CON26-0006_Attachment_3_04.21.25_Utility_Submittal__11891.pdf

PDF 1 MB Posted

Attached to
EXT REC | CON26-0006 Precita Park - MLBE
Solicitation number
SFGOV-0000010933
Issued by
San Francisco County, San Francisco City, California

About this file

This is a utility submittal document for a restroom building project at Precita Park in San Francisco, California, submitted by The Public Restroom Company to the City of San Francisco on April 21, 2025. The submittal includes design drawings, utility location plans, and specifications necessary to complete final construction drawings and prepare for building installation at the site. The document requests completion of a Utility Location Plan identifying the points of connection (P.O.C.) for sewer, water, and electrical services, with all P.O.C. locations required to be positioned 4 to 6 feet from the building slab edge. The City of San Francisco contact is Eoanna Goodwin (628-652-6645), and the document has been marked as approved by the City. The submittal includes detailed specifications for water supply (1.5-inch copper type K service line, 46 to 60 psi required pressure), electrical service (40 amps, 2-phase, 1.5-inch galvanized rigid steel conduit at 18 inches minimum depth), and sewer service (4-inch VCP ASTM C-700 extra strength pipe at 18 inches depth).

The utility information provided in the completed submittal is essential for maintaining the project timeline for delivery of the modular restroom building. The City has provided specific utility details including electrical service specifications (40A/2Phase), water meter size (1.5 inches), water pressure (90 psi), sewer specifications (4-inch VCP at 18 inches depth), and material requirements. This submittal supports the broader Precita Park improvements project, which is a Micro LBE Set-Aside solicitation with an Engineer's Estimate of $200,000, a pre-bid meeting held on July 24, 2025, and bids due by August 7, 2025 at 2:30 p.m.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RESTROOM UTILITY SUBMITTAL

April 21, 2025 Precita Park

San Francisco, CA

OWNER

City of San Francisco, CA 49 South Van Ness Ave, Suite 1220 San Francisco, CA 94103 Contact: Eoanna Goodwin Phone: 628-652-6645

THE PUBLIC RESTROOM COMPANY

CUSTOMER APPROVAL

APPROVED

APPROVED EXCEPT AS NOTED

REVISE AS NOTED AND RESUBMIT

APPROVED by _____________Date _______

Letter of Transmittal

To: Eoann Goodwin Re: Precita Park – San Francisco, CA

49 South Van Ness Ave, Ste 1220 San Francisco, CA 94103 Date: April 21, 2025

Please find enclosed:

Design Drawings X Cover Letter Change Order Plans X Utility Location Plan Samples

Specifications Bid Plan Pages Color Charts

Color Selection Schedule Other:

Qty Description 1 Cover Letter 1 Utility Plan to be completed

Please contact us if you have any questions.

Mike Meglen – Project Coordinator For – Steve Myler – Regional Sales Manager Phone: (888) 888-2060 Fax: (888) 888-1448 meglen@publicrestroomcompany.com SteveM@publicrestroomcompany.com mailto:meglen@publicrestroomcompany.com mailto:SteveM@publicrestroomcompany.com

April 21, 2025

Eoanna Goodwin

49 South Van Ness Ave, Suite 1220 San Francisco, CA 94103

RE: POC Utilities Submittal for Precita Park Restroom

Dear Eoanna Goodwin, Enclosed please find our POC Utility Locations Submittal for your completion and approval.

This information is needed to complete the final construction drawings and prepare for the building set at the site. Answers to this submittal will also enable us to maintain our timeline for delivery of this project.

The information requested is to obtain the utility point of contact locations and other utility details. Please complete the Utility Location Plan for the building with the requested information, sign, date, and return your approval. Again, this information is vital for our preparation of the building set at the site.

Thank you for your prompt attention to this request.

Respectfully, Mike Meglen – Project Coordinator For – Steve Myler – Regional Sales Manager Phone: (888) 888-2060 Fax: (888) 888-1448 meglen@publicrestroomcompany.com SteveM@publicrestroomcompany.com mailto:meglen@publicrestroomcompany.com mailto:SteveM@publicrestroomcompany.com

LOCATION OF UTILITY

P.O.C. TO BE 4' MIN. 6' MAX

FROM BUILDING SLAB EDGE

4'- 0"

MI

N.6'-

0"

MA

X

RESTROOM BUILDING - OPTION 'B' 11891

DRAWN BY:C O P Y R I G H T 2 0 2 5 , P U B L I C R E S T R O O M

COMPANY THIS MATERIAL IS THE EXCLUSIVE

PROPERTY OF PUBLIC RESTROOM COMPANY

AND SHALL NOT BE REPRODUCED, USED, OR

D I S C L O S E D T O O T H E R S E X C E P T A S

AUTHORIZED BY THE WRITTEN PERMISSION

O F P U B L I C R E S T R O O M C O M P A N Y .

PROJECT:

BUILDING TYPE: DATE:

PROJECT #:

SHEET:

~NOT FOR CONSTRUCTION ~ PRELIMINARY DESIGN DRAWING ONLY ~ DO NOT SCALE, DIMENSIONS PRESIDE

PRECITA PARK

SAN FRANCISCO, CA

03/20/2025

JAG

Building Better Places To Go.

Ph: 888-888-2060 Fax: 888-888-1448

CONCRETE UTILITY GROUND

BOX MARKED "ELECTRIC"

(BY OTHERS)

FINAL LOCATION "TBD"

E

CONCRETE UTILITY GROUND

BOX MARKED "WATER"

(BY OTHERS)

FINAL LOCATION "TBD"

W

UTILITY LOCATION & BUILDING ORIENTATION PLAN

N

CONCRETE UTILITY GROUND

BOX MARKED "SEWER"

(BY OTHERS)

FINAL LOCATION "TBD"

S

UTILITY

1. INDICATE NORTH ON THE COMPASS AS IT RELATES TO THE ORIENTATION OF

THE BUILDING FLOOR PLAN SHOWN.

2. INDICATE ON FLOOR PLAN THE SEWER, WATER, AND ELECTRICAL POINT OF

CONNECTION (P.O.C.). LOCATION TO BE 4' MIN. 6' MAX. FROM SLAB EDGE.

4. WATER SERVICE:

4.1. METER SIZE:

4.2. SIZE TO P.O.C.:

4.3. PRESSURE AT METER AND OR P.O.C.

(INDICATE WHICH):

4.4. DISTANCE FROM METER TO P.O.C.:

4.5. ELEVATION DIFFERENCE FROM METER TO P.O.C.:

4.6. P.O.C. DEPTH:

4.7. MATERIAL:

4.8. COMMENTS:

5. SEWER SERVICE:

5.1. SIZE:

5.2. DEPTH:

5.3. MATERIAL:

5.4. COMMENTS:

3. ELECTRICAL SERVICE:

3.1. CONDUIT SIZE:

3.3. DEPTH:

3.4. MATERIAL:

3.5. COMMENTS:

APPROVED BY:

DATE:

BUILDING WATER SUPPLY DETAILS:

1. FIXTURE UNITS: 46.75 (CPC-UPC)

2. BUILDING DEVELOPED LENGTH (TO P.O.C. 6' MAX. FROM BLDG.): 27'-11"

3. REQUIRED PRESSURE: 46 to 60 psi

4. HIGHEST FIXTURE OR OUTLET ABOVE FINISH FLOOR: 4'

5. SUPPLY FROM SITE P.O.C. TO BUILDING: 1 1/2"

THE FOLLOWING TO BE COMPLETED BY CLIENT:

(Please Sign & Print)

3.2. SERVICE SIZE (VOLTAGE/AMP/PHASE):

NOTE: LOCATE UTILITY P.O.C. LOCATIONS ON FLOOR PLAN.

LOCATION TO BE 4' MIN. 6' MAX. FROM SLAB EDGE.

eoanna.Goodwin Snapshot eoanna.Goodwin Snapshot eoanna.Goodwin Snapshot eoanna.Goodwin Text Box 1.5" eoanna.Goodwin Text Box

40 A/ 2PHASE

eoanna.Goodwin Text Box

18" MIN

eoanna.Goodwin Text Box

GALVANIZED RIGID STEEL

eoanna.Goodwin Text Box 2" eoanna.Goodwin Text Box 1 1/2" eoanna.Goodwin Text Box

90 PSI

eoanna.Goodwin Text Box

20', VIF

eoanna.Goodwin Text Box eoanna.Goodwin Text Box

SAME

eoanna.Goodwin Text Box

COPPER TYPE K

eoanna.Goodwin Text Box 4" eoanna.Goodwin Text Box

18", VIF

eoanna.Goodwin Text Box

VCP ASTM C-700 EXTRA STRENGTH PIPE

CONDUIT SIZE:
ELECTRICAL SIZE (VOLTAGE/AMP):
ELECTRICAL DEPTH:
ELECTRICAL MATERIAL:
ELECTRICAL COMMENTS:
WATER METER SIZE:
WATER P:
O:
C:
SIZE:
WATER PRESSURE AT METER AND/OR P:
O:
C:
DISTANCE FROM WATER METER TO P:
O:
C:
ELEVATION DIFFERENCE FROM METER TO P:
O:
C:
P:
O:
C:
DEPTH:
MATERIAL:
COMMENTS:
SEWER SIZE:
SEWER DEPTH:
SEWER MATERIAL:
SEWER COMMENTS:
DATE: