) / 93C (MAX), ASME SECTION VIII, WATER VOLUME: 41.98 CU.FT, NOMINAL CAPACITY: 37.1 KG @ 500 BARG. INCLUDE ASME-STAMPED PRESSURE RELIEF VALVE WITH 7250 PSI SET PRESSURE AND MIN. RATED
CAPACITY OF 5225 SCFM, HYDROGEN SERVICE, 9/16" NEEDLE SHUT-OFF VALVE.
CP INDUSTRIES, OR FIBA INDUSTRIES 20-23-5500
204 H35 HYDROGEN DISPENSER 4
HYDROGEN DISPENSER, TRANSIT FLEET. 110VAC 5AMP, PACIFIC SERIES XB CABINET, INTEGRATED FLUID HEAT EXCHANGER BY VPE, +40C TO +40C MAX FLOW OF 3.6KG/MIN. SINGLE SIDE 1-HOSE WEH TK16 OR EQUAL OPW HIGH-FLOW NOZZLE W/ IRDA, 350 BAR, FUEL & SIAMESE-VENT HOSE W/ INLINE BREAKAWAYS. C/W MIN. 10" COLOR DISPLAY WITH SOFT KEYS, FLEET/TRANSIT PULSE OUTPUT VOLUME ONLY, RHEONIK RHM 10 CORIOLIS METER, TEMPERATURE TRANSMITTER PER FUELING LINE, 5 MICRON FILTER. COMPLY WITH SAE J2601/2 FILL ALGORITHM, NRTL
TYPE APPROVAL CERTIFICATION WEIGHTS & MEASUREMENT, NFPA 2, NFPA 496, AND HGV 4.
BENNETT H35HF (OR EQUAL ANGI/GILBARCO)
205 BOIL OFF GAS RECOVERY COMPRESSOR 1 ~ ~ ~
206 GH2 ISOLATION VALVE COMPARTMENT 1 NEMA 4X ENCLOSURE CONTAINING AUTOMATIC BLOWDOWN VALVES FOR HIGH-PRESSURE GH2-STORAGE LINES. VARIOUS CUSTOM 208 FLUID HEAT EXCHANGER 2 DIFFUSION BONDED HEAT EXCHANGER. KELVION OR APPROVED EQUAL ~
209 ULT AIR COOLED CHILLER 2
OUTDOOR STAND-ALONE ULTRA LOW TEMP AIR COOLED CHILLER WITH INTEGRATED PUMP & TANK SYSTEM. ADJUSTABLE SETPOINT (-40C TO -25C), FACTORY SET TO -25C, HEAT TRANSFER FLUID: DYNALENE HF-LO, PLC CONTROLLER WITH HMI AND MODBUS TCP/IP. 460VAC/3PH/60HZ, NEMA4 ENCLO
FLUID CHILLERS, INC. AIR30,000-ULT-460/3-OUT
302 AIR COMPRESSOR 1
DUPLEX 5HP TWO-STAGE AIR COMPRESSOR C/W MINIMUM 80-GALLON HORIZONTAL RECEIVER, MIN. 13 CFM FREE-FLOW PER COMPRESSOR, AFTER COOLER, 175 MAWP, AND SPLASH LUBRICATION. MOTORS TO BE CONTINUOUS DUTY W/ DRIP-PROOF CONSTRUCTION. INCLUDE OPTIONS FOR 460V 3-PHASE POWER, AUTOMATIC/ALTERNATING COMPRESSOR START, NEMA 4 CONTROL BOX, LOW-OIL SHUTOFF AND
COALESCING AFTER-FILTER FOR OIL CONTROL.
QUINCY OR APPROVED EQUAL 253DC80DC46
303 AIR DRYER 1
AIR DRYER WITH TWIN-TOWER DESICCANT BEDS THAT REGENERATE USING AUTOMATIC PURGE AND NO HEAT. C/W 1/2" PORTS, NEMA-4 CONSTRUCTION, 25 SCFM FLOW RATING, 120V 50A INPUT POWER, 150 PSIG MAWP AND REMOTE OPERATING INTERCONNECT THAT ALLOWS PURGE ONLY WHEN COMPRESSOR IS OPERATING. INCLUDE ACCESSORIES: MOISTURE INDICATOR AND FLOOR-STAND KIT.
CHAMPION CDHM25-1-2
304 FIRE EXTINGUISHER IN CABINET 8
2-A:20-B:C DRY-CHEMICAL FIRE EXTINGUISHER. 10 LB CAPACITY IN STEEL CONTAINER WITH 195 PSI CHARGE, MIN 11 SECOND DISCHARGE CAPACITY, DIRECTIONAL NOZZLE, AND PRESSURE GAUGE. PROVIDE IN FIBERGLASS OR ALUMINUM HOUSING W/ CLEAR FRONT PANEL,RATED
FOR OUTDOOR INSTALLATION.
KIDDIE PRO PLUS 20 MP 468003
401 SWITCHGEAR / DISTRIBUTION PANEL 1 MAIN ELECTRICAL SWITCHBOARD WITH UTILITY-SERVICE ENTRANCE AND METER SECTION. PROVIDE WITH MIN. 800A 480V MAIN BUS AND MAIN BREAKER AND INCLUDE DISTRIBUTION CIRCUITS AS REQUIRED BY FINAL DESIGN. EATON, SQUARE-D OR EQUAL VARIOUS
402 MOTOR CONTROL CONSOLE (MCC) 2 PROVIDE WITH VARIABLE SPEED PUMP-MOTOR CONTROLLERS MATCHED TO EACH LH2 PUMP MOTOR. INCLUDE REMOTE-SUPERVISION OUTPUT AND TVSS. ABB, SQUARE D OR EQUAL <varies>
403 MASTER CONTROL PANEL 2 SEE ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. <varies> <varies>
404 COMMUNICATION PANEL 1 INTERNET LANDING AND IP DATA SWITCH + IPX COMMUNICATION MODULE. HOUSE IN A NEMA 4 ENCLOSURE AND EQUIP WITH 120V 20A UPS
FOR CLEAN POWER. CUSTOM VARIOUS
405 ESD BUTTON 9 HOUSED IN A DIE-CAST, SUITABLE FOR OUTDOOR INSTALLATION, NEMA 4 ENCLOSURE WITH CLEAR FLIP COVER, NORMALLY CLOSED, PUSH
BUTTON TO OPEN CIRCUIT. APPLETON OR EATON SURFACE MOUNT
406 FLAME DETECTOR 4
CAPABLE OF DETECTING HYDROGEN FIRES (NON-HYDROCARBON), FIELD OF VIEW: 120° UP TO 60 FT DETECTION, LISTING APPROVALS: FM, ATEX HAZARDOUS RATING: CLASS 1 DIV 1 GROUP B, D5, RELAYS: NO CONTACTS FOR FIRE DETECTION AND FAULTS (LATCHING FOR MANUAL RESET) OPERATING TEMP RANGE: -40 TO +85°C POWER: 24VDC HOUSING: IP66 (OUTDOOR RATED), CONDUIT CONX: 3/4 ” NPT
HONEYWELL SS4-AS2-SS
407 FUEL MANAGEMENT TERMINAL 2
AUTHORIZE AND RECORD FUELING TRANSACTIONS FOR ITS CONNECTED DISPENSER. PROVIDE AUTOMATIC AUTHORIZATION BY VEHICLE RFID AND FUELER AUTHENTICATION VIA KEY PAD OR PROXIMITY CARD. WIRE COMMUNICATION FROM TERMINAL TO DISPENSER USING TWO-WIRE DATA PROTOCOL SUCH AS CURRENT LOOP OR EQUAL, AND CONNECT EACH TERMINAL TO LAN IP DATA SWITCH. FINAL
TERMINATIONS AND STARTUP ONLY BY FACTORY-AUTHORIZED TECHNICIAN.
EJ WARD W4 (NO SUBSTITUTIONS)
455 SURVEILLANCE CAMERA 1 EXTERIOR LIGHT POLE MOUNTED OUTDOOR RATED PTZ CAMERA (SCHEDULE NOTE 7) MATCH NETWORKS VA4 OUTDOOR IR DOME
901 SERVICE PLATFORM 1 FURNISH WITH INTEGRATED STEPS TO GRADE @ MAX 7" RISE. TREADS AND PLATFORM SURFACE SHALL BE NON-SLIP AND SHALL BE RATED TO SUPPORT 800 LB. FURNISH WITH RAILING FOR STAIRS AND AROUND PLATFORM. FABRICATE FROM SS OR OTHER APPROVED MATERIAL. ERECT A STEP OR APPROVED EQUAL VARIOUS
1.
2.
3.
4.
5.
6.
SCHEDULE NOTES:
SEE SHEETS G-101 AND D-101 FOR ITEM LOCATIONS. SOME EQUIPMENT LISTED MAY NOT HAVE AN INDICATED LOCATION.
THE LIST OF EQUIPMENT GIVEN HERE IS PARTIAL. DESIGN-BUILDER SHALL FURNISH ALL EQUIPMENT, LABOR, CONDUIT, WIRE, PIPING, MATERIAL AND TESTING SERVICES AS REQUIRED TO DELIVER A COMPLETE AND FUNCTIONAL HYDROGEN FUELING SYSTEM REQUIRED BY THE PLANS, DRAWINGS, AND SPECIFICATIONS, AND AS APPROVED BY THE OWNER.
MEASURE AND DETERMINE QUANTITIES OF PIPING, CONDUIT, WIRING AND SUPPORTS AS REQUIRED PER PROJECT AND
FIELD REQUIREMENTS.
SEE SPECIFICATION MANUALS FOR ADDITIONAL REQUIREMENTS FOR EQUIPMENT AND MATERIALS.
THE EQUIPMENT, MANUFACTURERS AND MODELS LISTED IN THE PROJECT DOCUMENTS ARE PROVIDED TO ESTABLISH THE MINIMUM FUNCTIONAL AND PERFORMANCE CRITERIA FOR THE PROJECT. ALTERNATES THAT MEET THE FUNCTION
AND PERFORMANCE OF THE LISTED ITEMS ARE ACCEPTABLE, IF APPROVED BY THE OWNER.
ALL PIPING, TUBING AND COMPONENTS WETTED BY HYDROGEN SHALL BE LISTED AS BEING SUITABLE FOR USE WITH
HYDROGEN AND CLEANED FOR OXYGEN SERVICE IN ACCORDANCE WITH CGA G-4.1.
30% DD 2025.08.15
ISSUED FOR RFP 2026.01.07
PI
PI
PT PT
TT
TT
PI
PT PT
PT
S VTA
302 303
PRIORITY
SEQUENTIAL
VALVE PANEL
P = 0.5 TO 2.5 BARG
T = -255°C
LOW BANK
H35 TRANSIT
DISPENSER #1
P = 0.5 TO 2.5 BARG
T = -255°C
CHILLER #1
AIR SOLENOID
JBOX
AOV-XXX
ESD
XXX
V-XXX
V-XXX
PSV
XXX
HIGH BANK
MEDIUM BANK
MEDIUM BANK
LOW BANK
GD
XXX
(6) N2 CYLINDERS FOR
STORAGE ISOLATION VALVE ESD
PCV-XXX
90 PSI
PSV-XXX
120 PSI
AOV-XXX CV-XXX1/2"
DISPENSER #1 FEED
GH2 AMBIENT
VAPORIZER #1
ESD
DISPENSER #2 FEED
DISPENSER #1 BYPASS PRECOOLING
DISPENSER #2 BYPASS PRECOOLING
MED BANK
HIGH BANK
100 PSI
P = 0 TO 350 BAR
T = -20 TO -40°C
Q = 7.2KG/MIN (MAX)
AOV-XXX
VENT
H1
AIR SUPPLY
HEADER
P = 100 TO 450 BAR
T = AMBIENT (0 TO +40°C)
L1 L1
H2
HYDROGEN VENT STACKS IN HYDROGEN COMPOUND BY CONTRACTOR.
L1 H1
H2
CANOPY ROOF
COMPRESSED AIR
< GH2 SUPPLY <
L1
LOW PRESSURE
VENT STACK
HIGH PRESSURE
VENT STACK
SCREENED
OPENINGS TYP
HYDROGEN
CRYO TANK
ASSY
A/G U/G
LH2 OFFLOAD
PUMP
AOV-XXX
ESD
AOV-XXX
ESD
AOV-XXX
ESD
AOV-XXX
ESD
AIR SOLENOID
JBOX
L1L1
AOV-XXX
AOV-XXX
AOV-XXX
M
M
AIR SOLENOID
JBOX
M
AIR SOLENOID
JBOX
M
AIR SOLENOID
JBOX
BY TANK MFGRBY DESIGN-
BUILDER
In A
In BOut B
Out A
FHX #2
In A
In BOut B
Out A
33 201
GH2 AMBIENT
VAPORIZER #2
XXX
< COLD SUPPLY <
> WARM RETURN >
H35 TRANSIT
DISPENSER #2
CHILLER #2
ESD
P = 20 PSI
T = -20 TO -35°C
Q = GPM
P = 20 PSI
T = AMBIENT (0 TO +40°C)
Q = 30GPM
GH2 SUPPLY
COLD SUPPLY
WARM RETURN
P = 20 PSI
T = -20 TO -35°C
Q = GPM
P = 20 PSI
T = AMBIENT (0 TO +40°C)
Q = 30GPM
P = 100 TO 450 BAR
T = AMBIENT
(0 TO +40°C)
LOW
BANK
MED BANK
HIGH BANK
AOV-XXX
ESD
AOV-XXX
ESD
AOV-XXX
ESD
XXX
XXX
FD
V-XXX
H2
XXX
V-XXX
H2
XXX
COMPRESSED AIR
V-XXX
V-XXX
PSV
XXX
PSV
XXX
XX
AIR SUPPLY
HEADER
BOG RECOVERY COMPRESSOR
M
120 GAL
175 PSI MAWP
AIR COMPRESSOR XX XX PSV-XXX
130 PSI
1/2"
AIR
DRYER
HIGH BANK
LOW BANK
LOW BANK
LOW BANK
GV-XXXRD-XX
TYP 8 500 BAR
500 BAR
500 BAR
500 BAR
500 BAR
500 BAR
500 BAR
500 BAR
P = 100 TO 450 BAR
T = AMBIENT (0 TO +40°C)
Q = 3 TO 5KG/MIN
FHX #2
AI
R
SO
LE
NO
ID
JB
OX
AOV-XXX
P = 100 TO 450 BAR
T = AMBIENT (0 TO +40°C)
Q = 3 TO 5KG/MIN
AOV-XXX
ESD
BALL VALVE
AIR/GAS ACTUATED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .