Component_1_-_ITS_Full_Set.pdf

PDF 48 MB Posted

Attached to
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation number
2095-SCP
Issued by
York County, South Carolina

About this file

This is a Scope of Work document for the City of Rock Hill's Downtown Traffic Management Project, specifically Component 1 focusing on an Intelligent Transportation System (ITS). The project involves the design and implementation of a comprehensive ITS infrastructure to improve traffic management and safety in the downtown area. The ITS component includes the installation of traffic signal systems, detection equipment, communication networks, and central management software to enable real-time monitoring and control of traffic flow. Bidders must be SCDOT prequalified prior to receiving bid documents and must submit proof of qualification to Campco Engineering, Inc. The submission deadline for bids is 2:00 pm on Wednesday, November 18, 2026, with submissions required through the City of Rock Hill Procurement Division eProcurement Portal by OpenGov. All bidding is restricted to prequalified contractors, and detailed specifications for equipment, installation standards, testing procedures, and performance requirements are outlined to ensure the system meets municipal traffic management standards.

The document establishes specific technical requirements for ITS components, including signal coordination protocols, detection sensor specifications, and communication system standards that contractors must meet. Pricing is to be submitted as part of the sealed bid process through the designated online portal. The project represents a significant infrastructure investment in downtown traffic optimization and appears to be funded through municipal capital improvement or federal transportation funding sources. No specific set-asides, incumbent contractors, or renewal options are detailed in this component document, though the project's two-phase structure suggests ongoing development with Component 2 addressing Wilson Street improvements as a complementary initiative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .